Panchayat Raj Engineering Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Panchayat Raj Engineering Department Tender
Civil And Construction
Building Construction
Opening Date11 Sep 2023
Closing Date19 Sep 2023
Tender Amount₹ 8,36,195
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
457742Bid Award Id
ViewTender No
45/SDF/2023-24 of DPRE MahabubabadTender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Building;Fixing of 40W tube light luminaire on wall / Ceiling with / TW round blocks with all accessories including giving connections and all labour charges etc., complete.
12
193
2320
Building;Supply and transportation of 20W +/-10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, inimum CRI=80,.etc complete with 5 years warranty with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec/ FIEM / Arraystorm / GM / oldmedal LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.
12
636
7635
Building;Supply and fixing of concealed box PVC/MS with hook for fan Supply and fixing PVC / MS galvanished Fan hook box with hook including all Labour charges etc., complete.
5
229
1146
Building;Supply, Transportation of energy efficient fan, 1200 mm sweep, aluminium body, consuming 28 W, BEE 5 star rated, ceiling fan with Brush Less Direct Current(BLDC)motor, class of insulation: B, 3 no's blades, 30 cm long down rod, 2 no's canopies, shackle'kit, safety rope, copper winding, Power Factor greater than 0.90, Service Value (CMMAV) greater than 8.5, Air delivery minimum 235 CMM, 350 RPM( tolerance as per IS:374-2019), THD less than 0%. with remote or compatible to electronic step type regulator unit for speed control and all remaining accessories including safety pin, nut bolts, washers, temperature rise=75 degree C(max), insulation resistance more than 2 mega ohm, suitable for 230V, 50 HZ, single phase AC supply, arthing etc., including all standard accessories etc., complete. Makes : Atomberg (Efficio ) / Havells / Orient / Halonix
2
3771
7542
Building;Supply and run of 2 of 36/0.3mm (2.50 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for Mains inlcuding all labour charges etc., complete.
120
107
12868
Building;Supply and fixing of 6A 5 pin Modular plug socket with 6A Modular switch control on Box with earth continuity including wire leads, earth connections along with all labour charges etc., complete.
20
320
6418
Building;Wiring with 2 runs of 14/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings
30
646
19388
Building;Cost,Supply and fixing of different sizes of 8 / 12 Modular Horizontal / Vertical Cover Frame of Anchor Roma including cost and conveyence of all materials and labour charges etc complete.-Supply of 6 Module Cover Frame:
3
265
796
Building;Cost,Supply and fixing of different sizes of 8 / 12 Modular Horizontal / Vertical Cover Frame of Anchor Roma including cost and conveyence of all materials and labour charges etc complete.-Supply of 12 Module Cover Frame:
6
377
2267
Building;Cost,Supply and fixing of different sizes of modular Galvanised metal Boxes including cost and conveyence of all materials and labour charges etc complete.-6 Modular Metal Box
3
265
796
Building;Cost,Supply and fixing of different sizes of modular Galvanised metal Boxes including cost and conveyence of all materials and labour charges etc complete.-12 Modular Metal Box
6
372
2233
Building;Supply and Fixing of 25mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.
90
101
9095
Building;Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains.
20
94
1900
Building;Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
62.32
204
12753
Building;Painting to New External Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911) NOTE :: Standard data revised vide Chief Engineer, R&B (Buildings) Procs.No.CEB/TA8/AEE3/SSR: 2010-11 Dt: 21.01.2011. for external walls
181.55
244
44316
Building;Painting to New Interior Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911) NOTE :: Standard data revised vide Chief Engineer, R&B (Buildings) Procs.No.CEB/TA8/AEE3/SSR: 2010-11 Dt: 21.01.2011.
428.08
186
79918
Building;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 12mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, etc., complete for finished item of work (APSS No. 901 & 903).
135.49
395
53620
Building;Filling with Gravel in basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310).
27
489
13215
Building;Dadooing to walls with white glazed tiles 1st. quality of any size of brand as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, seigniorage charges, sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work (APSS No.701 & 707) in All Floors
27.15
886
24059
Building;Flooring with ceramic tiles, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
6.63
865
5736
Building;Flooring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
103.78
1004
104291
Building;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for Uneven Surfaces of Brick Wall for finished item of work. (APSS 901,903 & 904)
151.31
482
73000
Building;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
325.92
457
149076
Building;Ornamental Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
132.4
457
60560
Building;Supply and fixing of Window size 0.90 x 1.20 mt with sal wood frame of size 100x65mm with vertical mullions dividing the frame into 3 vertical panels @ 1/3 rd &2/3 and shutter with Salwood consists of styles & rails of size 30X75 mm. The window frame should be provided with 12mm dia MS Rods plain including cost of MSZ hold fasts 4nos, of 300X40X5mm size and cost of butt hinges MS (powder coated ) of 125mm long as per IS 208-4nos. (i.e., 2No. per each shutter ) including labour charges for fixing frame & shutters in position, applying a coat of tar on frame on wall side including cost & conveyance of all materials to site, . etc., complete.
6
2600
15600
Building;Supply and fixing of Window size 1.83 x 1.20 mt with sal wood frame of size 100x65mm with vertical mullions dividing the frame into 3 vertical panels @ 1/3 rd &2/3 and shutter with Salwood consists of styles & rails of size 30X75 mm. The window frame should be provided with 12mm dia MS Rods plain including cost of MSZ hold fasts 4nos, of 300X40X5mm size and cost of butt hinges MS (powder coated ) of 125mm long as per IS 208-4nos. (i.e., 2No. per each shutter ) including labour charges for fixing frame & shutters in position, applying a coat of tar on frame on wall side including cost & conveyance of all materials to site, . etc., complete.
1
5225
5225
Building;Supply and fixing of Window size 1.20 x 1.20 mt with sal wood frame of size 100x65mm with vertical mullions dividing the frame into 3 vertical panels @ 1/3 rd &2/3 and shutter with Salwood consists of styles & rails of size 30X75 mm. The window frame should be provided with 12mm dia MS Rods plain including cost of MSZ hold fasts 4nos, of 300X40X5mm size and cost of butt hinges MS (powder coated ) of 125mm long as per IS 208-4nos. (i.e., 2No. per each shutter ) including labour charges for fixing frame & shutters in position, applying a coat of tar on frame on wall side including cost & conveyance of all materials to site, . etc., complete.
3
3250
9750
Building;Supply and fixing of Sal Wood Door double shutter of size 0.75 X 2.05 mts including fixing of 6 Nos. of 125mm long Mild steel (PC) Butt Hinges, 2 Nos. of 200mm long Alluminium Tower Bolts, 2 Nos. of 150mm long Alluminium Door Handles, 1No of 300mm long Alluminium Aldrop and 1 No of Door Stopper including cost and conveyance of all materials and labour charges etc., complete.
3
4175
12525
Building;Supply and fixing of Sal Wood Door double shutter of size 1.20 X 2.00 mts including fixing of 6 Nos. of 125mm long Mild steel (PC) Butt Hinges, 2 Nos. of 200mm long Alluminium Tower Bolts, 2 Nos. of 150mm long Alluminium Door Handles, 1No of 300mm long Alluminium Aldrop and 1 No of Door Stopper including cost and conveyance of all materials and labour charges etc., complete.
3
6150
18450
Building;Brick masonry 230 mm thick for panel walls in superstructure with CM (1:6) proportion using II nd class country bricks of size 23x11x7 cm from approved source having crushing strength not less than 35kg/sqcm including cost and conveyance of all materials like cement ,sand ,bricks, water etc., to site , including seignorage charges ,sales and other taxes on all materials and all operational ,incidental and labour charges such as mixing cement mortar, curing scafolding charges, constructing masonary,lift charges,curing etc., complete for finished item of work
0.41
8389
3440
Building;Plain Cement Concrete corresponding to M 5 grade as per IS 456 equivalent to (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry with concrete mixture including cost and conveyance of all materials like cement, sand(unscreened), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)
10.42
5290
55124
Building;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m and lift of 2M in Loamy and Clayey soils like BC Soils,Red Earth and Ordinary gravel including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).
0.21
225
47
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements