Panchayat Raj Engineering Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Panchayat Raj Engineering Department Tender

Works
Civil And Construction
Building Construction
Opening Date3 Jan 2025
Closing Date17 Jan 2025
Tender Amount₹ 8,01,194 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Community Hall;Filling gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work. (APSS NO. 309 & 310)

49.52

451

22367.69

... More
Community Hall;Supply and filling of earth (ordinary soil) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T&P etc., complete for finished item of work. (APSS NO. 309 & 310)

18.26

193

3527.47

... More
Community Hall;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786- 1985) of 8mm to 40mm diamters, cutting,bending to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of bars from approved sousrces to site of work including cost and conveyance of binding wire, cover blocks and all operational incidental and labocharges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding GST and other taxes on all materials etc., complete for finished item of work (APSS No.126) in all floors.

2850

74

211612.5

... More
Community Hall;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) mix prop Nominal mix using Concrete Mixer with 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as centering shuttring, scaffolding, lift chareges, machine mixing laying concrete vibrating concrete etc.. complete but excluding cost of steel and its fabrications charges for finsished item of work(APSS No 402&403) Roof slab 115mm thick

108.84

1438

156597.9

... More
Community Hall;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) mix prop Nominal mix using Concrete Mixer with 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as centering shuttring, scaffolding, lift chareges, machine mixing laying concrete vibrating concrete etc.. complete but excluding cost of steel and its fabrications charges for finsished item of work(APSS No 402&403) for Roof level beams

4.67

12593

58809.68

... More
Community Hall;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) mix prop Nominal mix using Concrete Mixer with 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as centering shuttring, scaffolding, lift chareges, machine mixing laying concrete vibrating concrete etc.. complete but excluding cost of steel and its fabrications charges for finsished item of work(APSS No 402&403) For Plinth Beam

2.22

12678

28145.98

... More
Community Hall;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) mix prop Nominal mix using Concrete Mixer with 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as centering shuttring, scaffolding, lift chareges, machine mixing laying concrete vibrating concrete etc.. complete but excluding cost of steel and its fabrications charges for finsished item of work(APSS No 402&403) For Columns

3.52

12971

45659.86

... More
Community Hall;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) mix prop Nominal mix using Concrete Mixer with 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as centering shuttring, scaffolding, lift chareges, machine mixing laying concrete vibrating concrete etc.. complete but excluding cost of steel and its fabrications charges for finsished item of work(APSS No 402&403) For coloumn Pedastals

2.16

10331

22315.44

... More
Community Hall;Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) mix prop Nominal mix using Concrete Mixer with 20mm size HBG metal machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as centering shuttring, scaffolding, lift chareges, machine mixing laying concrete vibrating concrete etc.. complete but excluding cost of steel and its fabrications charges for finsished item of work(APSS No 402&403) For Column Footings

6.75

9705

65510.1

... More
Community Hall;Plain Cement Concrete of (1:5:10) prop nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size hard broken granite (IS 383, 1970) metal from approved quary including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete etc... complete for finished item of work

13.17

4897

64497.7

... More
Community Hall;Earth work excavation for foundations and depositing on bank with an initial lead of 10mts and lift of 2 mts in loamy clayee soils like BC, red earth and ordinary gravel including all operational, incidental, labour charges such as shoring sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS-20 B (APS5 308)

46.29

416

19263.12



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.