Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Construction Works
Opening Date10 May 2021
Closing Date27 May 2021
Tender Amount₹ 12,58,44,427 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Road construction and Maintenance;Construction of granular sub-base by providing well graded material(Table 400.1) with Grading III Material(HBG M/C chips) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotaor at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

9352.27

-

14162049

... More
Road construction and Maintenance;Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with all lifts and lead upto 1000 m as per Technical Specification Clause 305.4.3 MORTH including contractors profit & Over head charges, but excluding GST etc,. Complete.

13312.5

-

114621

... More
Road construction and Maintenance;Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD/ MORTH, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

8140.86

-

16150489

... More
Road construction and Maintenance;Construction of improved subgrade/ Shoulders by providing selected earth having minimum CBR of 10%, MDD not less than 1.85 g/cc with LL & PI not more than 40% and 20 respectively and spreading in uniform layers with tractor grader on prepared surface, and compacted at OMC with vibratory roller 80-100 kN to meet requirement of Table 300.2 with as per Technical Specification Clause 303 MORD / 305 MORTH, by using machinery including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

9703.12

-

2786542

... More
Road construction and Maintenance;Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over head charges, but excluding GST etc,. Complete. for Prime Coat

81647.5

-

2676405

... More
Road construction and Maintenance;Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc,. Complete. for Tack Coat

81647.5

-

772385

... More
Road construction and Maintenance;Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder of 3.30%, transported to site and laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

4082.38

-

26227422

... More
Road construction and Maintenance;Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.2 to 0.25 kg per sqm on the existing Bitume surfaces & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc,. Complete. for Tack Coat on Bitumen surface.

81647.5

-

655629

... More
Road construction and Maintenance;Providing and laying Bituminous concrete with 100- 120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % per cent of mix and filler, transporting the hot mix to work site, laying with a Mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects, including overhead charges & Contractors profit. but excluding Seig Charges, Labour Cess & GST etc,. Complete.

2449.44

-

16680882

... More
Road construction and Maintenance;Construction of un-reinforced, panneled cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, as per design, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, wedges, steel plates including levelling the formwork etc complete as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation, admixtures as approved, curing of concrete slab for 14-days, using curing compound (where specified) and water and cutting the grooves of 1/3rd depth of the slab thickness for forming the panels of 0.75 X 0.75 mts size as per drawing and Technical Specification Clause 1501 including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

1414.62

-

11292343

... More
Road construction and Maintenance;Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Foundation

2.85

-

162127

... More
Road construction and Maintenance;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations for Construction of HP Culvert 1V of 1000mm Dia.NP3 Pipes 11 Nos at 1/020, 1/600, 3/930, 5/700, 5/800, 5/950, 14/050, 14/400, 15/400, 16/000, 16/800, KM

229.88

-

23133

... More
Road construction and Maintenance;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

44.32

-

36841

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

152.61

-

792362

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

156.5

-

859473

... More
Road construction and Maintenance;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

110

-

921182

... More
Road construction and Maintenance;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations for Construction of 2 v 1000mm Dia NP3 Class Pipes Culvert 3 Nos at 10/780, 15/700, 16/400, 18/400 KM

128.48

-

12929

... More
Road construction and Maintenance;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

37.93

-

31532

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

73.91

-

383739

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

71.05

-

390204

... More
Road construction and Maintenance;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

80

-

669950

... More
Road construction and Maintenance;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations for Construction of 3 v 1000mm Dia NP3 Class Pipes Culvert 2 Nos at 7/400 Km

42.22

-

4248

... More
Road construction and Maintenance;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

14.8

-

12304

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

23.08

-

119837

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

21.3

-

116968

... More
Road construction and Maintenance;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

30

-

251231

... More
Road construction and Maintenance;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations for Construction of 1 v 900mm Dia NP3 Class Pipes Culvert 5 Nos at 1/200, 2/300, 5/000, 6/600, 8/750 Km

93.45

-

9404

... More
Road construction and Maintenance;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

13.65

-

11347

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

65.53

-

340246

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

64.43

-

353838

... More
Road construction and Maintenance;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 900 mm dia Pipes

25

-

169806

... More
Road construction and Maintenance;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations for Construction of 2 v 900mm Dia NP3 Class Pipes Culvert 1 Nos at 3/500, Km

25.47

-

2563

... More
Road construction and Maintenance;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

4.68

-

3888

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

17.33

-

89959

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

16.03

-

88012

... More
Road construction and Maintenance;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 900 mm dia Pipes

10

-

67922

... More
Road construction and Maintenance;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations for Construction of 3 v 900mm Dia NP3 Class Pipes Culvert 3 Nos at 2/700, 9/200, 10/780 Km

96.76

-

9737

... More
Road construction and Maintenance;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

19.87

-

16519

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

64.64

-

335608

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

57.5

-

315769

... More
Road construction and Maintenance;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 900 mm dia Pipes

45

-

305650

... More
Road construction and Maintenance;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations for Construction of 1 Vents of 4.00mx1.50m span Slab Culverts 1 Nos at 17/250 Kms

218.23

-

21960

... More
Road construction and Maintenance;Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in Foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete..For levelling course

15.22

-

70828

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

88.9

-

461579

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

54.65

-

300109

... More
Road construction and Maintenance;Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. (upto 5m height) For For piers, side walls, bed blocks

11.83

-

84508

... More
Road construction and Maintenance;Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. upto 5m height. - For Super Structure (Deck slab)

29.5

-

229353

... More
Road construction and Maintenance;Providing and laying cement concrete Wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

3.57

-

24271

... More
Road construction and Maintenance;Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

8.6

-

5612

... More
Road construction and Maintenance;Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 MORD ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

23.52

-

22019

... More
Road construction and Maintenance;Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

36.87

-

26831

... More
Road construction and Maintenance;Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 6Kgs/Sq.cm pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST etc,. Complete.

68

-

22981

... More
Road construction and Maintenance;Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

9.79

-

14975

... More
Road construction and Maintenance;Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

120.75

-

24382

... More
Road construction and Maintenance;P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) mechanically mixed leveling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 MORD & 2700 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.Leveling Coarse below Approch Slab

7.88

-

43798

... More
Road construction and Maintenance;Reinforced Cement Concrete M 30 grade Approach slab using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1211 MORD / 1500, 1600, 1700 & 2704 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

7.88

-

48867

... More
Road construction and Maintenance;Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For Protection Work

29.1

-

39112

... More
Road construction and Maintenance;Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Foundation

0.61

-

34815

... More
Road construction and Maintenance;Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Sub Structures

0.46

-

26217

... More
Road construction and Maintenance;Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Super Structures

7

-

410678

... More
Road construction and Maintenance;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations for Construction of 1 Vents of 5.00mx2.00m span Slab Culverts 1 Nos at 0/260 Kms

228.31

-

22975

... More
Road construction and Maintenance;Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in Foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete..For levelling course

15.93

-

74132

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

94.44

-

490344

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

78.69

-

432167

... More
Road construction and Maintenance;Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. (upto 5m height) For For piers, side walls, bed blocks

11.83

-

84508

... More
Road construction and Maintenance;Providing and laying reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 & 1700 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. upto 5m height. - For Super Structure (Deck slab)

38.13

-

296425

... More
Road construction and Maintenance;Providing and laying cement concrete Wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

4.32

-

29370

... More
Road construction and Maintenance;Cost, supply and fixing of Bituminous Mastic pad 25.4 mm including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

9.75

-

6360

... More
Road construction and Maintenance;Construction of R.C.C. railing of M 25 grade (excluding cost of reinforcement) in cast-in-situ with 20 & 10 mm nominal size aggregate (HBG), true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 MORD ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

25.52

-

23891

... More
Road construction and Maintenance;Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

44.39

-

32308

... More
Road construction and Maintenance;Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 110 mm dia PVC 6Kgs/Sq.cm pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including contractors profit & Over head charges, but excluding GST etc,. Complete.

68

-

22981

... More
Road construction and Maintenance;Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

13.05

-

19967

... More
Road construction and Maintenance;Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

120.75

-

24382

... More
Road construction and Maintenance;P.C.C. M 15 ordinary grade (1:2.5:5) using 40,20 & 10mm metal (HBG) mechanically mixed leveling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 MORD & 2700 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.Leveling Coarse below Approch Slab

7.88

-

43798

... More
Road construction and Maintenance;Reinforced Cement Concrete M 30 grade Approach slab using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1211 MORD / 1500, 1600, 1700 & 2704 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

7.88

-

48867

... More
Road construction and Maintenance;Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For Protection Work

33.67

-

45261

... More
Road construction and Maintenance;Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Foundation

0.61

-

34815

... More
Road construction and Maintenance;Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Sub Structures

0.61

-

34956

... More
Road construction and Maintenance;Supplying, fitting, and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Super Structures

8

-

469346

... More
Road construction and Maintenance;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations for Const. of 60 m Road Dam with 3 vents of 1000mm Dia NP3 Class pipes 1 No at 7/580 Km

220.44

-

22183

... More
Road construction and Maintenance;Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in Foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete..For levelling course

57.83

-

269096

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

229.59

-

1192072

... More
Road construction and Maintenance;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material including fixing collar with cement mortar 1:2 but excluding excaion, protection works, backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD ,including contractors profit & Over head charges, but excluding Seig Charges& GST etc,. Complete. - For Pipe Culverts with - 1000 mm dia Pipes

22.5

-

188424

... More
Road construction and Maintenance;Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORD / 710.14 of IRC, 78 & 2200 MORTH, including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

309.65

-

225356

... More
Road construction and Maintenance;Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 / 40 kg laid dry complete as per drawing and technical specifications Clause 1301 MORD / 2503 MORTH including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete. - For Protection Work

73.99

-

99451

... More
Road construction and Maintenance;Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in Foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete..For levelling course

53.89

-

250761

... More
Road construction and Maintenance;Providing and laying cement concrete Wearing course M 30 (Design Mix) grade using 20 & 10mm metal (HBG) mechanically mixed excluding reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD and 2702 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete.

45

-

305933

... More
Road construction and Maintenance;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations for Construction of Retaining wall of 15.00m Length 7 Nos at 2/660, 3/900, 10/850, 14/150, 14/650, 15/480, 16/000 KM

302.4

-

30431

... More
Road construction and Maintenance;Providing concrete for plain concrete M 10 grade in open foundations using 40 mm nominal size Graded hard stone aggregate (HBG), mechanically mixed, placed in Foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH ,including contractors profit & Over head charges, but excluding Seig Charges, Labour Cess & GST etc,. Complete..For levelling course

60.48

-

281451

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

147.42

-

765422

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

73.71

-

404791

... More
Road construction and Maintenance;Earthwork excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excaed suitable material as per Technical Specification 305 MORD / 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. - For Foundations for Construction of Village Side Drains 925 mts.

4578.75

-

460760

... More
Road construction and Maintenance;Filling in foundation trenches / Pipe bedding with Sand as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

83.25

-

69203

... More
Road construction and Maintenance;Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed in Foundation complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.

328.38

-

1704962

... More
Road construction and Maintenance;Reinforced cement concrete M25 grade (Design Mix) using 20 & 10mm metal (HBG) mechanically mixed in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH ,including contractors profit & Over head charges,but excluding Seig Charges, Labour Cess & GST etc,. Complete.. (upto 5m height)

19.24

-

137481

... More
Road construction and Maintenance;Supplying, fitting and placing HYSD bar reinforcement (Fe-500- From Primary producers ,Like TATA,SAIL,VSP, Jindal&Shyam steel Etc, ) in Substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections 1600 & 2200 MORTH for Bars below 36 mm dia including over laps and wastage, where they are not welded ,including contractors profit & Over head charges, but excluding GST etc,. Complete. - For Sub Structures

1.92

-

109879

... More
Road construction and Maintenance;Reinforced cement concrete M15 grade Kilometre stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding Seignorage charges and GST -Ordinary KM Stones

3

-

11622

... More
Road construction and Maintenance;Reinforced cement concrete M15 grade Kilometre stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding Seignorage charges and GST -Ordinary KM Stones

18

-

41095

... More
Road construction and Maintenance;Reinforced cement concrete M15 grade HM stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 MORD / 804 MORTH including contractors profit & Over head charges, but excluding Seignorage charges and GST -200M H.M Stones

72

-

46158

... More
Road construction and Maintenance;Providing & fixing of Typical PMGSY Title informatory sign board with LOGO as per MORD secifications and drawing. Three MS plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mmx5mm size on black on edges. The lower plate will be welded with MS angle iron frame of lower most plate and flate iron frame of middle plate will be welded to 2 nos 75mmx75mm of 12 SWG sheet tubes posts duly embedded in CC M15 grade blocks of 450mmx450mmx600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mmx47mm of 12 SWG sheet plate tube. All MS will be stove enmeled on both sides. Lettering and paining of superior quality in required shede and colour. All sections of framed posts and sheet tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 and annexure 1700.1 if MORD including contractors profit & Over head charges,But excluding GST

2

-

19701

... More
Road construction and Maintenance;Providing and fixing of typical PMGSY Citizen informatory sign board as per MORD specifications and drawing. Two MS Plates of 900x750x1.6 mm thick, top and lower plate duly welded with MS flat iron 40mm x 5m size on back on edges.The top & Lower plates will be welded to 2 nos. 75 mm x 75 mm or 75mm dia of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450 mm x 450 mm x 600 mm, 600 mm below ground level.All M.s. will be stove enameled on both sides. Lettering and printing arrows, border etc., will be pointed with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing clause 1701 MORD including contractors profit & Over head charges,But excluding GST

3

-

49824

... More
Road construction and Maintenance;Providing and erecting direction and place identifications of semi reflective sign boards up to 0.90 sqm size board as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint in white colour in front and grey colour on back with red reflective border of 70 mm width and required message, letters, figures with reflective engineering grade tape as per MORD specifications of required shade and colour. supported and welded on 47 mm x 47 mm of 12 SWG Square tube of 3050 mm height duly strengthened by 25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 1701 MORD including contractors profit & Over head charges, But Excluding GST.

25

-

58082

... More
Road construction and Maintenance;Providing and fixing of semi-reflective cautionery, mandatory and informatory boards as per IRC:67 made of 1.60mm thick MS sheet, with 600X 600 mm size MS sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 65mm width and required letters and figures with reflective engineering grade tape as per clause 1701.3.9 of MORD for rural roads specification of required shade and colour supported and welded on 47x47mm of 12 SWG square tube of 3050mm height duly strenthened by 25x5mm MS flat iron on edges on back firmly fixed to ground by means of properly designed foundations with M-15 grade CC 450x450x600 mm , 600mm below ground level as per approved drawings and technical specification Clause 1701.2.2 of MORD including contractors profit & Over head charges, But Excluding GST

50

-

88388

... More
Road construction and Maintenance;Cost, supply and fixing on road of Reflective Studs - RMP (Twin Moulded Shanks) including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

1076

-

388436

... More
Road construction and Maintenance;Cost, supply and Painting on road of Thermoplastic Paint including cost and conveyance and all labour charges and including contractors profit & Over head charges, but excluding GST etc,. Complete.

569

-

377247

... More
Road construction and Maintenance;Rountine maintanance for 1 st year

18.34

-

1133995

... More
Road construction and Maintenance;Rountine maintanance for 2 nd year

18.34

-

1383528

... More
Road construction and Maintenance;Rountine maintanance for 3 rd year

18.34

-

1527646

... More
Road construction and Maintenance;Rountine maintanance for 4 th year

18.34

-

1781704

... More
Road construction and Maintenance;Rountine maintanance for 5 th year

18.34

-

1916772



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.