Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Building Construction
Opening Date19 Feb 2024
Closing Date27 Feb 2024
Tender Amount₹ 20,44,341 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Building;Supply, Transportation and Installation of Supply and Transportation of 1.00 HP 10 Stage single phase ISI submersible motor pumpset suitable for 4" Bore well. Makes: Flowell / Waterman / Ellen / Kirlosker / Samudra (ELEC-5.5.2(b))

1

20374

20374

... More
Building;Inserting 180mm dia 6kg/sqcm PVC Pipe for casing including all charges etc complete. Plain Casing Pipe.

15

674

10110

... More
Building;Drilling of 6½" dia Bore Well in with power rig drilling in all types of soils and such as loose soils and hard rock formation including inserting of Casing pipe etc., complete. (Provisional Rate)

60

700

42000

... More
Building;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight screw type (full turn) with internal / external threaded connection conforming to IS 8931

2

307

615.8

... More
Building;Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. Including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping.

6

1041

6251.1

... More
Building;Providing & placing on Terrace polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and overflow pipes but without fittings & base support for tanks.( From SSR rates sno 311) 2000lts

1000

11

11360

... More
Building;Constructing 457.2mm x 457.2mm ( 1ft-6" x 1ft-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3ft-0") and fitted with light weight 457.2mm x 457.2mm ( 1ft-6" x 1ft-6") C.I. frame and cover of 20Kg. including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work. a] Depth up to 1.50 mtr

1

5237

5237.65

... More
Building;Supply and fixing of Ashirvad / Ajay / Astral Flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper tubes of size 1/2" ton 2" Ashirvad Flowguard) and SDR 11 pipes are made from idential CPVC compounds having the same physical properties for Hot and cold water (IS 15778:2007) including labour charges for fixing of CPVC / PPR Pipes etc., complete for (22.20mm OD Pipes - SDR 11)

24

348

8371.2

... More
Building;Supply and fixing of Ashirvad / Ajay / Astral Flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper tubes of size 1/2" ton 2" Ashirvad Flowguard) and SDR 11 pipes are made from idential CPVC compounds having the same physical properties for Hot and cold water (IS 15778:2007) including labour charges for fixing of CPVC / PPR Pipes etc., complete for (28.60mm OD Pipes - SDR 11)

24

395

9489.12

... More
Building;Supplying and Fixing Pedestal for Wash Hand Basin including labour charges only for fixing pedestal for wash hand basin etc., complete.

1

2021

2021.21

... More
Building;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 450 x 300 mm - Single C.P. Pillar cock

1

2306

2306.38

... More
Building;Supplying & Fixing of Indian Pattern White Glazed 1st Quality of ISI Orissa Pan with "P" or "S" trap Hindware / Parryware / Neycer - ISI Mark 630x450 mm including cost and conveyance of all materials and labour charges etc., complete

1

3067

3067.61

... More
Building;Supply and fixing of 1200mm Sweep Ceiling fan controlled by one switch &Electronic Regulator of 300 Watts step type and Concealed PVC fan hook box etc complete as required.

4

3734

14937.28

... More
Building;Supply and Fixing of Batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 40W bulb (for new installation)

4

114

457.88

... More
Building;Supply and Fixing and transportation of 20W, 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per ISspecifications, minimum CRI=80,.etc complete with 50,000 burning hours with BIs Certification. LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.

6

636

3817.44

... More
Building;Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia B class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

1

5145

5145.41

... More
Building;Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circuit Braker (ELCB) / Residual Current Circuit Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out ging including internal connections and labour charges for surface / flush mounting etc., complete.

1

4816

4816.71

... More
Building;Supply and Run of 2 of 36/0.3mm (2.50 Sq.mm) FRLS PVC insulated 1100V grade as perIS:694/1990 specification for Copper cable of makes Ploycab / Havells / Sun Cab / Gold Medal / Million /Fortune Art / Paragon / HPL / L&T / Power Flex / RPG /Anchor / Bonton. with Run 1 of 14/0.3mm(1.5 Sqmm) FRLS PVC insulated 1100Vgrade as perIS:694/1990 specification for Copper cable of makes Ploycab / Havells / Sun Cab / Gold Medal / Million /Fortune Art / Paragon / HPL / L&T / Power Flex / RPG /Anchor / Bonton make including cost and conveyance of all material and labour chages but excluding GST.

60

144

8689.8

... More
Building;Supply and fixing of 6A ISI mark Flush type switch of makes Anchor / Gold Medal Olive / Million Zoom with 6A 3/2 pin wall plug socket of Anchor / Gold Medal Olive / Million Zoom make on a common switch board with earth connections in surface / consealed wiring including cost and conveyance of all materialsa and labour charges but excluding GST.

8

156

1249.12

... More
Building;Wiring with run of 2 of 14/0.3mm (1.5 Sq.mm) FR / FRLS PVC insulated flexible ISI mark copper cable of GM / L&T / RPG / Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard / Milion / Vimal / Sun cab / Paragaon / Fortune Art make in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including cost and conveyance of all material and all labour charges but excluding GST etc., complete for light, bell, fan and exhaust fan points including cost and conveyance of all material and labour charges but excluding GST.

25

785

19646

... More
Building;Supply and laying of 25mm dia 1.8mm thick P.V.C.pipe ISI mark of Sudhakar / Maco Plast / Modi make concealed in wall with PVC / Metallic junction boxes and all required accessories including masonary work for light, fan and separate plug point with supply and fixing of suitable size Metallic deep box including all labour charges etc., complete including masonary work, including cost and conveyance of all material, all labour charges, and contractor profit etc., complete but excluding GST.

45

115

5202.45

... More
Building;Supply and Laying of 25mm outer dia heavy (2.20mm thickness) grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar / Maco Plast / Modi. make concealed in Roof Slabs with all required PVC / Metallic Deep Boxes including masonary work and labour charges etc., complete including masonary work, including cost and conveyance of all material, all labour charges, and contractor profit etc., complete but excluding GST.

45

95

4303.8

... More
Building;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding GST and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

3300

84

277266

... More
Building;Painting to Wood work with two coats of ready mixed synthetic enamel paint first quality all shades over a base coat of wood primer making three coats in all to give an even shade after thoroughly brushing the surface to remove all remains of loose powdered materials, including c/c of all materials, site and other taxes, all operational, incidental and labour charges etc., complete for finished item of work in all flooring for external walls. (APSS No.1201,1207 &1212).

29.76

204

6085.32

... More
Building;White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including over heads & contractor profitcost and conveyance of all materials, and labour charges, incidental such as scaffolding, lift charges but excluding GST etc., complete for finished item of work.

493.79

44

22072.41

... More
Building;Providing dadooing to walls with 5 to 7mm thick ceramic wall tiles 1st quality of 7.30mm and of size approved by Engineer-in-Charge, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including over heads & contractor profit, cost of all materials like tiles, cement, sand and water etc., complete including complete for finished item of work, but excluding GST and seignorage charges.

10.84

895

9706.24

... More
Building;Flooring with Ceramic non skid tiles of not less than 7.3mm thick 1st quality laid over floor bed /VRCC slab set over 12.0 mm th.in CM (1:8 ) prop. base coat and neat grey cement slurry of honey like consistence spread at the rate of 3.3 kg of cement per Sqm and jointed with neat white cement paste mixed with pigment of matching shade including cost and conveyance of all materials to site, including cost of mixing of mortar and watering, leveling to proper slope and curing including over heads & contractor profit, all labour charges etc., and excluding GST and seignorage charges for finished item of work but excluding cost of CC bed and dadooing to walls

3.4

1091

3710.83

... More
Building;Providing skirting to internal walls to 15 cm height/risers of steps with vitrified tiles length equal to flooring stones, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including over heads & contractor profit cost and conveyrance of all materials like tiles, cement, sand and water etc., complete but excluding GST and seigniorage charges, etc., complete for finished item of work.

8.28

1180

9774.46

... More
Building;Flooring with vitrified tiles of 1st quality and of size not less than 600 x 600 mm x 8 mm thickness glossy finish permium colours, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand, and water and flooring tiles etc., complete, including over heads & contractor profit, labour charges etc., complete for finished item of work, but excluding GST and seignorage charges.

63.94

1175

75171.7

... More
Building;Plastering to brick masonary wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for outer Walls.

234.76

472

110848.98

... More
Building;Plastering to brick masonary wall with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for Internal Walls.

268.48

454

122104.7

... More
Building;Supply and fixing of pre-painted steel top hung and fixed louvered ventilators made of pre - painted steel as per IS 513 of -0.58 mm thick 'D quality, galvanized as per IS 277, finish painted with a polyester paint & 4 mm pinhead glass for ventilators with EPDM Gasket with handle made of high grade aluminium powder coated and nylon receiver, corner brackets made of CRCA with Zinc Phosphate, Mullion caps made of glass filled nylon, frames fixed to the concrete /masonry wall by means of self expanding screws including 10 mm square guard bars with 6 pitch complete for finished item of work for (i) Ventilators: Fixed louvers 2'-0 x 2'-0 (609.6 x 609.6mm) (Box section) outer frame section size of 33 x 56 mm and (ii) Ventilators: Fixed louvers 4'-0 x 2'-0 (1219.2 x 609.6 mm) (Box section) outer frame section size of 33 x 56 mm Mullion section size of 33 x 56 mm and (iii) Ventilators: Fixed louvers 4'-0 x 3'-0 (1219.2 x 914.4 mm) (Box section) outer frame section size of 33 x 56 mm Mullion section size of 33 x 56 mm

4.05

6424

26020.97

... More
Building;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter ? (2-glass shutters and 1-mesh shutter) duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (94 mm x 45 mm)/(80 mm x 52 mm) x 2.20 mm for outer frames, (58 mm x 39 mm)/(54 mm x 38 mm) x 2.20 mm for sliding shutter frames capable of mounting single glazing system structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.0/1.2 mm prefabricated & welded through fusion welding. The window sash shall be fitted with 5 mm thick clear float glass of reputed make and mesh shutter frame shall be (42 mm x 25 mm)/(52 mm x 21.5 mm) x 2.0 mm fitted with Vinyl Coated Fibre mesh- on rollers/ pulley duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. System shall have single point locking with Touch Lock and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

19.35

8894

172116.7

... More
Building;Supply and fixing of Salwood Door single shutter fully paneled Door of size 0.75x2.10 mts with frame and Flush door shutters, solid bond wood block board type with teak ply on both faces.: 35 mm thick conforming to IS : 2202 including cost and conveyance of all materials and labour charges for finished item of work etc., complete.

1

9948

9948.13

... More
Building;Supply and fixing of Salwood Door single shutter fully paneled Door of size 1.05x2.10 mts with frame and Flush door shutters, solid bond wood block board type with teak ply on both faces.: 35 mm thick conforming to IS : 2202 including cost and conveyance of all materials and labour charges for finished item of work etc., complete.

3

12333

36999.93

... More
Building;Supply and fixing of Salwood Door single shutter fully paneled Door of size 1.20x2.10 mts with frame and Flush door shutters, solid bond wood block board type with teak ply on both faces.: 35 mm thick conforming to IS : 2202 including cost and conveyance of all materials and labour charges for finished item of work etc., complete.

2

13546

27092.46

... More
Building;Plain Cement Concrete of (1:2:4) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding GST & seigniorage charges, sales & other taxes on all materials,for finished item of work (APSS No. 402).

0.65

6583

4279.09

... More
Building;For Sunshades 0.60 Mtrs

11.34

1079

12244.82

... More
Building;For Lintels

0.99

12719

12592.74

... More
Building;Reinforced Brick Masonry 115mm thick in superstructure with CM (1:4) prop: using 2nd class Bricks from approved source having minimum crushing strength of 50 kg/cm2 and placing 2 No.s of 6mm dia MS bars in every 3rd layer with free ends keyed into mortar joints including all operational & incidental, scaffolding, lift & labour charges, and Cost and Conveyance of all materials etc., complete for finished item of work but excluding seigniorage charges. (APSS No. 501 & 504)

10.61

9911

105158.47

... More
Building;Providing brick work of 230mm thick in CM (1:6) prop., using common burnt clay bricks of class as per Table-1 of IS:1077-1992 Non-Modular or traditional size , including cost & conveyance of all material and labour charges, centering & scafolding charges, and overhead charges & Contractors profit etc., complete as per APSS No.501 for Super structure and others but excluding GST and seignorage chages.

17.54

8347

146409.01

... More
Building;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

91.65

503

46142.11

... More
Building;Waist Slab 200mm thick

8.52

1955

16661.37

... More
Building;Roof Slab 125mm thick

91.65

1446

132557.06

... More
Building;For Roof Level Beams

4.76

12080

57504.7

... More
Building;Supply and filling of gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and GST etc., complete.

68.38

438

29966.85

... More
Building;For Plinth Beam

4.3

12225

52569.39

... More
Building;Construction of CR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including cost and conveyance of all material and all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement (APSS No. 601 & 615)

5.02

4905

24625.51

... More
Building;Construction of RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including cost and conveyance of all material and all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement (APSS No. 601 & 615)

5.02

4523

22707.87

... More
Building;Supply and filling of earth (ordinary soil) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges,and contractors profit & over heads but excluding seignorage charges and GST etc., complete.

29.17

181

5284.44

... More
Building;For Columns

4.39

12557

55127.29

... More
Building;For Pedestals

1.84

10064

18518.64

... More
Building;For Column Footings

5.54

9475

52496.82

... More
Building;Plain Cement Concrete of (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding GST & seigniorage charges, sales & other taxes on all materials,for finished item of work for Foundations (APSS No. 402).

25.6

4890

125201.41

... More
Building;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and GST etc., complete.

51.99

394

20506.52



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.