Panchayat Raj Engineering Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 6,500Document Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
583324Tender No
90/2024-25, dt. 23.01.2025 (4th call) of DPRE, PIU KhammamTender Authority
Panchayat Raj Engineering Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
construction of balance work of Anganwadi building;Supplying and Filling of Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310).
20.96
-
11712
... More
construction of balance work of Anganwadi building;Brick masonry 230 mm thick for panel walls in superstructure with CM (1:6) proportion using II nd class country bricks of size 23x11x7 cm from approved source having crushing strength not less than 35kg/sqcm including cost and conveyance of all materials like cement ,sand ,bricks, water etc., to site , including seignorage charges ,sales and other taxes on all materials and all operational ,incidental and labour charges such as mixing cement mortar, curing scafolding charges, constructing masonary,lift charges,curing etc., complete for finished item of work
22.34
-
162023
... More
construction of balance work of Anganwadi building;Reinforced Brick Masonry 11.5cm (4 1/2") thick for partition walls in CM (1:4) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. and placing 2nos. of 6mm dia MS bars embedded in every 3rd layer with free ends of reinforcement keyed into mortar joints of the main brick work whereever applicable including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., but excluding cost and conveyance of steel and its fabrication charges complete for finished item of work. (APSS No. 501 & 504).
18.22
-
14673
... More
construction of balance work of Anganwadi building;Ceiling Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for finished item of work. (APSS 901,903 & 904)
70.83
-
29832
... More
construction of balance work of Anganwadi building;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, sales & other taxes on all materials,all operational, incidental and labour charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing, etc., complete for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904)
158.19
-
66626
... More
construction of balance work of Anganwadi building;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904)
88.83
-
39368
... More
construction of balance work of Anganwadi building;Flooring with 25mm thick polished shabad stones set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
53.7
-
41236
... More
construction of balance work of Anganwadi building;Providing skirting to internal walls to 15 cm height/risers of steps with 25 mm thick polished Cuddapah stone length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like Cuddapah stone, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials
6.33
-
5524
... More
construction of balance work of Anganwadi building;Painting to New Interior Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911) NOTE :: Standard data revised vide Chief Engineer, R&B (Buildings) Procs.No.CEB/TA8/AEE3/SSR: 2010-11 Dt: 21.01.2011.
229.02
-
39394
... More
construction of balance work of Anganwadi building;Painting to New External Walls with two coats of Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911) NOTE :: Standard data revised vide Chief Engineer, R&B (Buildings) Procs.No.CEB/TA8/AEE3/SSR: 2010-11 Dt: 21.01.2011. for external walls
88.83
-
19535
... More
construction of balance work of Anganwadi building;Supply and fixing of Sal Wood Door frame and double shutter including fixing of 6 Nos of M.S. Hold fasts, 6 Nos. of 125mm long Mild steel (PC) Butt Hinges, 2 Nos. of 200mm long Alluminium Tower Bolts, 2 Nos. of 150mm long Alluminium Door Handles, 1No of 300mm long Alluminium Aldrop and 1 No of Door Stopper including cost and conveyance of all materials and labour charges etc., complete. (1.05 x 2.10 )
2
-
18002
... More
construction of balance work of Anganwadi building;Supply and fixing of Sal Wood Door frame and double shutter including fixing of 6 Nos of M.S. Hold fasts, 6 Nos. of 125mm long Mild steel (PC) Butt Hinges, 2 Nos. of 200mm long Alluminium Tower Bolts, 2 Nos. of 150mm long Alluminium Door Handles, 1No of 300mm long Alluminium Aldrop and 1 No of Door Stopper including cost and conveyance of all materials and labour charges etc., complete. (0.90 x 2.10 )
2
-
16370
... More
construction of balance work of Anganwadi building;Supply and fixing of Sal Wood Window frame and shutter including fixing of 4 Nos of M.S. Hold fasts, 6 Nos. of 125mm long Mild steel (PC) Butt Hinges, 3 Nos. of 200mm long Alluminium Tower Bolts, 3 Nos. of 150mm long Alluminium Door Handles, including cost and conveyance of all materials and labour charges etc., complete. ( 1.50x 1.35)
4
-
40229
... More
construction of balance work of Anganwadi building;Supply and fixing of Sal Wood Window frame and shutter including fixing of 4 Nos of M.S. Hold fasts, 6 Nos. of 125mm long Mild steel (PC) Butt Hinges, 3 Nos. of 200mm long Alluminium Tower Bolts, 3 Nos. of 150mm long Alluminium Door Handles, including cost and conveyance of all materials and labour charges etc., complete. (0.90 x 1.35)
2
-
15844
... More
construction of balance work of Anganwadi building;Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Primer with Luppam finishing after thoroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors
42.73
-
7279
... More
construction of balance work of Anganwadi building;Supply and Fixing of 20mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in Roof Slab with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.
30
-
2539
... More
construction of balance work of Anganwadi building;Supply and Fixing of 20mm dia 1.5mm thick P.V.C. pipe (ISI MARK) concealed in wall with all required accessories including masonary work for light, fan and separate plug point with well seasoned wooden deep box including all labour charges etc., complete.
30
-
2774
... More
construction of balance work of Anganwadi building;Cost,Supply and fixing of different sizes of modular Galvanised metal Boxes including cost and conveyence of all materials and labour charges etc complete. ( 12 Modular Metal Box )
3
-
1076
... More
construction of balance work of Anganwadi building;Cost,Supply and fixing of different sizes of modular Galvanised metal Boxes including cost and conveyence of all materials and labour charges etc complete. ( 8 Modular Metal Box )
1
-
309
... More
construction of balance work of Anganwadi building;Cost,Supply and fixing of different sizes of 8 / 12 Modular Horizontal / Vertical Cover Frame of Anchor Roma including cost and conveyence of all materials and labour charges etc complete. ( 12Modular Cover Frame)
3
-
1076
... More
construction of balance work of Anganwadi building;Cost,Supply and fixing of different sizes of 8 / 12 Modular Horizontal / Vertical Cover Frame of Anchor Roma including cost and conveyence of all materials and labour charges etc complete. ( 8 Modular Cover Frame)
1
-
304
... More
construction of balance work of Anganwadi building;Wiring with 2 runs of 14/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings ( For Fan & Light Points )
12
-
4334
... More
construction of balance work of Anganwadi building;Supply and fixing of 6A 5 pin Modular plug socket with 6A Modular switch control on Box with earth continuity including wire leads, earth connections along with all labour charges etc., complete. ( For Switch Points )
5
-
1609
... More
construction of balance work of Anganwadi building;Supply and run of 2 of 36/0.3mm (2.50 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for Mains inlcuding all labour charges etc., complete. ( For Main Wiring )
45
-
4892
... More
construction of balance work of Anganwadi building;Supply and errecting ceiling fan5 STAR RATED of Crompton /bajaj / havells /n make as per IS 374 - 1979 and with 3 blades and double ball bearings and with condenser AC 250V 50 C/S of 48" 1200mm sweep completely erected in position without regulator, canopy down rod up to 301.80 mm in length is provided with hook/clamps nuts and bolts and 24/02 flexible copper wire etc., complete including cost and conveyance of all materials and labour chargers etc., complete including 4% tornover tax on cost of all materials for finished item of work. ( For Ceiling Fan )
4
-
13307
... More
construction of balance work of Anganwadi building;Supply and fixing of 2 Module Modular type Electronic FanRegulator make duly fixing on existing block including giving connections cost of all accessories and all labour charges etc., complete. ( For Fan Regulator )
4
-
2335
... More
construction of balance work of Anganwadi building;Supply and transportation of 20W +/- 10%, >/ 2000 lumens, 1200mm length LEDretro tube light, housing made with glass body, wide operating voltage with Single / double side connection, PF=0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frostedcover CCT: 3000K - 6500K as desired by thedepartment and as per IS specifications,minimum CRI=80,.etc complete with 5 yearswarranty with BIS Certification. ( For Tube LIghts)
8
-
4240
... More
construction of balance work of Anganwadi building;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 40W bulb (for new installation). ( For Batten Holders )
8
-
1444
... More
construction of balance work of Anganwadi building;Supply and fixing 8 Way SPN Distribution board with IP-43 protection (Metal Door) suitable for 1 No. 40 A single phase ELCB / RCCB/DP Isolator as incomer and 8 Nos. 6-32 A 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete Makes : Legrand / Schneider / Siemens / L&T ( For SPN Distribution Board )
1
-
4440
... More
construction of balance work of Anganwadi building;Supply and Run of 2 of 10 Sq.mm WPSC Aluminium cable along with No.10 SWG G.I bearer wire through PVC cleats with all accessories including labour charges etc., complete for service mains. ( For Service Wire )
45
-
3082
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements