Panchayat Raj Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Panchayat Raj Engineering Department Tender
Opening Date28 Nov 2024
Closing Date7 Dec 2024
Tender Amount₹ 27,79,696
Costs
EMD
₹ 27,797Document Cost
Refer DocumentsTender Fee
₹ 3,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
558367Tender No
NIT No.RO/PRED/VKB/72/2024-25 dated 12.11.2024 of the Regional Officer, PRED, VikarabadTender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Building;Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circuit Braker (ELCB) / Residual Current Circuit Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out ging including internal connections and labour charges for surface / flush mounting etc., complete.
3
6687
20062
Building;Supply and Run of 2 of 36/0.3mm (2.50 Sq.mm) FRLS PVC insulated 1100V grade as perIS:694/1990 specification for Copper cable with Run 1 of 14/0.3mm(1.0Sqmm) FRLS PVC insulated 1100Vgrade as perIS:694/1990 specification for Copper cable including cost and conveyance of all material and labour chages but excluding GST
150
152
22868
Building;Supply and Laying of 25mm outer dia heavy (2.20mm thickness) grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar / Maco Plast / Modi. make concealed in Roof Slabs with all required PVC / Metallic Deep Boxes including masonary work and labour charges etc., complete including masonary work, including cost and conveyance of all material, all labour charges, and contractor profit etc., complete but excluding GST
36
101
3664
Building;ELECTRIFICATION :Supply and laying of 25mm dia 1.8mm thick P.V.C.pipe ISI mark of Sudhakar / Maco Plast / Modi make concealed in wall with PVC / Metallic junction boxes and all required accessories including masonary work for light, fan and separate plug point with supply and fixing of suitable size Metallic deep box including all labour charges etc., complete including masonary work, including cost and conveyance of all material, all labour charges, and contractor profit etc., complete but excluding GST
95
120
11426
Building;Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Primar with Luppam finishing after thouroughky brushing the surface to remove all remains including cost and conveyance of all materials to site, Countryes & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).
58.62
213
12495
Building;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ Litand shade over Priming Coat with Cement Primer Waterbase Interior Gr-1 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GSTetc, complete for finished item of work as per SS 912 for external walls. First Floor
120.03
292
35164
Building;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ Litand shade over Priming Coat with Cement Primer Waterbase Interior Gr-1 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GSTetc, complete for finished item of work as per SS 912 for external walls. Ground Floor
360.08
266
95871
Building;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ Litand shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ aicoat/ Indocem or quivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GST etc, complete for finished item of work as per SS 911 for internal walls First Floor
113.3
221
25127
Building;Painting to new walls with 2 coats of acrylic emulsion paint interior grade having VOC (Volatile Organic Compound) content less than 30 grams/ Litand shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 Asian/ Berger/ Nerolac/ aicoat/ Indocem or quivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GST etc, complete for finished item of work as per SS 911 for internal walls Ground Floor
543.2
200
109151
Building;Supply and fixing of fully panelled Window frame and shutters of size 1.50 x 1.20 mt with Salwood frame of size 75x100mm and S/F of 4 Nos. MS Hold fasts, incl. all labour charges such as making window frame and shutters and fiXing 10 Nos.of 12 mm square safety bars in to the frame etc,including applying primory coat, cost and conveyance of all materials .
9
14542
130883
Building;Supply and fixing of Salwood Door double shutter fully panelled door of size 1.05 x 2.1mt with frame made of well seasoned Sal Wood scantlings of size 100 x 75mm and shutter made of side rails 100mm X 32mm, top rail 100 mmX32 mm, bottom rail 100mmX 32 mm and intermediate rails of 100mm x 32 mm and planks s - 5 no's of 25mm thick as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, 300 mm long MS Iron coted aldrop-1 no, 125mm long MS iron butt hinges 6 No's, Door stoppers-2 no, 150mm long MS coated Tower bolts 3- no's MS iron coated fancy handles 150 mm -2nos with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002)
3
12690
38070
Building;Supplying and fixing of 28/30 mm thick Wood Plastic Composite (WPC) Door shutter,comprising of 70% virgin polymer, 15% wood powder (fibre), and the remaining 15% additives,comprising of virgin PVC polymer of K value 58-60 (Suspension grade), Calcium carbonate and natural fibres (wood powder) and nontoxic additives (maximum toxicity index of 12 for 100 gms) having minimum door density of 650 kg/cum, screw withdrawal strength 1800N (Face) & 900N (Edge), Modulus of Elasticity 900N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk SS screws all as per direction of Engineer -in- Charge (SS butthinges and SS screws shall be paid separately)
1
5328
5329
Building;BLD-CSTN-9-1-(99) : Flooring with Polished Shabad stones 1st class 15 to 18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials. FF
29.71
817
24302
Building;BLD-CSTN-9-1-(99) : Flooring with Polished Shabad stones 1st class 15 to 18 mm thick (Tandur Stone slabs) set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials. Shabad Flooring GF
152.69
781
119394
Building;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) For Internal walls FF
196.64
515
101299
Building;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) For Internal walls GF
883.12
468
413618
Building;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work FF
43.29
8940
387046
Building;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work .GF Brickwalls
47.72
8570
408998
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. Sunshades FF
18.12
1135
20567
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.Sunshade GF
54.36
1102
59921
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.Lintels FF
0.26
13141
3417
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. Lintels GF
0.78
13009
10148
Building;Supply and placing of the Design Mix Concrete M20 corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. Roof Beams GF
11.94
12071
144140
Building;Painting to new walls with 2 coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ Litand shade over Priming Coat with Cement Primer Waterbase Interior Gr-1 Asian/ Berger/ Nerolac/ Saicoat/Indocem or Equivalenton New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GSTetc, complete for finished item of work as per SS 912 for external walls. Ground Floor
176.56
266
47009
Building;Providing Mild steel flats and bars for fabricating steel works like Window Grills, Compound Wall Grills, Iron Doors, Windows including cost of welding rods, power charges, including cost of fixing in position as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, all operational, incidental, and labour charges such as cutting, bending, placing in position etc., but excluding GSTfor finished item of work (APSS No.126) in all floors. For window grills, staircase railing & Compound wall grills etc
200
121
24314
Building;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) For Internal walls compound wall
176.56
468
82694
Building;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work. Compound wall
16.92
8570
145018
Building;Construction of RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including cost and conveyance of all material and all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement (APSS No. 601 & 615)
34.43
3957
136245
Building;Plain Cement Concrete of (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG M/c (SS5) metal with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, overhead charges & Contractors profit etc., complete but excluding GST & seigniorage charges, sales & other taxes on all materials,for finished item of work (APSS No. 402).
2.25
3998
8996
Building;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seignorage charges and GST etc., complete.
24.3
237
5778
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%