Osmania University Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Osmania University Tender

Works
Civil And Construction
Building Construction
Opening Date20 Sep 2023
Closing Date27 Sep 2023
Tender Amount₹ 95,312 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Drainage pipe line;Masonry work in CM (1:8) prop (Cement : Screened sand) with Flyash Cement Solid Blocks of size 290mm x 225mm x 140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs , .Gypsum of 5kgs and stone dust including cost and conveyance of all materials,labour charges,seigniorage charges,scaffolding and curing including etc., complete with a compressive strength not less than 50 kg/sq.cm for walls etc., complete for finished item of work.

1.4

7062

9887.64

... More
Drainage pipe line;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge including etc., complete for finished item of work .

13

551

7163

... More
Drainage pipe line;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges including etc., complete. Rough Shahabad Stone Flooring- etc., complete for finished item of work.

26

9

234

... More
Drainage pipe line;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges including etc., complete. Unreinforced cement concrete up to 15cm thickness.

1.2

1673

2008.56

... More
Drainage pipe line;Plain Cement Concrete (1:5:10) (Cement: Fine Aggregate (unscreen sand) : Coarse Aggregate (Metal) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing including etc., complete for finished item of work.

3.9

4802

18728.19

... More
Drainage pipe line;Plain Cement Concrete (1:2:4) (M20) Grade Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing & lift charges including etc., for finished item of work.

0.85

7265

6175.25

... More
Drainage pipe line;Making drainage connection from a drainage line in to an existing inspection chamber/ manhole including making a hole in to the chambers, placing necessary pipes in the connection and making good the junction in and out of the chambers including cost of necessary cement, sand and aggregate etc complete.

1

150

150

... More
Drainage pipe line;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, complete for finished item of work at all floor levels. For 110mm dia per 6 RM

5

339

1699

... More
Drainage pipe line;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, complete for finished item of work at all floor levels. For 75mm dia per 6 RM

5

228

1140

... More
Drainage pipe line;Laying Departmental supplied with Rough Shahabad Stone Slabs set over base coat of cement mortar (1:8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar (1:3) duly filling joints nearly, joints nearly, excluding cost of all materials like flooring stone, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work.

27

536

14472



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.