Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Opening Date6 Aug 2019
Closing Date16 Aug 2019
Tender Amount₹ 2,00,33,968 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Ankam Srikar (H) to Itikyal Bypass Road in Raikal Municipality, Est.Cost. Rs. 5.00 Lakhs( Sl.No.127)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Santhamurthi (H) to Itikyal Bypass Road in Raikal Municipality, Est.Cost. Rs. 5.00 Lakhs(Sl.No.128)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Sambaiah (H) to Nayeem (H) at Madeena Street, in Raikal Municipality, Est.Cost. Rs. 5.00 Lakhs(Sl.No.129)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Veerabathini Rajanna (H) to iSadhana School at Madeena Street, in Raikal Municipality, Est.Cost. Rs. 5.00 Lakhs(Sl.No.130)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Aligeti Uma (H) to Vemula Swami (H) at Indirangar in Raikal Municipality, Est.Cost. Rs. 4.00 Lakhs (Sl.No.131)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

28.13

23799

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

24.3

7210

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

46.54

301566

6479.72

... More
Laying of CC Road from Ibrahim (H) to Shaik Kareem (H) near Police station, in Raikal Municipality, Est.Cost. Rs. 5.00 Lakhs(Sl.No.135)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Gunnu Miya (H) to Kola Ashok (H) at Madeena street, in Raikal Municipality, Est.Cost. Rs. 5.00 Lakhs (Sl.No.136)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Kola Ashok (H) to Shadi Khana at Madeena street, in Raikal Municipality, Est.Cost. Rs. 5.00 Lakhs(Sl.No.137)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Dr. Jaganmohan Rao Complex to PS Oddera Colony, in Raikal Municipality, Est.Cost. Rs. 5.00 Lakhs(Sl.No.138)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Chiluveri yesh house to eedgah near cheruvu katta, in Raikal Municipality Est.Cost. 13.00 Lakhs (Sl.No.139)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

81.6

69039

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

73.44

21791

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

153

991397

6479.72

... More
Laying of CC Road from Vadla Anjaiah (H) to Kadakuntla Narahari (H) at Markandeya Nagar, in Raikal Municipality, Est.Cost. 5.00 Lakhs (Sl.No.140)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Sabeel Mee Seva to Kasaboina Harshith (H) near Old Bus stand, in Raikal Municipality, Est.Cost. 2.00 Lakhs(Sl.No.141)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

15.75

13325

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

14.58

4326

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

22.95

148709

6479.72

... More
Laying of CC Road from Old Police Station to Abdul Sadik (H) near Old Police station, in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.142)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Old Police Station to Abdul Bari (H) near Old Police station, in Raikal Municipality, Est.Cost. 3.00 Lakhs(Sl.No.143)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

21

17767

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

18.14

5382

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

34.75

225170

6479.72

... More
Laying of CC Road from Sabeel (H) to Sakali Bhoomaiah (H) near Old Police station, in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.144)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from R&B Road to Rajaka Sangam near Old Police station, in Raikal Municipality, Est.Cost. 3.00 Lakhs(Sl.No.145)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

21

17767

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

18.14

5382

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

34.75

225170

6479.72

... More
Laying of CC Road from R&B Road to Shantha Mallaiah (H) near Old Police station, in Raikal Municipality, Est.Cost. 4.00 Lakhs(Sl.No.146)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

28.13

23799

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

24.3

7210

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

46.54

301566

6479.72

... More
Laying of CC Road from R&B Road to Singeni Gangaram (H) at Bheemanna wada, in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.147)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Chiliveri Rambai (H) to Sadula Ashok (H) at Keshavanagar, in Raikal Municipality, Est.Cost. 4.00 Lakhs(Sl.No.148)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

28.13

23799

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

24.3

7210

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

46.54

301566

6479.72

... More
Laying of CC Road from Mangali Devaiah (H) to Dasari Rama (H) in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.149)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Mamidi Rajareddy (H) to Home Guard Swamy (H) at Keshava nagar in Raikal Municipality, Est.Cost. 3.00 Lakhs(Sl.No.150)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

21

17767

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

18.14

5382

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

34.75

225170

6479.72

... More
Laying of CC Road from Ausula Prasad (H) to Velma Narsareddy (H) in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.151)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Sirimalla Narayana (H) to Ennam Gopal (H) in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.152)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Aitha Naveen Shop to Ennam Gopal Flat at Gandhi nagar, in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.153)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from R&B Road to Katkam Suresh (H) at Gandhi nagar, in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.154)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from R&B Road to Aripelly Krishna (H) at Veerapur road, in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.155)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from R&B Road to Gutta Laxminarayana (H) at Jagtial Bypass Road, in Raikal Municipality, Est.Cost. 10.00 Lakhs(Sl.No.156)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

62.8

53133

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

56.52

16770

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

117.75

762987

6479.72

... More
Laying of CC Road from Konga Jalapathi (H) to Kurma Sudarshan (H) at Jagtial Bypass Road, in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.157)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Kasthuri Shanthaiah (H) to Ande Shankar (H) at Jagtial Bypass Road, in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.158)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Mera Lachanna (H) to Bethi Sathaiah (H) at Jagtial Bypass Road, in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.159)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying og CC Road from R&B Road to Bairi Lingam House & R&B Road to Bairi Santhosh at Jagityal bypass road,in Raikal Municipality, Est.Cost. 20.00 Lakhs(Sl.No.160)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

125.8

106435

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

113.22

33594

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

235.88

1528436

6479.72

... More
Laying of CC Road from Marampelly Ganganna (H) to Erra Sailu (H) at Indiranagar, in Raikal Municipality, Est.Cost. 2.00 Lakhs(Sl.No.161)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

15.75

13325

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

14.58

4326

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

22.95

148709

6479.72

... More
Laying of CC Road from Peddareddy Ravi (H) to Palepu Babu (H) at Indiranagar, in Raikal Municipality, Est.Cost. 2.00 Lakhs(Sl.No.162)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

15.75

13325

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

14.58

4326

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

22.95

148709

6479.72

... More
Laying of CC Road from Palepu Narsaiah (H) to Palepu Rajalingam (H) at Indiranagar, in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.163)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Kusanapelli Rajendhar (H) to Rajashekhar (H) at Indiranagar, in Raikal Municipality, Est.Cost. 3.00 Lakhs(Sl.No.164)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

21

17767

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

18.14

5382

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

34.75

225170

6479.72

... More
Laying of CC Road from D. Hanmath (H) to S. Madhu (H) at Indiranagar, in Raikal Municipality, Est.Cost. 3.00 Lakhs(Sl.No.165)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

21

17767

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

18.14

5382

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

34.75

225170

6479.72

... More
Laying of CC Road from Macharla Narsaiah (H) to Mothe Shivaram (H) at Indiranagar, in Raikal Municipality, Est.Cost. 4.00 Lakhs(Sl.No.166)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

28.13

23799

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

24.3

7210

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

46.54

301566

6479.72

... More
Laying of CC Road from Suntikar Laxman (H) to Gangareddy (H) at Indiranagar, in Raikal Municipality, Est.Cost. 4.00 Lakhs(Sl.No.167)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

28.13

23799

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

24.3

7210

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

46.54

301566

6479.72

... More
Laying of CC Road from Marathi Thukkamma (H) to Ralla Prabhakar (H) in Indiranagar, in Raikal Municipality, Est.Cost. 4.00 Lakhs(Sl.No.168)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

28.13

23799

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

24.3

7210

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

46.54

301566

6479.72

... More
Laying of CC Road from Marathi Manikyam (H) to Katkam Laxminarsayya (H) at Indiranagar, in Raikal Municipality, Est.Cost. 4.00 Lakhs(Sl.No.169)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

28.13

23799

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

24.3

7210

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

46.54

301566

6479.72

... More
Laying of CC Road from Way to Chennamaneni Venkateshwarlu (H) at Indiranagar, in Raikal Municipality, Est.Cost. 4.00 Lakhs(Sl.No.170)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

28.13

23799

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

24.3

7210

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

46.54

301566

6479.72

... More
Laying of CC Road from Gattupelli Gouramma (H) to D. Hanmanth (H) at Indiranagar, in Raikal Municipality, Est.Cost. 3.00 Lakhs(Sl.No.171)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

21

17767

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

18.14

5382

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

34.75

225170

6479.72

... More
Laying of CC Road from Kyatham Bhoomaiah (H) to Sravan (H) at Indiranagar, in Raikal Municipality, Est.Cost. 3.00 Lakhs(Sl.No.172)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

21

17767

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

18.14

5382

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

34.75

225170

6479.72

... More
Laying of CC Road from Sandela Rajesh (H) to Kushanapelly Laxmi (H) at Indiranagar, in Raikal Municipality, Est.Cost. 3.00 Lakhs(Sl.No.173)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

21

17767

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

18.14

5382

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

34.75

225170

6479.72

... More
Laying of CC Road from Way to Kalamadugu Sanjiv (H) at Indiranagar, in Raikal Municipality, Est.Cost. 3.00 Lakhs(Sl.No.174)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

21

17767

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

18.14

5382

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

34.75

225170

6479.72

... More
Laying of CC Road from Vemula Swamy (H) to Kalamadugu Chinna Narsaiah (H) at Indiranagar, in Raikal Municipality, Est.Cost. 4.00 Lakhs(Sl.No.175)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

28.13

23799

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

24.3

7210

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

46.54

301566

6479.72

... More
Laying of CC Road from Gattu Venkatapathi (H) to Marampelly Dubbaiah (H) at Indiranagar, in Raikal Municipality, Est.Cost. 3.00 Lakhs(Sl.No.176)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

21

17767

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

18.14

5382

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

34.75

225170

6479.72

... More
Laying of CC Road from Lingampelly Gangarajam (H) to Kalamadugu Gangarajam (H) at Indiranagar, in Raikal Municipality, Est.Cost. 4.00 Lakhs(Sl.No.177)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

28.13

23799

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

24.3

7210

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

46.54

301566

6479.72

... More
Laying of CC Road from Sandela Laxmi (H) to Chengeli Hanumandlu (H) at Indiranagar, in Raikal Municipality, Est.Cost. 3.00 Lakhs((Sl.No.178)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

21

17767

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

18.14

5382

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

34.75

225170

6479.72

... More
Laying of CC Road from Kondapoor Raju House to Mora Narsaiah House at Indra nagar,in Raikal Municipality, Est.Cost. 20.00 Lakhs(Sl.No.179)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

125.8

106435

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

113.22

33594

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

235.88

1528436

6479.72

... More
Laying of CC Road from Kalleda Gangaram (H) to Suthari Lachanna (H) at Korutla Road, in Raikal Municipality, Est.Cost. 4.00 Lakhs(Sl.No.180)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

28.13

23799

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

24.3

7210

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

46.54

301566

6479.72

... More
Laying of CC Road from Suthari Lachanna (H) to R&B Road at Bheemanna wada, in Raikal Municipality, Est.Cost. 4.00 Lakhs(Sl.No.181)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

28.13

23799

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

24.3

7210

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

46.54

301566

6479.72

... More
Laying of CC Road from Danaveni Chinna Mallaiah (H) to Neeli Anil (H) at Bathi wada, in Raikal Municipality, Est.Cost. 4.00 Lakhs(Sl.No.182)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

28.13

23799

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

24.3

7210

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

46.54

301566

6479.72

... More
Laying of CC Road from Neeli Anil (H) to Kola Chinna Bhoomaiah (H) at Bathi wada, in Raikal Municipality, Est.Cost. 3.00 Lakhs(Sl.No.183)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

21

17767

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

18.14

5382

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

34.75

225170

6479.72

... More
Laying of CC Road from Shaike Hussain (H) to Kadir (H) at Korutla Bypass Road, in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.184)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from R&B Road to Thuraga Rajaredy (H) at Jagtial Road, in Raikal Municipality, Est.Cost. 3.00 Lakhs(Sl.No.185)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

21

17767

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

18.14

5382

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

34.75

225170

6479.72

... More
Laying of CC Road from Shaike Hussain (H) to Jaleel (H) at Korutla Road, in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.186)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Laying of CC Road from Sura Madhu (H) to Alle Purushotham (H) at Jagtial Road, in Raikal Municipality, Est.Cost. 5.00 Lakhs(Sl.No.187)

-

-

-

... More
Construction of granular sub-base by providing well graded Grading -C Material (Table 400.2) having soacked CBR not less than 15% and Plasticity Index6 and stacking at site to the departmental gauge for pre measurements and mixing them and spreding the same with grader in uniform layers of loose thicknes of not more than 225mm including mixing by mix in place method with rotaBut excluding VAT or to OMC and compacting with Statical roller of 8 to 10 tons capacity to achive the desired density, complete as per IRC technical specification clause 402.3 of MORD. including all over heads charges and Contractors profit, But excluding GST and Seinarage charges (66% Gravel and 34% Stone Dust)

35.25

29823

846.07

... More
Collection and Supply of gravel by providing local material, spreading in uniform layers including cost and conveyance of all material and labour charges etc., complete.

30.46

9038

296.72

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 , CC M30(grade) coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved nominal mix , laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

58.33

377962

6479.72

... More
Total Items __________177________Only

-

24140219

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.