For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Building Construction
Opening Date8 Oct 2024
Closing Date16 Oct 2024
Tender Amount₹ 5,73,560 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
construction of balance work of Anganwadi building;Supply and transportation of 20W +/- 10%, >/ 2000 lumens, 1200mm length LEDretro tube light, housing made with glass body, wide operating voltage with Single / double side connection, PF=0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frostedcover CCT: 3000K - 6500K as desired by thedepartment and as per IS specifications,minimum CRI=80,.etc complete with 5 yearswarranty with BIS Certification.

10

-

5300

... More
construction of balance work of Anganwadi building;Supply and fixing of concealed box PVC/MS with hook for fan Supply and fixing PVC / MS galvanished Fan hook box with hook including all Labour charges etc., complete.

5

-

1018

... More
construction of balance work of Anganwadi building;Supply of 900 mm (36") / 1200 mm (48") / 1400 mm (56") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessories. Ceiling Fans

5

-

16634

... More
construction of balance work of Anganwadi building;Supply and run of 2 of 36/0.3mm (2.50 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for Mains inlcuding all labour charges etc., complete.Main Wiring

50

-

4314

... More
construction of balance work of Anganwadi building;Supply and fixing of 6A 5 pin Modular plug socket with 6A Modular switch control on Box with earth continuity including wire leads, earth connections along with all labour charges etc., complete.Switch Points

10

-

2328

... More
construction of balance work of Anganwadi building;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings Fan & Light Points

14

-

9786

... More
construction of balance work of Anganwadi building;Cost,Supply and fixing of different sizes of Modular cover Frmaes including cost and conveyence of all materials and labour charges etc complete. 12 Modular Cover frame:

8

-

2868

... More
construction of balance work of Anganwadi building;Cost,Supply and fixing of different sizes of Modular Galvanised Metal Boxes including cost and conveyence of all materials and labour charges etc complete. 12 Modular Metal Box

8

-

2868

... More
construction of balance work of Anganwadi building;Supply and Fixing of 25mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete. Concealed in Walls:

50

-

4624

... More
construction of balance work of Anganwadi building;Supply and Fixing of 20mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.Concealed in Roof Slab:

40

-

3385

... More
construction of balance work of Anganwadi building;S/F of Name board

1

-

3500

... More
construction of balance work of Anganwadi building;Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors Painting with Synthetic Enamil Paint:

55.9

-

9523

... More
construction of balance work of Anganwadi building;Painting to New Interior Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911) NOTE :: Standard data revised vide Chief Engineer, R&B (Buildings) Procs.No.CEB/TA8/AEE3/SSR: 2010-11 Dt: 21.01.2011. Internal Walls

195.45

-

33619

... More
construction of balance work of Anganwadi building;Painting to New External Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911) NOTE :: Standard data revised vide Chief Engineer, R&B (Buildings) Procs.No.CEB/TA8/AEE3/SSR: 2010-11 Dt: 21.01.2011. for external walls External walls:

140.55

-

30908

... More
construction of balance work of Anganwadi building;Providing skirting to internal walls to 15 cm height/risers of steps with ceramic tiles 7.30 mm thick length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials skirting to walls:

5.7

-

5191

... More
construction of balance work of Anganwadi building;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.Flooring:

2.49

-

1961

... More
construction of balance work of Anganwadi building;Dadooing to walls with white glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707) in All Floors

7.92

-

4211

... More
construction of balance work of Anganwadi building;Flooring with soluble salt porcelain Vitrified Tiles screen printed and polished of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs of make Jhonson & Jhonson, Kajaria, Nitco, Marbonite, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work. Flooring:

52.79

-

48491

... More
construction of balance work of Anganwadi building;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904) Plastering 20 mm thick:

153.6

-

68158

... More
construction of balance work of Anganwadi building;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) Inside Plastering:

156.8

-

66101

... More
construction of balance work of Anganwadi building;Ceiling Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for finished item of work. (APSS 901,903 & 904) Ornamental Plastering:

59.25

-

24981

... More
construction of balance work of Anganwadi building;Providing Mild steel flats cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in All Floors. For Staircase Railing & Compound Wall etc Window Open grills

200

-

21600

... More
construction of balance work of Anganwadi building;Supply and fixing of Window size 0.90 x 1.35 mt with sal wood frame of size 100x65mm with vertical mullions dividing the frame into 3 vertical panels @ 1/3 rd &2/3 and shutter with Salwood consists of styles & rails of size 30X75 mm. The window frame should be provided with 12mm dia MS Rods plain including cost of MSZ hold fasts 4nos, of 300X40X5mm size and cost of butt hinges MS (powder coated ) of 125mm long as per IS 208-4nos. (i.e., 2No. per each shutter ) including labour charges for fixing frame & shutters in position, applying a coat of tar on frame on wall side including cost & conveyance of all materials to site, . etc., complete. Windows W

3

-

11737

... More
construction of balance work of Anganwadi building;Supply and fixing of Window size 1.20 x 1.35 mt with sal wood frame of size 100x65mm with vertical mullions dividing the frame into 3 vertical panels @ 1/3 rd &2/3 and shutter with Salwood consists of styles & rails of size 30X75 mm. The window frame should be provided with 12mm dia MS Rods plain including cost of MSZ hold fasts 4nos, of 300X40X5mm size and cost of butt hinges MS (powder coated ) of 125mm long as per IS 208-4nos. (i.e., 2No. per each shutter ) including labour charges for fixing frame & shutters in position, applying a coat of tar on frame on wall side including cost & conveyance of all materials to site, . etc., complete. Windows W

5

-

25053

... More
construction of balance work of Anganwadi building;Supply and fixing door shutter with frame made out of PVC section and panels conforming to IS:10151-1982 having panel sizes of 100 mm x 30 mm with self extruded grooves at 40 mm x 50 mm grooves on front face and the infill panel dimension is 610 mm x 20 mm seamless hallow multi chambered PVC single panel for finished item of work.For Toilet

1

-

2532

... More
construction of balance work of Anganwadi building;Supply and fixing of Sal Wood Door frame and double shutter of size 0.90 X 2.10mts including fixing of 6 Nos of M.S. Hold fasts, 6 Nos. of 125mm long Mild steel (PC) Butt Hinges, 2 Nos. of 200mm long Alluminium Tower Bolts, 2 Nos. of 150mm long Alluminium Door Handles, 1No of 300mm long Alluminium Aldrop and 1 No of Door Stopper including cost and conveyance of all materials and labour charges etc., complete.Door ( 0.90x2.10)

2

-

9633

... More
construction of balance work of Anganwadi building;Supply and fixing of Sal Wood Door frame and double shutter of size 1.05 X 2.10mts including fixing of 6 Nos of M.S. Hold fasts, 6 Nos. of 125mm long Mild steel (PC) Butt Hinges, 2 Nos. of 200mm long Alluminium Tower Bolts, 2 Nos. of 150mm long Alluminium Door Handles, 1No of 300mm long Alluminium Aldrop and 1 No of Door Stopper including cost and conveyance of all materials and labour charges etc., complete.Door ( 1.05x2.10)

3

-

16427

... More
construction of balance work of Anganwadi building;Brick Masonry in superstructure with CM (1:6) prop: using II class bricks including Cost and Conveyance of all materials like cement, sand, bricks, water etc., to site, including materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work.Brick Masonry above Lintel

5.98

-

42871

... More
construction of balance work of Anganwadi building;Random Rubble stone masonry, in CM (1:8) prop: (Cement: Sand(unscreened)) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for Foundation and Basement (APSS No. 601 ) Brick Masonry above Lintel

3.89

-

15387

... More
construction of balance work of Anganwadi building;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 12mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).Impervious Coat:

78.17

-

29697

... More
construction of balance work of Anganwadi building;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.Roof Slab

8.09

-

9715

... More
construction of balance work of Anganwadi building;Plain Cement Concrete corresponding to M 7.5 grade as per IS 456 equivalent to (1:4:8:) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402) PCC M-5 for Foundations:

6.26

-

28605

... More
construction of balance work of Anganwadi building;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) E/W/E for Toilet block

8.44

-

1767



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.