Panchayat Raj Engineering Department Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Building Construction
Opening Date14 Feb 2025
Closing Date21 Feb 2025
Tender Amount₹ 14,21,454 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and on all materials including all operational, incidental and labour charges such as machine mixing, centering, shuttering laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including overhead charges & Contractors profit etc but excluding GST, Seigniorage charges complete.for finished item of work For plinth Beams

3.7

12777

47277.16

... More
Building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and on all materials including all operational, incidental and labour charges such as machine mixing, centering, shuttering laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including overhead charges & Contractors profit etc but excluding GST, Seigniorage charges complete.for finished item of work For Columns

1.94

13432

26059.71

... More
Building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and on all materials including all operational, incidental and labour charges such as machine mixing, centering, shuttering laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including overhead charges & Contractors profit etc but excluding GST, Seigniorage charges complete.for finished item of work For Pedastals

2.1

10272

21572.04

... More
Building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and on all materials including all operational, incidental and labour charges such as machine mixing, centering, shuttering laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, including overhead charges & Contractors profit etc but excluding GST, Seigniorage charges complete.for finished item of work For Footings

3.73

9532

35557.19

... More
Building;Plain Cement Concrete corresponding to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and flooring bed(APSS No 402)

5.94

4708

27969.44

... More
Building;Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges such as shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labour charges etc., complete for finished item of work including seignerage charges excluding dewatering charges etc., complete for Foundation of Building.(APSS No. 308)

24.29

463

11263.27

... More
Building;Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal connections and labour charges for surface / flush mounting etc., complete. including overhead charges & Contractors profit etc but excluding GST complete.for finished item of work

1

5434

5434.21

... More
Building;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 40W bulb (for new installation). including overhead charges & Contractors profit etc but excluding GST complete.for finished item of work

6

251

1506.54

... More
Building;Supply, Transportation and Fixing of 1200mm (48") Sweep ISI mark Ceiling Fan as per IS 374 - 1979 and, with double ball bearings but without Regulator of makes Crompton / Bajaj Kassels 50 / Usha atom make with all standard accessories but without regulator including all labour charges etc., complete including cost and conveyance of all material and labour charges but excluding GST

6

3797

22785.12

... More
Building;Supply and transportation of 22W 2300 lumens, 1200mm length LED tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 50000 Burning hours with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix / HPL / Eveready / Surya / Keselec / Arraystorm / GM/ Goldmedal / Goldwyn / Fortune Arrt / Lighting Technologies. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG

8

698

5589.84

... More
Building;Supply and Fixing of 16A 3pin and 6A 3pin plug socket with indicator lamp and 16A fuse unit and 16A switch control (5 in 1) duly recessed in wall with wooden deep box of 6" x8" x2 1/2" size covered with hylam sheet including earth connections and all labour charges etc., complete. including overhead charges & Contractors profit etc but excluding GST complete.for finished item of work

4

512

2051.64

... More
Building;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.(Anchor, Sudhakar, Gold stone, and Poly cab, Gloster)

80

145

11663.2

... More
Building;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm)FINOLEX brand Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings including overhead charges & Contractors profit etc but excluding GST complete.for finished item of work

22

687

15118.18

... More
Building;Supply and Fixing of 20mm dia 1.50 mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles and decolam board for switches for Light, Fan and separate plug point including all labour charges etc., complete as per 1.3.1 of Sta revised data of BLD -ELEC-1-3

50

131

6579.5

... More
Building;Supplying and fixing of Iron Welded Window with Mesh including cost and conveyance of all materials and labour charges etc., complete. including overhead charges & Contractors profit etc but excluding GST charges complete.for finished item of work

180

131

23682.6

... More
Building;Painting to Old wood work with two coats of ready mixed synthetic enamel paint first quality all shades over a base coat of wood primer making three coats in all to give an even shade after thoroughly brushing the surface to remove all remains of loose powdered materials, including c/c of all materials, site and other taxes, all operationa, incidental and labour charges etc., complete for finished item of work in all flooring for external walls. (APSS No.1201,1207 &1212). including overhead charges & Contractors profit etc but excluding GST, Seigniorage charges complete.for finished item of work

45.26

148

6729.71

... More
Building;Flooring with double charged / multi charged multi charges stain free full body porcelain virtified tiles with double layer pigment of size 600 x 600mm and of 1st quality (598x598x8mm) thick regular finish with normal colurs) set over base coat of cement mortor (1:8) 12mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @3.3kgs per sqm & jointed neatly with white cement pate to full deapth mixed pigment of matching shade including cost of all materials like cement fine (Sand(Screened) water and tiles etc., complete, including OH&CP but excluding GST& Seigniorage charges etc., complete for finished item of work, but excluding the cost of conveyance of all materials (APSS No. 701 & 707)

108.19

1118

121045.14

... More
Building;Supplying and fixing of 24/26 mm thick Wood Plastic Composite (WPC) Door shutter, comprising of 70% virgin polymer, 15% wood powder (fiber), and the remaining 15% additives, comprising of virgin PVC polymer of K value 58-60 (Suspension grade), Calcium carbonate and natural fibers (wood powder) and non toxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws all as per direction of Engineer - in- charge

4.8

2281

10950.67

... More
Building;Providing and fixing factory made solid wood polymer composite (WPC) single extruded Door frame section of 100*65 mm with encapulation of 6mm rigid layer on all external surfaces the door frame will have a rebate of 32mm/37mm the two vertical members are to be joined together with the horizontal member using 8x75 mm long MS star full thread screws to be used with reverse forward speed control hand drilling machine the ready/assembled door frame is fixed wall using Z hadn fast 300mm long hold fast. Size 1.20 x 2.00mm

12.8

882

11299.71

... More
Building;Roofing with 0.47mm thickness, Coating: Alu-Zinc coating AZ150 GSM. Tensile Strength: 550 MPA. Paint coating: Regular Modified Polyester painting. Painting Thickness (Top): 18 to 20 Microns, (Bottom): 5 to 7 Microns. Sheet Width: 1.020, Length: Maximum 12 Meters with Regular Range Colour fixed with G.I ?J? bolts & nuts 8 mm dia with bitumen & G.I limpet washers filled with white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (upto a pitch of 600) including overhead charges & Contractors profit etc but excluding GST charges complete.for finished item of work

130.2

956

124554.53

... More
Building;Supplying and fixing of M.S. tubes for trusses & purlins including fabrication cost of fixing, labour charges etc., complete including overhead charges & Contractors profit etc but excluding GST charges complete.for finished item of work

1000

189

189850

... More
Building;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, finishing, including cutting of Grooves wherever necessary as directed by Engineer in charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904)

635.25

532

338512.02



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.