Panchayat Raj Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Panchayat Raj Engineering Department Tender
Civil And Construction
Bridge Construction
Opening Date21 Feb 2024
Closing Date29 Feb 2024
Tender Amount₹ 6,14,07,433
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
500835Tender No
NIT No.1753/2023-24, dt.12.02.2024 of Regional Officer PR Mahabubnagar (1 st Call)Tender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Bridge Work;Construction of earthen shoulders with selective soils obtained from borrow pits with MDD of 18 KN/Cum , CBR = 12%, PI < 12% from approved sources, grading and consoilidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of MoRT&H, including all hire and operational charges of T&P complete for finished item of work as per MoRT&H specification 305 (5th revision)
450
288
129807
Bridge Work;Forming Embankment with material obtained from borrowed useful earth from outside road boundary by mechanical means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of T&P, complete for finished item of work as per MoRT&H specification 305 (5th revision). (The soil CBR>10%, PI<18% & MDD>1.8 g/cc)
14141.63
206
2926327
Bridge Work;Providing HYSD bars (Fe-500) from primary producers like TATA, SAIL, VSP, JSW and Shyam steel etc. of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.
136.41
66962
9134311
Bridge Work;Providing HYSD bars (Fe-500) from primary producers like TATA, SAIL, VSP, JSW and Shyam steel etc. of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 (5th revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.
40.5
66689
2700934
Bridge Work;Vibrated reinforced cement concrete M25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% rock sand including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1700, & 2100 (5th Revision) and as directed by the Engineer-in-Charge for Sub structure.
1818.75
6622
12044545
Bridge Work;Vibrated reinforced cement concrete M25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% rock sand including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1700, & 2100 (5th Revision) and as directed by the Engineer-in-Charge for foundation.
540
6246
3372926
Bridge Work;PCC (1:3:6) mix using 40mm size HBG Machine crushed stone aggregate and fine aggregate using 50% of natural sand and 50% of rock sand conforming to table 1000-2 of MoRT&H including cost and conveyance of all materials to site and labour charges for centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P (excluding Seignorage charges) etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th Revision) and as directed by the Engineer-in-Charge for foundations for levelling course below the pile cap.
84
4694
394320
Bridge Work;Retaining wall and :-Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.
1008
122
123883
Bridge Work;Construction of railing of M25 Grade in-situ- with 12 mm nominal size aggregate true to line abd grade, tolerance, of Vertical RCC posts/Railing not to exceed 1 in 500 , including C/C of all materials , labour charges, formwork etc. complete as per approved drawings, and MoRT&H Technical specifications Nos. 2703, 1500, 1600 & 1700, but excluding cost of steel and it's fabrication charges (Design approved by the CE , R&B dept. , Hyderabad)
279.2
618
172632
Bridge Work;Supply and fixing of Drainage Spouts complete as per drawing and Technical specification No. 2705. (As per Data communicated vide Circular Memo No. D&P/Bridge work estimates / Non SSR Items/rates / 2009-1 Dt 13-08-09 of the Chief Engineer (R&B), Designs & Planning wing,) Hyderabad.
280
3741
1047721
Bridge Work;Providing weep holes in Brick Masonry/Plain/Reinforced concrete Abutments, Return walls and wing walls with 100mm Diameter AC pipe extending through the full width of the structure with a slope of about 1V : 20H towards drawing face etc., complete as per drawing and Technical specification- MoRT&H specification 2706 & 2200 (5th Revision) ( As per Data communicated vide Circular Memo No. D&P/Bridge work estimates/Non SSR Items/rates/2009-1 Dt 13-08-09 of the Chief Engineer (P&B), Designs & Planning wing,) Hyderabad.
24
732
17590
Bridge Work;Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to athickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveyance of all metal seignorage charges ,and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.4 of IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.
57.67
1827
105409
Bridge Work;Back filling behind Abutments with carted gravel including cost and conveyance and of all materials to site (Excluding seignorage charges) etc., complete as per Clause 710.1.4 of IRC : 78 and as per MoRT&H Specification No. 2200 (5th Revision) and as per Drawing and technical specifications for finished item of work
336.42
767
258169
Bridge Work;Providing HYSD bars (Fe-500) from primary producers like TATA, SAIL, VSP, JSW and Shyam steel etc. of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 (5th revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.
101.7
79689
8104694
Bridge Work;Providing HYSD bars (Fe-500) from primary producers like TATA, SAIL, VSP, JSW and Shyam steel etc. of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.
22.94
77548
1778725
Bridge Work;Providing HYSD bars (Fe-500) from primary producers like TATA, SAIL, VSP, JSW and Shyam steel etc. of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 (5th revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.
23.5
77232
1814970
Bridge Work;Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% Rock sand, including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing but excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, 2702 (5th Revision) and as directed by the Engineer-in-Charge for wearing coat over Deck slab.
83.66
7045
589396
Bridge Work;Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% Rock sand, including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1700, & 2100 (5th Revision) and as directed by the Engineer-in-Charge for Approach slab.
19.27
7135
137478
Bridge Work;Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% Rock sand, including cost, and conveyance of all materials to site and all labour charges for machine mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th Revision) for Levelling course below approach slab.
9.34
5974
55818
Bridge Work;Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% Rock sand, including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approved drawings and as directed during execution but excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 (5th revision ) and as directed by the Engineer-in-Charge. For Super structure - for Deck Slab/ Girders/ Kerbs
619.43
8679
5376446
Bridge Work;Vibrated cement concrete M30 Grade Concrete using 40mm , 20mm and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% Rock sand, including cost, and conveyance of all materials to site and all labour charges for machine mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all other operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th Revision) for Sub structure
257.02
7695
1977887
Bridge Work;Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) using 50% river sand + 50% rock sand including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per Approved drawing, excluding cost of steel and its fabrication charges as per MoRT&H specification 1500, 1700, & 2100 (5th Revision) and as directed by the Engineer-in-Charge for foundation.
307.68
7240
2227819
Bridge Work;PCC (1:3:6) mix using 40mm size HBG Machine crushed stone aggregate and fine aggregate using 50% of natural sand and 50% of rock sand conforming to table 1000-2 of MoRT&H including cost and conveyance of all materials to site and labour charges for centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P (excluding Seignorage charges) etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (4th Revision) and as directed by the Engineer-in-Charge for foundations for levelling course below the pile cap.
9.9
5436
53804
Bridge Work;Earthwork excavation Hard rock(Blasting prohibited) by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.
83.38
1059
88297
Bridge Work;Bridge Portion:-Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per drawing and technical specification including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to the extent required etc., complete excluding seignioarge charges for finished item of work as per MoRT&H specification 304(5th Revision) and as directed by the Engineer-in-Charge.
81.9
142
11656