Panchayat Raj Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Panchayat Raj Engineering Department Tender
Civil And Construction
Building Construction
Opening Date15 Dec 2023
Closing Date18 Dec 2023
Tender Amount₹ 8,32,338
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
484302Bid Award Id
ViewTender No
65/SDF/2023-24 of DPRE,MahabubabadTender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Building;Providing Impervious coat to exposed RCC roof slab surface with CM (1:3) prop 20mm thick with 1Kg of water proof compound per bag of cement loaid over roof when it is green including cost of all materials seigniorage charges, excluding conveyance charges of material and including all operational incidental and labour charges of mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wll and slab etc., complete for finished item of work Over slab
107
5356
57319
Building;Providing high yield strength deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales other taxes on cost of all materials complete for finished item of work (APSS No.126)
2800
81
228424
Building;Vibrated reinforced cement concrete corresponding M 20 grade as per IS 456 equivalent to (1:1, 5:3) mix prop Nominal mix using 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including seigniorage charges VAT on all materials, all operational charges, incidental, and labour charges such as centering shuttring, scaffolding, lift charges,machine maxing laying concrete vibrating concrete etc., complete but excluding cost of steel and its fabrication charges for finished itemof work (APSS No.402 & 403)-For Roof slab 125mm thick
109.51
1653
181069
Building;Vibrated reinforced cement concrete corresponding M 20 grade as per IS 456 equivalent to (1:1, 5:3) mix prop Nominal mix using 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including seigniorage charges VAT on all materials, all operational charges, incidental, and labour charges such as centering shuttring, scaffolding, lift charges,machine maxing laying concrete vibrating concrete etc., complete but excluding cost of steel and its fabrication charges for finished itemof work (APSS No.402 & 403)-For Roof level beams for Rectangular beams
4.71
13886
65406
Building;Vibrated reinforced cement concrete corresponding M 20 grade as per IS 456 equivalent to (1:1, 5:3) mix prop Nominal mix using 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including seigniorage charges VAT on all materials, all operational charges, incidental, and labour charges such as centering shuttring, scaffolding, lift charges,machine maxing laying concrete vibrating concrete etc., complete but excluding cost of steel and its fabrication charges for finished itemof work (APSS No.402 & 403)-For Plinth Beams
3.39
13500
45767
Building;Vibrated reinforced cement concrete corresponding M 20 grade as per IS 456 equivalent to (1:1, 5:3) mix prop Nominal mix using 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including seigniorage charges VAT on all materials, all operational charges, incidental, and labour charges such as centering shuttring, scaffolding, lift charges,machine maxing laying concrete vibrating concrete etc., complete but excluding cost of steel and its fabrication charges for finished itemof work (APSS No.402 & 403)-For Column
4.1
13040
53467
Building;Vibrated reinforced cement concrete corresponding M 20 grade as per IS 456 equivalent to (1:1, 5:3) mix prop Nominal mix using 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including seigniorage charges VAT on all materials, all operational charges, incidental, and labour charges such as centering shuttring, scaffolding, lift charges,machine maxing laying concrete vibrating concrete etc., complete but excluding cost of steel and its fabrication charges for finished itemof work (APSS No.402 & 403)-For Column Pedestrial
1.72
11669
20071
Building;Vibrated reinforced cement concrete corresponding M 20 grade as per IS 456 equivalent to (1:1, 5:3) mix prop Nominal mix using 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including seigniorage charges VAT on all materials, all operational charges, incidental, and labour charges such as centering shuttring, scaffolding, lift charges,machine maxing laying concrete vibrating concrete etc., complete but excluding cost of steel and its fabrication charges for finished itemof work (APSS No.402 & 403)-For Column footings
6.14
9908
60836
Building;Plain cement concrete corresponding to (1:4:8) prop nominal mix (Cement: fine aggregate: coarse aggregate) using 40mm size hard broken granite (IS 383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15 cm finishing top surface curing concrete etc., complete for finished item of work
6.8
5201
35370
Building;Earth work excavation for foundations and depositing on bank with an initial lead of 10 mts and lift of 2 mts in loamy clayee soils like BC, red earth and ordinary gravel including all operational, labour charges such as shoring sheeting, planking, strutting etc., complete of finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B (APSS 308)
52.95
225
11934
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements