Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Building Construction
Opening Date10 Oct 2024
Closing Soon18 Oct 2024
Tender Amount₹ 6,05,521 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
balance work of SC community hall;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 12mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).

65.1

344

22415

... More
balance work of SC community hall;Filling with Gravel in basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all welded

29.54

504

14900

... More
balance work of SC community hall;Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand(unscreened)) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for Foundation and Basement (APSS No. 601 )

2.23

4007

8938

... More
balance work of SC community hall;Supply and fixing of Sal Wood Door frame and double shutter of size 1.20 X 2.10mts including fixing of 6 Nos of M.S. Hold fasts, 6 Nos. of 125mm long Mild steel (PC) Butt Hinges, 2 Nos. of 200mm long Alluminium Tower Bolts, 2 Nos. of 150mm long Alluminium Door Handles, 1No of 300mm long Alluminium Aldrop and 1 No of Door Stopper including cost and conveyance of all materials and labour charges etc., complete.

1

21090

21090

... More
balance work of SC community hall;Supply and fixing of Sal Wood Door frame and double shutter of size 1.20 X 2.10mts including fixing of 6 Nos of M.S. Hold fasts, 6 Nos. of 125mm long Mild steel (PC) Butt Hinges, 2 Nos. of 200mm long Alluminium Tower Bolts, 2 Nos. of 150mm long Alluminium Door Handles, 1No of 300mm long Alluminium Aldrop and 1 No of Door Stopper including cost and conveyance of all materials and labour charges etc., complete.

1

8590

8590

... More
balance work of SC community hall;Providing and fixing of two Shuttter Sliding windows Made of Galvanized Steel as per IS 513 D Quality, galvanized as per IS 277 with powder coated with pure Polyester Powder up to 50-60 microns thick with total coated thickness of 0.8mm for outer frame and 0.58 mm thickness for sliding shutter section, the outer frame for two tracks with grill provision size of 90mmx50mm and the Window Shutter section of 58mm x 36mm and the outer frame with two intergrated guide tracks of 12mm width and 24mm deep for provsision tos lide the shutter/sash frame and facilities with a water drain outlet component made of PVC and the shutter frame fitted with 5mm thick plain float glass of reputed make and fixed with EPDM weathering seal resistant accessories and handle made of aaluminimum 1 No. per each shutter including installation of Window System at site using anchor fasteners, Silicon Sealant applied at the Outer Frame corners inclusive of conveyance of all materials accessories, labour charges and erection at site with complete finished item of work for Window tih Two Sliding shutters and with Grill.

8.1

6273

50811

... More
balance work of SC community hall;Providing Mild steel flats cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in All Floors. For Staircase Railing & Compound Wall etc

180

107

19260

... More
balance work of SC community hall;Supplying, fitting and placing HYSD Fe 500 bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded

1.16

66650

77314

... More
balance work of SC community hall;Ornamental Plastering with CM(1:3) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906)

85.75

170

14662

... More
balance work of SC community hall;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)

219.37

403

88511

... More
balance work of SC community hall;Flooring with 25mm thick polished shabad stones set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

53.66

735

39490

... More
balance work of SC community hall;Skirting to walls with 12mm thick polished shabad stones set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

3.17

647

2053

... More
balance work of SC community hall;Painting to New External Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911) NOTE :: Standard data revised vide Chief Engineer, R&B (Buildings) Procs.No.CEB/TA8/AEE3/SSR: 2010-11 Dt: 21.01.2011. for external walls

114.76

210

24105

... More
balance work of SC community hall;Painting to New Interior Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911) NOTE :: Standard data revised vide Chief Engineer, R&B (Buildings) Procs.No.CEB/TA8/AEE3/SSR: 2010-11 Dt: 21.01.2011.

149.54

164

24572

... More
balance work of SC community hall;Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors

11.34

163

1853

... More
balance work of SC community hall;Supply and Fixing of 20mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.

15

79

1194

... More
balance work of SC community hall;Supply and Fixing of 25mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.

30

88

2667

... More
balance work of SC community hall;Cost,Supply and fixing of different sizes of Modular Galvanised Metal Boxes including cost and conveyence of all materials and labour charges etc complete.

2

327

655

... More
balance work of SC community hall;Cost,Supply and fixing of different sizes of Modular cover Frmaes including cost and conveyence of all materials and labour charges etc complete.

2

332

665

... More
balance work of SC community hall;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

12

529

6356

... More
balance work of SC community hall;Supply and fixing of 6A 5 pin Modular plug socket with 6A Modular switch control on Box with earth continuity including wire leads, earth connections along with all labour charges etc., complete.

12

280

3361

... More
balance work of SC community hall;Supply and run of 2 of 36/0.3mm (2.50 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for Mains inlcuding all labour charges etc., complete.

30

90

2718

... More
balance work of SC community hall;Supply of 900 mm (36") / 1200 mm (48") / 1400 mm (56") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories.

4

3079

12319

... More
balance work of SC community hall;Supply and fixing of Electronic Regulator of Modular of Anchor Roma make duly fixing on existing block including giving connections cost of all accessories and all labour charges etc., complete.

4

559

2236

... More
balance work of SC community hall;Supply and fixing of concealed box PVC/MS with hook for fan Supply and fixing PVC / MS galvanished Fan hook box with hook including all Labour charges etc., complete.

4

193

772

... More
balance work of SC community hall;Supply and transportation of 20W +/- 10%, >/ 2000 lumens, 1200mm length LEDretro tube light, housing made with glass body, wide operating voltage with Single / double side connection, PF=0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frostedcover CCT: 3000K - 6500K as desired by thedepartment and as per IS specifications,minimum CRI=80,.etc complete with 5 yearswarranty with BIS Certification.

6

424

2544

... More
balance work of SC community hall;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 40W bulb (for new installation).

6

70

420

... More
balance work of SC community hall;Supply and fixing SPN Distribution board with IP-42 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete.

1

6931

6932

... More
balance work of SC community hall;Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains.

30

88

2641



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.