Panchayat Raj Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
518142Tender No
HD/Tender/27/2024-25, Dt: 06.06.2024 (1st Call) of SEPR MedakTender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
HLB Construction and Maintenance;Providing & fixing of Typical PMGSY Title informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges,But excluding GST
2
12911
25823
... More
HLB Construction and Maintenance;Construction of RCC guide posts of 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
20
716
14335
... More
HLB Construction and Maintenance;Providing and laying Bituminous concrete with 100- 120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 % per cent of mix and filler, transporting the hot mix to work site, laying with a Mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects, including overhead charges & Contractors profit. but excluding Seig Charges, Labour Cess & GST etc,. Complete.
15.19
11047
167777
... More
HLB Construction and Maintenance;Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc,. Complete. for Tack Coat
506.25
14
7442
... More
HLB Construction and Maintenance;Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD ,including contractors profit & Over head charges, but excluding GST etc,. Complete. for Prime Coat
506.25
73
37452
... More
HLB Construction and Maintenance;Construction of improved subgrade/ Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement with as per Technical Specification Clause 303 & 407 MORD , by using machinery including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.
75.94
362
27500
... More
HLB Construction and Maintenance;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
75.94
3431
260568
... More
HLB Construction and Maintenance;Construction of granular sub-base by providing well graded material(Table 400.1.A) with Grading III Material(HBG M/C chips) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotaor at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401.2.1 MORD including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.
75.94
2706
205511
... More
HLB Construction and Maintenance;Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
1748.44
240
420412
... More
HLB Construction and Maintenance;Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST etc,. Complete. .
280.5
2
698
... More
HLB Construction and Maintenance;Rountine maintanance for 5 th year
1
26407
26407
... More
HLB Construction and Maintenance;Rountine maintanance for 4 th year
1
86026
86026
... More
HLB Construction and Maintenance;Rountine maintanance for 3 rd year
1
21429
21429
... More
HLB Construction and Maintenance;Rountine maintanance for 2 nd year
1
74123
74123
... More
HLB Construction and Maintenance;Rountine maintanance for 1 st year
1
9613
9613
... More
HLB Construction and Maintenance;Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 MORD including cost and conveyance of all materials and all labour charges etc., complete including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
3.12
2381
7430
... More
HLB Construction and Maintenance;Gravel Backing for Revetments as per APSS including cost and conveyance of all materials and all labour charges etc., complete including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.
8.48
1000
8482
... More
HLB Construction and Maintenance;Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
60.32
3373
203486
... More
HLB Construction and Maintenance;Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
237.3
991
235304
... More
HLB Construction and Maintenance;Vibrated reinforced Cement Concrete M 30 grade Approach slab using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1211 MORD ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.
19.74
7560
149248
... More
HLB Construction and Maintenance;P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) mechanically mixed leveling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 MORD,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
9.87
6194
61145
... More
HLB Construction and Maintenance;Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure complete as per drawing and technical specifications Clauses 1000 MORD , for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Super Structures
1.78
76404
135750
... More
HLB Construction and Maintenance;Providing drainage spouts made 0.15 sqm of 6 mm thick MS plate 210 x 210 mm water spout at top with 100 mm dia GI drain spout and 5 Nos MS plate 12 mm x 40 mm x 210 mm long inluding cost of all materials and labour charges and contractors profit & Over head charges, but excluding GST etc,. Complete.
12
1466
17600
... More
HLB Construction and Maintenance;Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701MORD. including contractors profit & Over head charges, but excluding GST etc,. Complete.
360.58
151
54782
... More
HLB Construction and Maintenance;Providing and laying Vibrated reinforced cement concrete M20 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. for guide posts
9.42
7099
66915
... More
HLB Construction and Maintenance;Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 6Kgs/Sq.cm pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD including contractors profit & Over head charges, but excluding GST etc,. Complete.
168
358
60245
... More
HLB Construction and Maintenance;Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For Protection Work
149.09
2585
385496
... More
HLB Construction and Maintenance;Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.
56.31
705
39719
... More
HLB Construction and Maintenance;Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 MORD ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
39.13
1055
41311
... More
HLB Construction and Maintenance;Providing and laying Vibrated cement concrete Wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.
29.35
7728
226848
... More
HLB Construction and Maintenance;Providing and laying Vibrated reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD , ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete. 5 to 10m height. - For Super Structure (Deck slab)
182.58
9045
1651518
... More
HLB Construction and Maintenance;Providing and laying Vibrated reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. (upto 5m height) - For piers, side walls, bed blocks
13.35
7985
106577
... More
HLB Construction and Maintenance;Providing and laying Vibrated reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. (-) - For foundation of Abutments & piers
296.09
7532
2230115
... More
HLB Construction and Maintenance;Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure complete as per drawing and technical specifications Clauses 1000 MORD, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Super Structures
17.81
76404
1360993
... More
HLB Construction and Maintenance;Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure complete as per drawings and technical specification Clauses 1000 MORD for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Sub Structures
2.94
74573
219301
... More
HLB Construction and Maintenance;Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation complete as per drawings and technical specifications Clauses 1000 MORD for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Foundation
22.34
74304
1660225
... More
HLB Construction and Maintenance;Providing and laying Vibrated cement concrete M 20 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
301.27
7371
2220931
... More
HLB Construction and Maintenance;Providing and laying Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 803, 1202 and 1203 MORD ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
191.68
6442
1234894
... More
HLB Construction and Maintenance;Providing and laying plain cement concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in Foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete..For levelling course
94.18
6419
604571
... More
HLB Construction and Maintenance;Earthwork excavation for structures as per drawing and technical specifications Clause including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification MoRT&H specification 304(5th Revision) ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations-Up to 3 m depth Ordinary soil below water Level
1984.85
127
253604
... More
HLB Construction and Maintenance;Earthwork excavation for structures as per drawing and technical specifications Clause including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification MoRT&H specification 304(5th Revision) ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations-Upto 3 m depth above water Level
307.5
121
37419
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements