Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Bridge Construction
Opening Date21 Feb 2024
Closing Date29 Feb 2024
Tender Amount₹ 6,14,07,433 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bridge Work;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum , CBR = 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th revision)

450

288

129807

... More
Bridge Work;Forming Embankment with material obtained from borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 305 (5th revision). (The soil CBR>10%, PI<18% & MDD>1.8 g/cc)

14141.63

206

2926327

... More
Bridge Work;Providing HYSD bars (Fe-500) from primary producers like TATA, SAIL, VSP, JSW and Shyam steel etc. of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.

136.41

66962

9134311

... More
Bridge Work;Providing HYSD bars (Fe-500) from primary producers like TATA, SAIL, VSP, JSW and Shyam steel etc. of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 (5th revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.

40.5

66689

2700934

... More
Bridge Work;Vibrated reinforced cement concrete M25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% rock sand including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1700, & 2100 (5th Revision) and as directed by the Engineer-in-Charge for Sub structure.

1818.75

6622

12044545

... More
Bridge Work;Vibrated reinforced cement concrete M25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% rock sand including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1700, & 2100 (5th Revision) and as directed by the Engineer-in-Charge for foundation.

540

6246

3372926

... More
Bridge Work;PCC (1:3:6) mix using 40mm size HBG Machine crushed stone aggregate and fine aggregate using 50% of natural sand and 50% of rock sand conforming to table 1000-2 of MoRT&H including cost and conveyance of all materials to site and labour charges for centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P (excluding Seignorage charges) etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th Revision) and as directed by the Engineer-in-Charge for foundations for levelling course below the pile cap.

84

4694

394320

... More
Bridge Work;Retaining wall and :-Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.

1008

122

123883

... More
Bridge Work;Construction of railing of M25 Grade in-situ- with 12 mm nominal size aggregate true to line abd grade, tolerance, of Vertical RCC posts/Railing not to exceed 1 in 500 , including C/C of all materials , labour charges, formwork etc. complete as per approved drawings, and MoRT&H Technical specifications Nos. 2703, 1500, 1600 & 1700, but excluding cost of steel and it's fabrication charges (Design approved by the CE , R&B dept. , Hyderabad)

279.2

618

172632

... More
Bridge Work;Supply and fixing of Drainage Spouts complete as per drawing and Technical specification No. 2705. (As per Data communicated vide Circular Memo No. D&P/Bridge work estimates / Non SSR Items/rates / 2009-1 Dt 13-08-09 of the Chief Engineer (R&B), Designs & Planning wing,) Hyderabad.

280

3741

1047721

... More
Bridge Work;Providing weep holes in Brick Masonry/Plain/Reinforced concrete Abutments, Return walls and wing walls with 100mm Diameter AC pipe extending through the full width of the structure with a slope of about 1V : 20H towards drawing face etc., complete as per drawing and Technical specification- MoRT&H specification 2706 & 2200 (5th Revision) ( As per Data communicated vide Circular Memo No. D&P/Bridge work estimates/Non SSR Items/rates/2009-1 Dt 13-08-09 of the Chief Engineer (P&B), Designs & Planning wing,) Hyderabad.

24

732

17590

... More
Bridge Work;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to athickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal seignorage charges ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.4 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.

57.67

1827

105409

... More
Bridge Work;Back filling behind Abutments with carted gravel including cost and conveyance and of all materials to site (Excluding seignorage charges) etc., complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work

336.42

767

258169

... More
Bridge Work;Providing HYSD bars (Fe-500) from primary producers like TATA, SAIL, VSP, JSW and Shyam steel etc. of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.

101.7

79689

8104694

... More
Bridge Work;Providing HYSD bars (Fe-500) from primary producers like TATA, SAIL, VSP, JSW and Shyam steel etc. of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.

22.94

77548

1778725

... More
Bridge Work;Providing HYSD bars (Fe-500) from primary producers like TATA, SAIL, VSP, JSW and Shyam steel etc. of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 (5th revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.

23.5

77232

1814970

... More
Bridge Work;Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% Rock sand, including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, 2702 (5th Revision) and as directed by the Engineer-in-Charge for wearing coat over Deck slab.

83.66

7045

589396

... More
Bridge Work;Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% Rock sand, including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1700, & 2100 (5th Revision) and as directed by the Engineer-in-Charge for Approach slab.

19.27

7135

137478

... More
Bridge Work;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% Rock sand, including cost, and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for Levelling course below approach slab.

9.34

5974

55818

... More
Bridge Work;Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% Rock sand, including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 (5th revision ) and as directed by the Engineer-in-Charge. For Super structure - for Deck Slab/ Girders/ Kerbs

619.43

8679

5376446

... More
Bridge Work;Vibrated cement concrete M30 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% Rock sand, including cost, and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure

257.02

7695

1977887

... More
Bridge Work;Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% rock sand including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1700, & 2100 (5th Revision) and as directed by the Engineer-in-Charge for foundation.

307.68

7240

2227819

... More
Bridge Work;PCC (1:3:6) mix using 40mm size HBG Machine crushed stone aggregate and fine aggregate using 50% of natural sand and 50% of rock sand conforming to table 1000-2 of MoRT&H including cost and conveyance of all materials to site and labour charges for centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P (excluding Seignorage charges) etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th Revision) and as directed by the Engineer-in-Charge for foundations for levelling course below the pile cap.

9.9

5436

53804

... More
Bridge Work;Earthwork excavation Hard rock(Blasting prohibited) by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.

83.38

1059

88297

... More
Bridge Work;Bridge Portion:-Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.

81.9

142

11656



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.