Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Construction Material
Opening Date15 Feb 2024
Closing Date23 Feb 2024
Tender Amount₹ 33,41,505 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CC pavement;Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. MORD including contractors profit & Over head charges, But excluding GST

152

37

5733

... More
CC pavement;Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20 respectively and and spreading in uniform layers with tractor grader on prepared surface and copacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD,305 MoRT&H by using machinery including all over heads , and Contractors profit ,But excluding GST & Seignarage charges, etc, complete.

17.1

261

4477

... More
CC pavement;Construction of Plain Cement Concrete Pavement , over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

34.2

6251

213810

... More
CC pavement;Construction of Sub Base by providing well graded material STONE DUST and Spreading in uniform layers including watering and tamping etc complete as per technical specification incluidng cost and conveyance of all materials and all labour charges etc complete.

17.1

919

15724

... More
CC pavement;Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. MORD including contractors profit & Over head charges, But excluding GST

228

37

8600

... More
CC pavement;Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20 respectively and and spreading in uniform layers with tractor grader on prepared surface and copacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD,305 MoRT&H by using machinery including all over heads , and Contractors profit ,But excluding GST & Seignarage charges, etc, complete.

41.1

297

12227

... More
CC pavement;Construction of Plain Cement Concrete Pavement , over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

102.75

7102

729825

... More
CC pavement;Construction of Sub Base by providing well graded material STONE DUST and Spreading in uniform layers including watering and tamping etc complete as per technical specification incluidng cost and conveyance of all materials and all labour charges etc complete.

51.38

1044

53679

... More
CC pavement;Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. MORD including contractors profit & Over head charges, But excluding GST

548

42

23482

... More
CC pavement;Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20 respectively and and spreading in uniform layers with tractor grader on prepared surface and copacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD,305 MoRT&H by using machinery including all over heads , and Contractors profit ,But excluding GST& Seignarage charges, etc, complete.

52.2

297

15529

... More
CC pavement;Construction of Plain Cement Concrete Pavement , over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

130.5

7102

926932

... More
CC pavement;Construction of Sub Base by providing well graded material STONE DUST and Spreading in uniform layers including watering and tamping etc complete as per technical specification incluidng cost and conveyance of all materials and all labour charges etc complete.

65.25

1044

68170

... More
CC pavement;Granular sub-base/base/surface course with local materials (Table 400.13) i.e., Naturally occurring gravel by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting three wheel 80-100 kN static roller / Vibratory Roller 80-100 kN to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408 MORD including overhead & Contract profit but excluding GST

34.8

598

20827

... More
CC pavement;Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. MORD including contractors profit & Over head charges, But excluding GST

696

42

29824

... More
CC pavement;Construction of Improved Subgrade /Shoulders by providing Selected earth having MDD not less than 1.85g/cc with LL & PI not exceeding 40% and 20 respectively and and spreading in uniform layers with tractor grader on prepared surface and copacted to OMC with Vibratory roller of 80 to 100kN capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD,305 MoRT&H by using machinery including all over heads , and Contractors profit ,But excluding VAT & Seignarage charges, etc, complete.

64

297

19039

... More
CC pavement;Construction of Plain Cement Concrete Pavement , over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD.

120

7102

852352

... More
CC pavement;Construction of Sub Base by providing well graded material STONE DUST and Spreading in uniform layers including watering and tamping etc complete as per technical specification incluidng cost and conveyance of all materials and all labour charges etc complete.

60

1044

62685

... More
CC pavement;Granular sub-base/base/surface course with local materials (Table 400.13) i.e., Naturally occurring gravel by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting three wheel 80-100 kN static roller / Vibratory Roller 80-100 kN to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408 MORD including overhead & Contract profit but excluding GST

160

598

95755

... More
CC pavement;Scarifying existing granular surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and leads upto 1000 m as per Technical Specification Clause 301.4. MORD including contractors profit & Over head charges, But excluding GST

640

42

27424



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.