Osmania University Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Osmania University Tender
Civil And Construction
Building Construction
Opening Date11 Mar 2025
Closing Date25 Mar 2025
Tender Amount₹ 5,39,376
Costs
EMD
₹ 5,394Document Cost
Refer DocumentsTender Fee
₹ 2,500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
580484Tender No
221/1/EE/UBD/2025, Dt:10.03.2025Tender Authority
Osmania University ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
of Work Providing Repairs to Room No.18,30,34;Supplying and applying one coat of bitumen 85/25 spraying at the rate of 0.50 kg/ sq.mt over G.I. Profile sheet and after laying a layer of Tarfelt App 1.50mm over lapping 75mm on side lapping 100mm all over lapping on systems.Seal the all joints with Hot Bitumen 85/25 & finally finish with super silver shield including all incidental,operational,material & labour charges for finished item of work. (Rate as per quotation 58/sft (or) 624.40/ sq.mt + 5% extra for variation of rate)
35
654
22912.75
... More
of Work Providing Repairs to Room No.18,30,34;Cutting holes in Brick masonry &repairs to the same Labour charges only etc., complete for finished item of work.
16
61
976
... More
of Work Providing Repairs to Room No.18,30,34;Providing impervious coat to exposed RCC Roof Slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab including etc., complete for finished item of work. Second Floor
110
709
77990
... More
of Work Providing Repairs to Room No.18,30,34;Supply and fixing false ceiling using 8 mm thick Cement Bonded particle boards conforming to IS 14276 with galvanized and pre painted steel T section of size 24mm x 38mm x 0.3 mm for main T duty pre punched to accept cross T section of size 24mm x 30mm x 0.3 mm duly punched at both ends for insertion into main T. The grid size will be 610mm x 610mm. The framework (grid) is suspended to the roof by using G.I flat of 0.60mm or 14-gauge G.I wire with necessary fixers to the roof and framework the cost is inclusive of necessary hardware, labour, one coat of primer (Both side) and two coats of smooth finish on visible side etc., complete for finished item of work.
22
1347
29634
... More
of Work Providing Repairs to Room No.18,30,34;Providing 110 mm Dia ISI marked PVC down water take pipes with socket 4kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, PVC Shoes PVC clamps and all other accessories and fixing in position including Cutting holes in Brick masonry & repairs including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site including etc., complete for finished item of work.
60
346
20781
... More
of Work Providing Repairs to Room No.18,30,34;Third Floor
1
8259
8259.4
... More
of Work Providing Repairs to Room No.18,30,34;Plain Cement Concrete (1:2:4) (M20) Grade Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including, sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing & lift charges including etc., for finished item of work. Second Floor
10
8097
80975
... More
of Work Providing Repairs to Room No.18,30,34;Providing and applying Acrylic Based Adhesive bonding coats with BRUSH BOND RFX of FOSROCK make applying two coats with brushes to cover the surface uniformly before placing the screde concrete as per the manufactures specifcation, including sales and other taxes including cost and conveyance of all materials, labour charges, incidental and operational chrages, transporation charges and including etc., complete for finished item of work
10
298
2984
... More
of Work Providing Repairs to Room No.18,30,34;Removing the existing False ceiling including all alluminium frames fixtures etc., carefully and stocking the material as directed by the departmental officers useful for reuse including cost of all labour charge, incidental and operational charges, transporation to stores (Director Office) etc., complete for finished item of work.
22
51
1137.4
... More
of Work Providing Repairs to Room No.18,30,34;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges including etc., complete. Unreinforced cement concrete up to 15cm thickness etc., complete for finished item of work.
10
1861
18617
... More
of Work Providing Repairs to Room No.18,30,34;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges including etc., complete.Kadapa slabs or Shahabad stone slabs flooring on sand bed etc., complete for finished item of work
10
12
120
... More
of Work Providing Repairs to Room No.18,30,34;Third Floor
2
763
1526.8
... More
of Work Providing Repairs to Room No.18,30,34;First Floor
80
654
52344
... More
of Work Providing Repairs to Room No.18,30,34;b) External walls :- i) Ground Floor
55
606
33341
... More
of Work Providing Repairs to Room No.18,30,34;Second Floor Interior
10
682
6822
... More
of Work Providing Repairs to Room No.18,30,34;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge including etc., complete for finished item of work A) Interior walls :- First Floor
130
644
83746
... More
of Work Providing Repairs to Room No.18,30,34;Ornamental Plastering to Ceiling with 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., complete for finished item of work. First Floor
50
630
31520
... More
of Work Providing Repairs to Room No.18,30,34;Brick masonry for Panel walls 230mm thick in superstructure with CM (1:8) prop: (Cement : Screened Sand) using Second Class Clay Bricks of size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curingetc., complete for finished item of work. Third Floor
0.4
9604
3841.68
... More
of Work Providing Repairs to Room No.18,30,34;Dismantling the old cement / lime mortar plaster including Clean removal from walls and raking out joints 20 mm deep or from terraced roof/ ceiling and raking out joints from 50 mm to 100 mm deep clearing away and carefully and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge all labour charges, incidental and operational charges etc., complete for finished item of work.
410
9
3690
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%