Panchayat Raj Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Panchayat Raj Engineering Department Tender
Civil And Construction
Building Construction
Opening Date11 Sep 2023
Closing Date19 Sep 2023
Tender Amount₹ 4,98,502
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
457955Bid Award Id
ViewTender No
18/SDF/2023-24 of DPRE MahabubabadTender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Building;Random Rubble stone masonry, in CM (1:6) prop: (Cement: Sand(unscreened)) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for Foundation and Basement (APSS No. 601 )
10.17
4355
44300
Building;Providing high yield strength deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20 SWG forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying etc., and sales other taxes on cost of all materials complete for finished item of work (APSS No.126)
1700
85
144755
Building;Vibrated reinforced cement concrete corresponding M 20 grade as per IS 456 equivalent to (1:1, 5:3) mix prop Nominal mix using 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including seigniorage charges VAT on all materials, all operational charges, incidental, and labour charges such as centering shuttring, scaffolding, lift charges,machine maxing laying concrete vibrating concrete etc., complete but excluding cost of steel and its fabrication charges for finished itemof work (APSS No.402 & 403)-For Roof slab 115mm thick
51.84
1585
82203
Building;Vibrated reinforced cement concrete corresponding M 20 grade as per IS 456 equivalent to (1:1, 5:3) mix prop Nominal mix using 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including seigniorage charges VAT on all materials, all operational charges, incidental, and labour charges such as centering shuttring, scaffolding, lift charges,machine maxing laying concrete vibrating concrete etc., complete but excluding cost of steel and its fabrication charges for finished itemof work (APSS No.402 & 403)-For Roof level beams for Rectangular beams
2.61
13886
36244
Building;Vibrated reinforced cement concrete corresponding M 20 grade as per IS 456 equivalent to (1:1, 5:3) mix prop Nominal mix using 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including seigniorage charges VAT on all materials, all operational charges, incidental, and labour charges such as centering shuttring, scaffolding, lift charges,machine maxing laying concrete vibrating concrete etc., complete but excluding cost of steel and its fabrication charges for finished itemof work (APSS No.402 & 403)-For Plinth Beams
2.61
13500
35237
Building;Vibrated reinforced cement concrete corresponding M 20 grade as per IS 456 equivalent to (1:1, 5:3) mix prop Nominal mix using 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including seigniorage charges VAT on all materials, all operational charges, incidental, and labour charges such as centering shuttring, scaffolding, lift charges,machine maxing laying concrete vibrating concrete etc., complete but excluding cost of steel and its fabrication charges for finished itemof work (APSS No.402 & 403)-For Column
2.54
13040
33124
Building;Vibrated reinforced cement concrete corresponding M 20 grade as per IS 456 equivalent to (1:1, 5:3) mix prop Nominal mix using 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including seigniorage charges VAT on all materials, all operational charges, incidental, and labour charges such as centering shuttring, scaffolding, lift charges,machine maxing laying concrete vibrating concrete etc., complete but excluding cost of steel and its fabrication charges for finished itemof work (APSS No.402 & 403)-For Column Pedestrial
1.94
11669
22638
Building;Vibrated reinforced cement concrete corresponding M 20 grade as per IS 456 equivalent to (1:1, 5:3) mix prop Nominal mix using 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including seigniorage charges VAT on all materials, all operational charges, incidental, and labour charges such as centering shuttring, scaffolding, lift charges,machine maxing laying concrete vibrating concrete etc., complete but excluding cost of steel and its fabrication charges for finished itemof work (APSS No.402 & 403)-For Column footings
2.59
9908
25662
Building;Plain cement concrete corresponding to (1:4:8) prop nominal mix (Cement: fine aggregate: coarse aggregate) using 40mm size hard broken granite (IS 383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15 cm finishing top surface curing concrete etc., complete for finished item of work
4.46
5201
23173
Building;Earth work excavation for foundations and depositing on bank with an initial lead of 10 mts and lift of 2 mts in loamy clayee soils like BC, red earth and ordinary gravel including all operational, labour charges such as shoring sheeting, planking, strutting etc., complete of finished item of work including seigniorage excluding dewatering charges etc., as per SS 20 B (APSS 308)
20.57
225
4636