Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Civil And Construction
Building Construction
Opening Date19 May 2023
Closing Date26 May 2023
Tender Amount₹ 8,80,477 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;Flooring with Supply of soluble salt porcelain vitrified tiles screen printed and polished of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand, and water and flooring tiles etc., complete, including over heads & contractor profit, labour charges etc., complete for finished item of work, but excluding GST and seignorage charges.

45.49

1066

48514

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work

58.57

555

32538

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;Plastering with CM 2 coats, 20 mm thick, base coat in CM (1:6), 16 mm thick and top coat in CM (1:4), 4mm thick with Dubara sponze finishing. including c/c of all materials like cement, sand,water etc., to site, other taxes on all materials, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for for finished item of work. (APSS 1001,1003 & 1004) (CSSR) External Walls

102.51

507

51976

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;Plastering 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including c/c of all materials like cement, sand,water etc., to site, other taxes on all materials, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., complete for for finished item of work. (APSS 1001,1003 & 1004) (CSSR) Internal Walls

131.23

491

64566

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding windows with mesh shutter provision ? (only 2-glass shutters) duly manufactured using UPVC reinforced profiles (Composition of profile with Touch Lock and the is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work

4.32

7266

31393

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;Supply and fixing of Country wood Door double shutter fully panelled door of size 1.05 x 2.1mt with frame made of well seasoned country Wood scantlings of size 100 x 75mm and shutter made of side rails 100mm X 32mm, top rail 100 mmX32 mm, bottom rail 100mmX 32 mm and intermediate rails of 100mm x 32 mm and planks s - 5 no's of 25mm thick as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, 300 mm long MS Iron coted aldrop-1 no, 125mm long MS iron butt hinges 6 No's, Door stoppers-2 no, 150mm long MS coated Tower bolts 3- no's MS iron coated fancy handles 150 mm -2nos with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002)

1

14943

14943

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, Excluding seigniorage charges,Including, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. (APSS No. 501 & 504).

18.9

7998

151143

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;SLAB 125mm thick

58.57

1563

91562

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;BEAMS

2.73

13690

37352

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;Sunshade

7.2

765

5511

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;LINTELS

0.18

13810

2516

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;PLINTH BEAM

2.03

13221

26804

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;COLMNS

2.32

13220

30650

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;PEDASTALS

0.73

10229

7457

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;FOOTINGS

1.73

9537

16481.21

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;RCC M- 20 Nominal mix Equivalent to (1:2:4) (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, Sand of Concrete coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.

-

-

-

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;Supplying and filling selected earth in trenches ,sides of the foundations and basement with initial lead in layers not exceeding 15 cm thick consolidatiing each depposited layer by watering and rampping including cost and conveyance of water to work site and all operational incidental ,labour charges hire charges and T & O Complete for finished item APSS 309 &310)

23.1

626

14462

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;Plain Cement concrete M10 equivalent to (1:3:6) using 20mm metal 33% and 66% 40 mm metal with Concrete mixture. using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for basement walls (APSS No. 402) All work upto plinth level.

9.92

6756

66992

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;Plain Cement concrete M7.50 Equivalent to (1:4:8) using 40 mm metal with concrete mixture all work upto plinth level. nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)

6.97

4612

32174

... More
Mana Ooru Mana badi works(1.NEW CLASS ROOMS IN PLACE OF DILAPIDATED ROOMS,2.ELECTRIFICATION,3.DRINKI;Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including shoring, strutting, sheeting, planking and dewatering including cost of hire charges of T & P, labor charges etc., complete for finished item of work for Foundation of Building. (APSS No. 308)

35.75

258

9225



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.