Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Opening Date28 Nov 2024
Closing Date7 Dec 2024
Tender Amount₹ 76,58,122 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building;Supplying and fixing of 4" (101.6mm) multi floor trap with jali - UPVC/SWR pipe fittings as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , overheads & contractors profit etc., complete for finished item of work.

18

194

3497

... More
Building;Supplying and fixing of SWR PVC pipes (Prince/ Sudhakar /Kisan/ Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)b)110mmdia

50

189

9484

... More
Building;Supplying and fixing of SWR PVC pipes (Prince/ Sudhakar /Kisan/ Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326)b)90mmdia

140

159

22260

... More
Building;Supply and Fixing of CPVC Pipes ( 34.90mm OD Pipe - SDR 13.5 )and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) of Ashirvad / Ajay Flowguard including cost and conveyance of all material, labour charges, and over heads but excuding VAT.

100

363

36357

... More
Building;Supply and Fixing of CPVC Pipes ( 22.20mm OD Pipe - SDR 13.5 )and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) of Ashirvad / Ajay Flowguard including cost and conveyance of all material, labour charges, and over heads but excuding VAT.

140

202

28312

... More
Building;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931

14

328

4600

... More
Building;Constructing 457.2mm x 457.2mm ( 1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm ( 1'-6" x 1'-6") C.I. frame and cover of 20Kg. including cost and conveyance of all materials to site, all labour charges, but excluding seignorage charges and VAT complete for finished item of work.

7

5237

36664

... More
Building;Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Esso or equivalent complete with standard CI brackets including wooden block ,1 No.12.70mm PVC connection with brass union nuts CP coated , 1 No.12.70mm NP bib tap 300 gms Seiko or equivalent including cost and conveyance of all materials to site, labour charges etc. complete for finished item of work

6

2783

16703

... More
Building;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2-2004 of white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with internal components and fixed using required size of nails and screws, 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931, 15mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.

10

6115

61152

... More
Building;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks

2000

11

22720

... More
Building;Supply and transportation of ......... LED Street light Body made of high grade pressure die ? cast Aluminium alloy with corrosion resistant powder coat, having protective toughened glass cover / temperature protective custom molded polycarbonate diffuser, Thermal shock and impact resistant IK07 fixed to the housing by SS screws Suitable lense on LEDs, Less Glare, IP 66 (Silicon gasket ensures Optical & Electrical compartments re IP 66) protected, wide operating voltage range, P.F > 0.90, System having efficacy >120 lumens / watt, with Ingress protection IP66, BIS approved Potted driver, Driver surge protection >10KV, D<15%, CCT: 3000- 6500K as desired by the department and as per IS, I>70, Inbuilt Electrical protections like Over voltage, short circuit, Over load, Open Circuit, Miswiring, etc complete with BIS certification with 5 years warranty. The contractor has to furnish the nufacturer warranty letter, LM 79 and LM 80 certificates.LUMINAIRE MAKE : ILIPS /SRAM / GE Venture / CROMPTON / BAJAJ / Surya / Wipro / Jaquar / Eveready / Halonix /Keselec / HAVELLS / POLYCAB / SURYA apart / Fortune Arrt / Goldwyn / Panasonic /Arraystorm / GM / ldmedal / Silicon /Orient / HPL / Valmont / TransrailMAKE : PHILIPS LUMILEDS / CREE / NICHIA/ OSRAM / SAMSUNG / LG LED

4

3317

13270

... More
Building;Supply and fixing TPN Distribution board with IP-20 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete.

6

7327

43962

... More
Building;Supply and fixing of Anchor / Gold Medal Olive / Million Zoom make ISI mark batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 40W bulb of Wipro / G.E. / Phillips / Crompton / Bajaj (for new installation ) including cost and conveyance of all material and labour charges but excluding VAT.

50

219

10998

... More
Building;Supply and transportation of 20W +/- 10%, >/ 2000 lumens, 1200mm length LEDretro tube light, housing made with glass body, wide operating voltage with Single / double side connection, PF=0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frostedcover CCT: 3000K - 6500K as desired by thedepartment and as per IS specifications,minimum CRI=80,.etc complete with 5 yearswarranty with BIS Certification.

50

602

30108

... More
Building;Supply and fixing of concealed box PVC/MS with hook for fan Supply and fixing PVC / MS galvanished Fan hook box with hook including all Labour charges etc., complete.

24

246

5906

... More
Building;Supply and fixing of 2 Module Modular type Electronic Fan Regulator make duly fixing on existing block including giving connections cost of all accessories and all labour charges etc., complete. GOLD MEDAL

10

682

6822

... More
Building;Supply, Transportation and Fixing of 1200mm (48") Sweep ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball bearings but without Regulator of makes Crompton / Bajaj Kassels 50 / Usha atom make with all standard accessories but without regulator including all labour charges etc., complete including cost and conveyance of all material and labour charges but excluding VAT.

10

3816

38170

... More
Building;Supply and run of 1 of 14 /0.3mm (1.5 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for Earth Continuity including all labour charges etc., complete.

400

37

14916

... More
Building;Supply and Run of 2 of 36/0.3mm (2.50 Sq.mm) FRLS / HFFR PVC insulated 1100V grade as perIS:694/1990 specification for Copper cable of makes KEI / Polycab / Havells / GM / Million / HPL / Gold Medal / Power Flex / RPG / Anchor / Great White Sun Cab / Fortune Art. with Run 1 of 14/0.3mm(1.0Sqmm) FRLS / HFFR PVC insulated 1100V grade as perIS:694/1990 specification for Copper cable of makes KEI / Polycab / Havells / GM / Million / HPL / Gold Medal / Power Flex / RPG / Anchor / Great White / Sun Cab / Fortune Art including cost and conveyance of all material and labour chages but excluding GST & other taxes.

400

102

41124

... More
Building;Supply and fixing of 6A 5 pin Modular plug socket with 6A Modular switch control on Box with earth continuity including wire leads, earth connections along with all labour charges etc., complete.

110

284

31286

... More
Building;Wiring with run of 2 of 14/0.3mm (1.0 Sq.mm) FR / FRLS PVC insulated flexible ISI mark copper cable ( 100V grade as perIS:694/1990 ) of KEI / Polycab / Havells / GM / Million / HPL / Gold Medal / Power Flex / RPG / Anchor / Great White / Sun Cab / Fortune Art make in existing pipe with 6A 1 Way flush type Swich of makes GM G Home / Gold Medal Olive / Million Zoom / Anchor Penta Cherry / Great white Omega, Ceiling rose 3 Plate of makes Anchor / Gold Medal Olive / Million Zoom. and Supply of Decolam Board of Size 8" x 10" as switch control box including cost and conveyance of all material and all labour charges but excluding other taxesetc., complete for light, bell, fan and exhaust fan points including cost and conveyance of all material and labour charges but excluding GST. Fand and Light points

300

851

255567

... More
Building;6 Modular Metal Box

28

304

8532

... More
Building;8 Modular Metal Box

32

361

11569

... More
Building;Cost,Supply and fixing of different sizes of Modular cover Frmaes including cost and conveyence of all materials and labour charges etc complete. 12 Modular Cover frame:

20

424

8480

... More
Building;6 Modular Metal Box

28

304

8532

... More
Building;8 Modular Metal Box

32

367

11750

... More
Building;Cost,Supply and fixing of different sizes of Modular Galvanised Metal Boxes including cost and conveyence of all materials and labour charges etc complete.12 Modular Cover frame:

20

424

8480

... More
Building;Supply and Fixing of 25mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.

500

80

40345

... More
Building;Fabric Providing, fabricating, assembling and erection of pre stressed Tensile Membrane Fabric structure in desired profile as per conceptual drawing Conical / Barrel Vault with MEHLER FR750 Mehatop F1 Type II of Mehler Make or Flexlight perform 702 S2 of Serge Ferrari Make having minimum Tensile strength WarporWeft 280/280 daN/5cm and minimum tear strength Warp or Weft of 30/28 daN and Adhesion 10daN/5cm.Multi composed PVDF of lacquer system on both sides UVprotected should be weldable without grinding having a minimum weight of 750 gm per sqm with a minimum 15 years warranty etc. over steel structure frames with all fittings and fixtures such as Galvanized MS End Plate Shackles Rigging Screws Turnbuckles swedge fork keder rods and galvanized MS strands with stainless steel end terminals complete as per Drawing or Detail and as per particular or technical specifications and as per the directions of Engineerincharge. Rate includes cost of fabric patterns forming cutting fabrication hot weld stitch of fabric Transport to the site assembling and installation with GI strands hardware EPDM gasket and required accessories wherever required complete including lifts up to all heights tools and plants and necessary scaffolding etc. required for all operations in all respect as per direction of EngineerInCharge Specially extruded aluminium profiles should be used for fabric fixing Work should be carried out in desired profile as per approved shop drawing including necessary designing software with ixCube 4 to 10 for Tensile Membrane design and cutting patterns and STAADPro advanced CONNECT Edition for steel support structure design using Limit state method as per IS 800 to 2007 seaming machine at least 2 nos capacity from 10 kv to 15kv including travelers seaming machine CNC plotter and cutter machine for cutting of membrane pattern swage end machine upto 30mm dia cables etc The tensile fabric roofing system shall have warranty for minimum 15 years as per manufacturer.

655

650

425750

... More
Building;Supply and fixing of Best teak Wood Door frame and double shutter of size 1.80 X 2.40mts including fixing of 6 Nos of M.S. Hold fasts, 6 Nos. of 150mm long Mild steel (PC) Butt Hinges, 2 Nos. of 200mm long Alluminium Tower Bolts, 2 Nos. of 150mm long M.S. Door Handles, 1No of 300mm long MS Aldrop and 1 No of Door Stopper including cost and conveyance of all materials and labour charges etc., complete.Door ( 1.80x2.40)Frame and shutters

1

71742

71742

... More
Building;Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete, including seigniorage charges, etc., complete for finished item of work. Ground Floor Ramp

12

4789

5747

... More
Building;Supply and fixing of WPC Door frame and shutter of size 0.75X 2.10mts including fixing of 6 Nos of M.S. Hold fasts, 6 Nos. of 125mm long Mild steel (PC) Butt Hinges, 2 Nos. of 200mm long Alluminium Tower Bolts, 2 Nos. of 150mm long Alluminium Door Handles, 1No of 300mm long Alluminium Aldrop and 1 No of Door Stopper including cost and conveyance of all materials and labour charges etc., complete.Door ( 0.75x2.10)Frame and shutters

8

9480

75843

... More
Building;Supplying & Fixing of Stainless steel Tubes sections, plates, sheet & Pipes of all sizes and diameter for 304 Grade FOR STAIRCASE RAILING. First Floor

75

791

59358

... More
Building;Supplying & Fixing of Stainless steel Tubes sections, plates, sheet & Pipes of all sizes and diameter for 304 Grade FOR STAIRCASE RAILING. Ground Floor

165

768

126801

... More
Building;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over red oxide primer Grade-I making three (3) coats in all to given and even shade after thourughly brushing the surface to remove all dirt and remains of loose powered materials, including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors Second Floor

3.24

1655

537

... More
Building;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over red oxide primer Grade-I making three (3) coats in all to given and even shade after thourughly brushing the surface to remove all dirt and remains of loose powered materials, including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors First Floor

53.93

1563

8432

... More
Building;Painting to New Iron work with two coats of ready mixed synthetic enamel paint first quality all shades over red oxide primer Grade-I making three (3) coats in all to given and even shade after thourughly brushing the surface to remove all dirt and remains of loose powered materials, including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors Ground Floor

53.93

1470

7933

... More
Building;Painting to New wood work with two coats of ready mixed first quality synthetic enamel paint of approved brand and shade over primary coat of wood primer grade I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors (APSS No. 1201 &1208) First Floor

23.45

3142

7368

... More
Building;Painting to New wood work with two coats of ready mixed first quality synthetic enamel paint of approved brand and shade over primary coat of wood primer grade I making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors (APSS No. 1201 &1208) Ground Floor

25.57

2982

7626

... More
Building;Painting to New Interior Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for INternal Walls.(APSS No. 911) NOTE :: Standard data revised vide Chief Engineer, R&B (Buildings) Procs.No.CEB/TA8/AEE3/SSR: 2010-11 Dt: 21.01.2011. Second Floor

62.75

2345

14720

... More
Building;Painting to New Interior Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for INternal Walls.(APSS No. 911) NOTE :: Standard data revised vide Chief Engineer, R&B (Buildings) Procs.No.CEB/TA8/AEE3/SSR: 2010-11 Dt: 21.01.2011. First Floor

1157.9

2211

256025

... More
Building;Painting to New Interior Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for INternal Walls.(APSS No. 911) NOTE :: Standard data revised vide Chief Engineer, R&B (Buildings) Procs.No.CEB/TA8/AEE3/SSR: 2010-11 Dt: 21.01.2011.Ground Floor

1166.17

2076

242147

... More
Building;Painting to New External Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911) NOTE :: Standard data revised vide Chief Engineer, R&B (Buildings) Procs.No.CEB/TA8/AEE3/SSR: 2010-11 Dt: 21.01.2011. for external walls . Second Floor

73.8

3404

25129

... More
Building;Painting to New External Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911) NOTE :: Standard data revised vide Chief Engineer, R&B (Buildings) Procs.No.CEB/TA8/AEE3/SSR: 2010-11 Dt: 21.01.2011. for external walls . First Floor

525.75

3196

168043

... More
Building;Painting to New External Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911) NOTE :: Standard data revised vide Chief Engineer, R&B (Buildings) Procs.No.CEB/TA8/AEE3/SSR: 2010-11 Dt: 21.01.2011. for external walls . Ground Floor

512.51

2987

153113

... More
Building;Providing and applying (Two coats ) of Wall Putty of white cement or polymer or cement based (Water Resistant) to interior faces of new walls and ceiling of approved colour as per manufacturers specification over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials ,applying emery paper , sand the surface, clean and wipe off loose dust, applying knifing paste filler by putty knife /muslin pad ,air dry for 2-3 hours ,sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to site and all operational ,incidental ,labour charges etc. complete for finished item of work including cost of overheads and contractors profit for finished item of work. Second Floor

62.75

3201

20089

... More
Building;Providing and applying (Two coats ) of Wall Putty of white cement or polymer or cement based (Water Resistant) to interior faces of new walls and ceiling of approved colour as per manufacturers specification over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials ,applying emery paper , sand the surface, clean and wipe off loose dust, applying knifing paste filler by putty knife /muslin pad ,air dry for 2-3 hours ,sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to site and all operational ,incidental ,labour charges etc. complete for finished item of work including cost of overheads and contractors profit for finished item of work. First Floor

1157.9

3074

355992

... More
Building;Providing and applying (Two coats ) of Wall Putty of white cement or polymer or cement based (Water Resistant) to interior faces of new walls and ceiling of approved colour as per manufacturers specification over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials ,applying emery paper , sand the surface, clean and wipe off loose dust, applying knifing paste filler by putty knife /muslin pad ,air dry for 2-3 hours ,sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to site and all operational ,incidental ,labour charges etc. complete for finished item of work including cost of overheads and contractors profit for finished item of work.Ground Floor

1166.17

2947

343734

... More
Building;Providing Skirting to internal walls to 15 cm height and risers of steps with soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish of make Jhonson & Jhonson, Kajaria, Nitco, Marbonite, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work. First Floor

26.18

11994

31402

... More
Building;Providing Skirting to internal walls to 15 cm height and risers of steps with soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish of make Jhonson & Jhonson, Kajaria, Nitco, Marbonite, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work,Ground Floor

25.37

11552

29308

... More
Building;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials. First Floor

38.44

6423

24692

... More
Building;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.Ground Floor

114.04

6314

72013

... More
Building;Dadooing to walls with white glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707) First Floor

126.92

6423

81526

... More
Building;Dadooing to walls with white glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707) Ground Floor

139.22

6314

87914

... More
Building;Flooring with soluble salt porcelain Vitrified Tiles screen printed and polished of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs of make Jhonson & Jhonson, Kajaria, Nitco, Marbonite, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, . First Floor

304.84

12084

368393

... More
Building;Flooring with soluble salt porcelain Vitrified Tiles screen printed and polished of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs of make Jhonson & Jhonson, Kajaria, Nitco, Marbonite, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, . Ground Floor

304.84

11642

354906

... More
Building;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904) SecondFloor

73.8

5872

43336

... More
Building;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904) First Floor

525.75

5405

284206

... More
Building;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904) Ground Floor

512.51

4843

248257

... More
Building;Plastering with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)Second Floor

49.79

6777

33745

... More
Building;Plastering with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)First Floor

967.19

6311

610408

... More
Building;Plastering with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)Ground Floor

978.55

5749

562605

... More
Building;Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) Second Floor

12.96

2754

3570

... More
Building;Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) First Floor

307.04

2635

80934

... More
Building;Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) Ground Floor

307.04

2517

77293

... More
Building;Providing Mild steel flats cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in All Floors. For Staircase Railing & Compound Wall etc . Second Floor

50

144

7203

... More
Building;Providing Mild steel flats cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in All Floors. For Staircase Railing & Compound Wall etc . First Floor

675

138

93639

... More
Building;Providing Mild steel flats cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in All Floors. For Staircase Railing & Compound Wall etc . Ground Floor

675

133

90034

... More
Building;Supplying and fixing of Unplasticized Poly VinylChloride (UPVC) 2 Track?2 Panel Sliding Doorsduly manufactured using UPVC reinforced profiles(Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 45 mm x 2.20 mm with reinforcement of 1.2 mm thickness, super sash with overall size of 39 mm x 75 mm x 2.20 mm with for sliding door shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.5 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. Door shall be provided with standard hardware & multi point locking system of bent handle espagulate .the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

102.46

6888

705794

... More
Building;Supplying and fixing of hermetically SealedIn sulated (IGU) Double Glazed Glass Unit (DGU) with 5 mm thick toughened Clear Glass both sides and hollow aluminium spacer bar frames where frame is bent at 90 degree angle and assembled with only one joint, called a bent frame filled with desiccant of appropriate grade molecular sieve desiccant of adsorption capacity by weight, 20-30% by weight, capacity to dry air down to an extremely low PPM level, <100 ppm (%RH) fixed to the glasses of specified thickness and quality with primary and secondary sealants of Poly ISO Butylene, or Butyl, primary sealant and Silicone and Polysulfide secondary sealants, to help fixing the IGU at the time of assembly and protect the gas filled spaces from moisture vapor penetration, chemical attack from cleaning fluids and glazing products, and liquid water penetration due to rain or condensation complete for Type I - Dry Air Insulated - Regular IGU

10.26

3710

38071

... More
Building;Supply and fixing of flush door shutter only of size 0.90 X 2.10mts including fixing of 6 Nos of M.S. Hold fasts, 6 Nos. of 125mm long Mild steel (PC) Butt Hinges, 2 Nos. of 200mm long Alluminium Tower Bolts, 2 Nos. of 150mm long Alluminium Door Handles, 1No of 300mm long Alluminium Aldrop and 1 No of Door Stopper including cost and conveyance of all materials and labour charges etc., complete.

6

4859

29156

... More
Building;Supply and fixing of flush door shutter only of size 1.05 X 2.10mts including fixing of 6 Nos of M.S. Hold fasts, 6 Nos. of 125mm long Mild steel (PC) Butt Hinges, 2 Nos. of 200mm long Alluminium Tower Bolts, 2 Nos. of 150mm long Alluminium Door Handles, 1No of 300mm long Alluminium Aldrop and 1 No of Door Stopper including cost and conveyance of all materials and labour charges etc., complete.

20

5560

111210

... More
Building;Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using 2nd class bricks having a crushing strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and seignorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges. First Floor

28.15

11736

33040

... More
Building;Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using 2nd class bricks having a crushing strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and seignorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges. Ground Floor

28.15

9907

27889

... More
Building;Brick Masonry in superstructure with CM (1:6) prop: using II class bricks including Cost and Conveyance of all materials like cement, sand, bricks, water etc., to site, including materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. First Floor

9.66

10234

98870

... More
Building;Brick Masonry in superstructure with CM (1:6) prop: using II class bricks including Cost and Conveyance of all materials like cement, sand, bricks, water etc., to site, including materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. Ground Floor

16.79

8810

147929

... More
Building;Plain Cement Concrete corresponding to M 5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)

6.27

5847

36664

... More
Building;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and other taxes etc., complete, for Ordinary Soil-Manual Means-Upto 3 m depth.

12.55

285

3581



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.