Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Civil Works Roads
Opening Date11 Jun 2021
Closing Date19 Jun 2021
Tender Amount₹ 3,79,33,566 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

76.2

-

5514.59

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

59.93

-

409302.72

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

84.6

-

202908.02

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

9.59

-

3085.29

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

56.4

-

4081.67

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

74.59

-

509425.83

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

105.3

-

252555.73

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

11.93

-

3838.12

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

70.2

-

5080.37

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

72.04

-

492010.15

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

101.7

-

243921.35

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

11.53

-

3709.43

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

67.8

-

4906.69

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

72.04

-

492010.15

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

101.7

-

243921.35

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

11.53

-

3709.43

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

67.8

-

4906.69

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

65.66

-

448436.79

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

92.7

-

222335.39

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

10.51

-

3381.28

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

61.8

-

4472.47

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

72.04

-

492010.15

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

101.7

-

243921.35

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

11.53

-

3709.43

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

67.8

-

4906.69

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

72.04

-

492010.15

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

101.7

-

243921.35

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

11.53

-

3709.43

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

67.8

-

4906.69

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

65.66

-

448436.79

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

92.7

-

222335.39

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

10.51

-

3381.28

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

61.8

-

4472.47

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

72.04

-

492010.15

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

101.7

-

243921.35

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

11.53

-

3709.43

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

67.8

-

4906.69

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

51

-

348313.68

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

72

-

172687.68

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

8.16

-

2625.24

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

48

-

3473.76

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

38.25

-

261235.26

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

54

-

129515.76

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

6.12

-

1968.93

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

36

-

2605.32

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

51

-

348313.68

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

72

-

172687.68

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

8.16

-

2625.24

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

48

-

3473.76

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

38.25

-

261235.26

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

54

-

129515.76

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

6.12

-

1968.93

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

36

-

2605.32

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

75.86

-

518099.52

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

107.1

-

256872.92

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

12.14

-

3905.68

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

71.4

-

5167.22

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

38.25

-

261235.26

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

54

-

129515.76

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

6.12

-

1968.93

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

36

-

2605.32

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

72.04

-

492010.15

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

101.7

-

243921.35

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

11.53

-

3709.43

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

67.8

-

4906.69

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

77.78

-

531212.51

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

109.3

-

262149.49

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

12.44

-

4002.2

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

73.2

-

5297.48

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

72.04

-

492010.15

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

101.7

-

243921.35

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

11.53

-

3709.43

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

67.8

-

4906.69

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

59.93

-

409302.72

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

84.6

-

202908.02

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

9.59

-

3085.29

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

56.4

-

4081.67

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

38.89

-

265606.26

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

54.9

-

131674.36

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

6.22

-

2001.1

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

36.6

-

2648.74

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

77.78

-

531212.51

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

109.8

-

263348.71

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

12.44

-

4002.2

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

73.2

-

5297.48

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

59.93

-

409302.72

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

84.6

-

202908.02

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

9.59

-

3085.29

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

56.4

-

4081.67

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

65.66

-

448436.79

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

92.7

-

222335.39

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

10.51

-

3381.28

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

61.8

-

4472.47

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

38.25

-

261235.26

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

54

-

129515.76

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

6.12

-

1968.93

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

36

-

2605.32

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

80.96

-

552930.89

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

114.3

-

274141.69

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

12.95

-

4166.27

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

76.2

-

5514.59

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

47.81

-

326527

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

67.5

-

161894.7

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

7.65

-

2461.16

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

45

-

3256.65

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

78.41

-

535515.21

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

110.7

-

265507.31

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

12.55

-

4037.59

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

73.8

-

5340.91

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

38.25

-

261235.26

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

54

-

129515.76

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

6.12

-

1968.93

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

36

-

2605.32

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

80.96

-

552930.89

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

114.3

-

274141.69

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

12.95

-

4166.27

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

76.2

-

5514.59

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

53.55

-

365729.36

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

75.6

-

181322.06

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

8.57

-

2757.14

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

50.4

-

3647.45

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

44.63

-

304808.62

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

63

-

151101.72

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

7.14

-

2297.08

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

42

-

3039.54

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

38.25

-

261235.26

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

54

-

129515.76

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

6.12

-

1968.93

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

36

-

2605.32

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

59.93

-

409302.72

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

84.6

-

202908.02

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

9.59

-

3085.29

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

56.4

-

4081.67

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.2.2 M30(Grade), coarse and fine agregates conforming to IS:383 maximum size of coarse agregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approachs to bridge/culvert and construction joint, admixtures as approved, curing of concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD

65.66

-

448436.79

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

92.7

-

222335.39

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

10.51

-

3381.28

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

61.8

-

4472.47

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

59.93

-

409302.72

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

84.6

-

202908.02

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

9.59

-

3085.29

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

56.4

-

4081.67

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

51

-

348313.68

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

72

-

172687.68

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

8.16

-

2625.24

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

48

-

3473.76

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

74.59

-

509425.83

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

105.3

-

252555.73

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

11.93

-

3838.12

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

70.2

-

5080.37

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

74.59

-

509425.83

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

105.3

-

252555.73

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

11.93

-

3838.12

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

70.2

-

5080.37

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

65.66

-

448436.79

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

92.7

-

222335.39

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

10.51

-

3381.28

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

61.8

-

4472.47

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

65.66

-

448436.79

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

92.7

-

222335.39

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

10.51

-

3381.28

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

61.8

-

4472.47

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

59.93

-

409302.72

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

84.6

-

202908.02

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

9.59

-

3085.29

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

56.4

-

4081.67

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

31.88

-

217730.2

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

45

-

107929.8

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

5.1

-

1640.77

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

30

-

2171.1

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

82.24

-

561672.88

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

116.1

-

278458.88

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

13.16

-

4233.84

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

77.4

-

5601.44

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

59.93

-

409302.72

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

84.6

-

202908.02

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

9.59

-

3085.29

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

56.4

-

4081.67

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

56.74

-

387516.04

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

80.1

-

192115.04

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

9.08

-

2921.22

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

53.4

-

3864.56

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

47.81

-

326527

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

67.5

-

161894.7

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

7.65

-

2461.16

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

45

-

3256.65

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

35.06

-

239448.58

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

49.5

-

118722.78

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

5.61

-

1804.85

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

33

-

2388.21

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

72.04

-

492010.15

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

101.7

-

243921.35

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

11.53

-

3709.43

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

67.8

-

4906.69

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

59.93

-

409302.72

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

84.6

-

202908.02

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

9.59

-

3085.29

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

56.4

-

4081.67

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

47.81

-

326527

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

67.5

-

161894.7

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

7.65

-

2461.16

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

45

-

3256.65

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

72.04

-

492010.15

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

101.7

-

243921.35

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

11.53

-

3709.43

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

67.8

-

4906.69

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

59.93

-

409302.72

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

84.6

-

202908.02

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

9.59

-

3085.29

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

56.4

-

4081.67

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

51

-

348313.68

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

72

-

172687.68

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

8.16

-

2625.24

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

48

-

3473.76

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

38.25

-

261235.26

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

54

-

129515.76

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

6.12

-

1968.93

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

36

-

2605.32

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

72.04

-

492010.15

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

101.7

-

243921.35

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

11.53

-

3709.43

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

67.8

-

4906.69

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

47.81

-

326527

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

67.5

-

161894.7

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

7.65

-

2461.16

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

45

-

3256.65

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

59.93

-

409302.72

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

84.6

-

202908.02

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

9.59

-

3085.29

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

56.4

-

4081.67

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

35.06

-

239448.58

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

49.5

-

118722.78

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

5.61

-

1804.85

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

33

-

2388.21

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

59.93

-

409302.72

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

84.6

-

202908.02

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

9.59

-

3085.29

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

56.4

-

4081.67

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

59.93

-

409302.72

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

84.6

-

202908.02

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

9.59

-

3085.29

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

56.4

-

4081.67

... More
Construction works;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness asper design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to is : 383, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuos operation including provision o construction and expansion and construction joints, applying debonding strips, primer, sealant, dowel bars, admixtures as approved, curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing to lines and grade as per drawing and technical specification clause 1501 MORD including overhead charges & Contractors profit, But excluding GST & Seignarage charges.

29.33

-

200314.51

... More
Construction works;Providing, Laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with Vibratory roller of 80 to 100kn to achieve the desired density including lighting, barricading and maintenance of diversion, etc as directed by the Engineer-in-Charge and as per Technical Specification Clause 406 MoRT&H (5th revision ), including overhead charges & Contractor profit excluding Seignarage charges etc complete.

41.4

-

99295.42

... More
Construction works;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum, CBR> 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per Mort&H specification 305 (5th revision)

4.69

-

1508.87

... More
Construction works;Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., (Additional lead of 1km ) complete Excluding seignioarge charges for finished item of work as per Mort&H specification 301 (5th revision) and as directed by the Engineer-in-charge.

27.6

-

1997.41



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.