Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Building Construction
Opening Date30 Dec 2024
Closing Date7 Jan 2025
Tender Amount₹ 6,21,462 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Community Hall Balance Works behind Hanuman Temple, Sy.235 near Padmanayaka Veluma S;Supply and filling of gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges, etc., complete.

33.58

469

15768

... More
Construction of Community Hall Balance Works behind Hanuman Temple, Sy.235 near Padmanayaka Veluma S;Roofing Roofing will be provided with 0.5mm thick galvanized/pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping/drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove

80

956

76531

... More
Construction of Community Hall Balance Works behind Hanuman Temple, Sy.235 near Padmanayaka Veluma S;Supplying and fixing of M.S. Tubes for trusses & purlins including fabrication cost of fixing, labour charges etc., complete

909

173

157911

... More
Construction of Community Hall Balance Works behind Hanuman Temple, Sy.235 near Padmanayaka Veluma S;RCC M-20 Nominal mix (Cement:fine aggregate (50% Natural sand + 50% Rock sand): coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% Natural sand + 50% Rock sand) (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, Incidental and labour charges such as machine mixing. centering, shuttering laying concrete, curing etc..complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding cost of steel and its fabrication charges for finished item of work. for Columns

2.38

12261

29183

... More
Construction of Community Hall Balance Works behind Hanuman Temple, Sy.235 near Padmanayaka Veluma S;RCC M-20 Nominal mix (Cement:fine aggregate (50% Natural sand + 50% Rock sand): coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% Natural sand + 50% Rock sand) (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, Incidental and labour charges such as machine mixing. centering, shuttering laying concrete, curing etc..complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding cost of steel and its fabrication charges for finished item of work. for Plinth Beams

2.81

11894

33425

... More
Construction of Community Hall Balance Works behind Hanuman Temple, Sy.235 near Padmanayaka Veluma S;RCC M-20 Nominal mix (Cement:fine aggregate (50% Natural sand + 50% Rock sand): coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% Natural sand + 50% Rock sand) (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, Incidental and labour charges such as machine mixing. centering, shuttering laying concrete, curing etc..complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding cost of steel and its fabrication charges for finished item of work. for Pedestals

1.3

9733

12654

... More
Construction of Community Hall Balance Works behind Hanuman Temple, Sy.235 near Padmanayaka Veluma S;RCC M-20 Nominal mix (Cement:fine aggregate (50% Natural sand + 50% Rock sand): coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (50% Natural sand + 50% Rock sand) (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, Incidental and labour charges such as machine mixing. centering, shuttering laying concrete, curing etc..complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding cost of steel and its fabrication charges for finished item of work. for Column Footings

4.05

9145

37039

... More
Construction of Community Hall Balance Works behind Hanuman Temple, Sy.235 near Padmanayaka Veluma S;Random Rubble stone masonry. In CM (1:6) prop: (Cement: Sand) using hard granite stones from approved quarry Including Cost and Conveyance of all materials like Granite stones, cement, sand, water, etc., to site Including all operational, Incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation (APSS No. 601 & 615)

9.45

4100

38753

... More
Construction of Community Hall Balance Works behind Hanuman Temple, Sy.235 near Padmanayaka Veluma S;Supply and filling of earth (ordinary soil) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) including cost and conveyance of all material and labour charges, etc., complete.

17.15

339

5826

... More
Construction of Community Hall Balance Works behind Hanuman Temple, Sy.235 near Padmanayaka Veluma S;Plain Cement Concrete (1:4:8) prop nominal mix (cement: fine aggregate (50% Natural sand + 50% Rock sand): coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry (obtained by blasting) including Cost and Conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all operational, Incidental, and labour charges such as mixing. laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)

10.15

4778

48503

... More
Construction of Community Hall Balance Works behind Hanuman Temple, Sy.235 near Padmanayaka Veluma S;Construction of Community Hall Balance Works behind Hanuman Temple, Sy.235 near Padmanayaka Veluma Sangam at Rangapur(V), Medipally(M). - Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD/304 MORTH

24.5

416

10195



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.