Panchayat Raj Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
528007Tender No
HD/Tender/13/2024-25, Dt:28.06.2024 (5th Call) of SEPR SiddipetTender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
HLB including Maintenance;Providing and laying Vibrated cement concrete M 20 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 803, 1202 and 1203 MORD ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
236.32
6152
1453994
HLB including Maintenance;Providing and laying Vibrated cement concrete M 20 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
491.86
6507
3200876
HLB including Maintenance;Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation complete as per drawings and technical specifications Clauses 1000 MORD for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Foundation
9.76
74304
724927
HLB including Maintenance;Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure complete as per drawings and technical specification Clauses 1000 MORD for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Sub Structures
12.01
74573
895419
HLB including Maintenance;Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure complete as per drawing and technical specifications Clauses 1000 MORD, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Super Structures
21.12
76404
1613563
HLB including Maintenance;Providing and laying Vibrated reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. (-) - For foundation of Abutments & piers
161.48
6716
1084623
HLB including Maintenance;Providing and laying Vibrated reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. (upto 5m height) - For piers, side walls, bed blocks
23.84
7121
169804
HLB including Maintenance;Providing and laying Vibrated reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete. ( 5 to 10m height) - For piers, side walls, bed blocks
62.94
7380
464558
HLB including Maintenance;Providing and laying Vibrated reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. upto 5m height. - For Super Structure (Deck slab)
295.55
7740
2287842
HLB including Maintenance;Providing and laying Vibrated cement concrete Wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.
29.96
6919
207306
HLB including Maintenance;Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 MORD ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
106.52
941
100239
HLB including Maintenance;Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.
31.95
705
22540
HLB including Maintenance;Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 6Kgs/Sq.cm pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD including contractors profit & Over head charges, but excluding GST etc,. Complete.
137.7
358
49379
HLB including Maintenance;Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications 2607 MORTH to be installed by the manufacturer / supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation. including contractors profit & Over head charges, but excluding GST etc,. Complete.
37.5
3728
139811
HLB including Maintenance;Providing drainage spouts made 0.15 sqm of 6 mm thick MS plate 210 x 210 mm water spout at top with 100 mm dia GI drain spout and 5 Nos MS plate 12 mm x 40 mm x 210 mm long inluding cost of all materials and labour charges and contractors profit & Over head charges, but excluding GST etc,. Complete.
8
1466
11733
HLB including Maintenance;P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) mechanically mixed leveling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 MORD,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
7.88
5471
43088
HLB including Maintenance;Vibrated reinforced Cement Concrete M 30 grade Approach slab using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1211 MORD ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.
17.32
6758
117095
HLB including Maintenance;Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
106.49
888
94585
HLB including Maintenance;Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
66.05
1694
111923
HLB including Maintenance;Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 MORD including cost and conveyance of all materials and all labour charges etc., complete including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
74.45
1456
108462
HLB including Maintenance;Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
875.6
240
210538
HLB including Maintenance;Construction of granular sub-base by providing well graded material(Table 400.1.A) with Grading III Material(HBG M/C chips) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotaor at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401.2.1 MORD including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.
49.74
1818
90453
HLB including Maintenance;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
42.64
2424
103388
HLB including Maintenance;Construction of improved subgrade/ Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement with as per Technical Specification Clause 303 & 407 MORD , by using machinery including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.
45.48
276
12552
HLB including Maintenance;Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD ,including contractors profit & Over head charges, but excluding GST etc,. Complete. for Prime Coat
284.23
74
21289
HLB including Maintenance;Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc,. Complete. for Tack Coat
284.23
15
4312
HLB including Maintenance;Providing and laying Bituminous concrete with 100- 120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 % per cent of mix and filler, transporting the hot mix to work site, laying with a Mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects, including overhead charges & Contractors profit. but excluding Seig Charges, Labour Cess & GST etc,. Complete.
8.53
10409
88759
HLB including Maintenance;Construction of RCC guide posts of 250 mm dia M 20 grade cast-in-situ with 20 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical RCC posts not to exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2 including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.
78
674
52623
HLB including Maintenance;Providing & fixing of Typical PMGSY Title informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges,But excluding GST
2
12722
25444
HLB including Maintenance;Providing and fixing of typical PMGSY Citizen informatory sign board as per MORD specifications and drawing. Two MS Plates of 900x750x1.6 mm thick, top and lower plate duly welded with MS flat iron 40mm x 5m size on back on edges.The top & Lower plates will be welded to 2 nos. 75 mm x 75 mm or 75mm dia of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground level.All M.s. will be stove enameled on both sides. Lettering and printing arrows, border etc., will be pointed with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 MORD including contractors profit & Over head charges,But excluding GST
1
21317
21317
HLB including Maintenance;Providing and erecting direction and place identifications of semi reflective sign boards up to 0.90 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges, But Excluding GST.
2
2968
5938
HLB including Maintenance;Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.60mm thick MS sheet, with 600X 600 mm size MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.9 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, But Excluding GST
2
2245
4492
HLB including Maintenance;Cost, supply and fixing on road of Reflective Studs - RMP (Twin Moulded Shanks) including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.
381.6
361
137758
HLB including Maintenance;Cost, supply and Painting on road of Thermoplastic Paint including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.
76.53
663
50738
HLB including Maintenance;Rountine maintanance for 1 st year
1
51087
51087
HLB including Maintenance;Rountine maintanance for 2 nd year
1
129234
129234
HLB including Maintenance;Rountine maintanance for 3 rd year
1
66724
66724
HLB including Maintenance;Rountine maintanance for 4 th year
1
144881
144881
HLB including Maintenance;Rountine maintanance for 5 th year
1
67755
67755
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements