Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Building Construction
Opening Date7 Mar 2024
Closing Date18 Mar 2024
Tender Amount₹ 12,31,278 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building;Painting to new wood with two coats of ready mixed synthetic enamel paint first quality all shades over a base coat of wood primer making three coats in all to give an even shade after thoroughly brushing the surface toremove all remains of loose podered materials, including c/c of all materials, site and other taxes, all operations indidental and labour cherges etc complete for finshed item of work in all flooring for external walls.

56.51

234

13223.91

... More
Building;Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 Internal Walls

473.21

212

100434.09

... More
Building;Providing skirting to internal walls to 15 cm height/risers of steps with 15 to 18 mm thick polished Cuddapah stone length equal to flooring stones, set over base coat of CM (1:3) 12mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste materials like Cuddapah stone, cement, sand and water etc., complete including seignoirage charges, etc., complete for finished item of work but exeluding the cost of conveyance of all materials.

4.03

1251

5044.67

... More
Building;Flooring with Double charge/multi charged stain free full body porcelain vitrified itiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS: 13712, IS:13630 (parts 1 to 15) of any colur anf finish in all shades and designs set over base coat of cement mortar (1:8) 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honeyt like consistency spread @ 3.3 kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade including cost of all materials like cement sand water and tiles etc complet, including seigniorage chearges, etc, complet for finished item of work but excluding the cost of conveyance of all materls

49.19

1229

60499.27

... More
Building;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM(1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales &all taxes on all materials, operational, includintal and labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., complete for Even surfaces of wall for finished item of work. (SS 901,903 & 904)

223.91

534

119677.66

... More
Building;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including c/c of all materials like cement, sand,water etc., to site, all materials, all operational, incidental and labour charges, finishing ,including cutting of Grooves wherever necessary as directed by Engineer-in-charge, curing, etc., complete for uneven surface of brick wall for finished item of work (APSS No.901,903 & 904) Extenal Walls

181.09

521

94516.3

... More
Building;Ornamental plastering to ceiling 12mm thick in CM (1:3) with dubara sponge finish including Cost and Conveyance of all materials like cement, sand, water etc., to site, including other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, finishing, scaffolding, lift charges, including cutting of Grooves wherever necessary as directed by Engineer-in-charge, curing, etc., complete for finished item of work.(APSS 901& 903 )

68.21

215

14723.81

... More
Building;Supply and fixing of salwood Window size 0.90 x 1.35 mt with non teak/ Sal wood frame of size 75 x 100 mm along with Non teak/ Sal wood three shutters made with styles & rails of 100 mm x 30 mm thick including s/f of MS Hold fasts, Ms twoers bolts 100 mm long. MS Hinges 75mm oong incl all labour charges such as making window frame & shutters and fixing 11 nos 16 mm plainsafety bars in to frame etc.

6

8362

50177.4

... More
Building;Supply and fixing of salwood Window size 1.50 x 1.35 mt with non teak/ Sal wood frame of size 75 x 100 mm along with Non teak/ Sal wood three shutters made with styles & rails of 100 mm x 30 mm thick including s/f of MS Hold fasts, Ms twoers bolts 100 mm long. MS Hinges 75mm oong incl all labour charges such as making window frame & shutters and fixing 11 nos 16 mm plainsafety bars in to frame etc.

4

12982

51928.6

... More
Building;Supply and fixing of salwood Door single shutter fully pannlled door of size 0.90 x 2.10 mt with frame made of well seasoned Sal Wood scantings of size 100 x 75 mm and bottom reeper of size 75x38 mm and shutter made of side rails 125mm x38 top rail 125 mm x 38mm bottom rail 125mmx38 mm and inermediate rails of 125 x 38 ,, amd [ame;s 4 no's are of 25mm thick as per approved design with fixtures of 9" z" holfasts, aldrop, butt hinges, door stoppers, tower bolts handles with necessary screws complete including cost and conveyance of all materilas and labour charge etc, complete as per specifications.

2

9727

19454

... More
Building;Supply and fixing of salwood Door single shutter fully pannlled door of size 1.20 x 2.10 mt with frame made of well seasoned Sal Wood scantings of size 100 x 75 mm and bottom reeper of size 75x38 mm and shutter made of side rails 125mm x38 top rail 125 mm x 38mm bottom rail 125mmx38 mm and inermediate rails of 125 x 38 ,, amd [ame;s 4 no's are of 25mm thick as per approved design with fixtures of 9" z" holfasts, aldrop, butt hinges, door stoppers, tower bolts handles with necessary screws complete including cost and conveyance of all materilas and labour charge etc, complete as per specifications.

1

11248

11248.77

... More
Building;Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc., cpomplete with a compresive streangth not lessthan 50 kg/sqm for walls for Superstructure Walls.

15.8

8092

127863.87

... More
Building;Filling with gravel (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and Cost and Conveyance of water to site and all operational, incidental, labour charges, , sales and other taxes etc, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

31.44

491

15448.36

... More
Building;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including Cost and Conveyance of all materials like cement, sand, water proofing compound, water etc., to site, on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).

51.17

555

28408.56

... More
Building;Sunshades

5.4

1221

6595.02

... More
Building;Lintels

0.18

12839

2311.16

... More
Building;Roof Slab 115 mm thick

51.17

1396

71461.98

... More
Building;Roof Beams

2.79

12226

34111.6

... More
Building;Plinth Beams

2.79

12190

34011.5

... More
Building;Columns

2.7

12865

34735.55

... More
Building;Pedastals

0.82

9880

8102.18

... More
Building;Footings

4.37

9184

40138.14

... More
Building;Random Rubble stone masonry, in CM (1:6) prop: (Cement: Sand) using hard granite stones from approved quarry including Cost and Conveyance of all materials like Granite stones, cement, sand, water, etc., to site including all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation (APSS No. 601 & 615)

19.09

4055

77425.03

... More
Building;Plain Cement Concrete corresponding to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations (APSS No. 402)

7.11

4383

31167.68

... More
Building;Plain Cement Concrete corresponding to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations (APSS No. 402)

1.8

4575

8235.11

... More
Building;Earthwork work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, labour charges such as shoring sheeting, planking, strutting, etc,. Complete for finished item of work including seigniorage excluding dewatring charges etc., as per SS-20B (APSS308)

41.54

270

11235.32



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.