Osmania University Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
485112Bid Award Id
ViewTender No
1882/EE(I)/UBD/2023, Dated:19.12.2023Tender Authority
Osmania University ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Renovation of Ladies Toilets in Cellar;Earth work excavation for foundations (Manual Means) of buildings in ordinary soils and depositing the same on bank with an initial lead of 10m and depth up to 3m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., complete for finished item of work Excluding seigniorage Excluding dewatering charges etc.,
2.5
437
1092.5
... More
Renovation of Ladies Toilets in Cellar;Plain Cement Concrete (1:4:8) prop (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including , sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work.
1.85
4983
9219.66
... More
Renovation of Ladies Toilets in Cellar;Constructions of Coursed Rubble stone masonry 2nd sort in CM (1:8) prop: (Cement: Sand) using Hard Granite Stones carted from approved quarry including cost and conveyance of all materials like cement, sand, water, stones etc., from approved quarry, to site and including , sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc., complete for finished item of work.
1
5427
5427.6
... More
Renovation of Ladies Toilets in Cellar;Construction of Reinforced Brick Masonry for Partition walls (11.0 CM Thick) in CM (1:4) prop. (Cement : Sand) using second class bricks of size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including , sales & other taxes on all materials, all operational, incidental charges such as labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., but including cost of steel and its fabrication charges complete for finished item of work.
15
893
13399.5
... More
Renovation of Ladies Toilets in Cellar;Supply and fixing doors as per drawings with Medium Teak wood frame of section 100mm x 65mm and ISI marked flush door shutter of 35mm thick Single Shutter with bond wood solid block board type Core having cross bands and face veneers, hot pressed bonded with water proof phenol formaldehyde synthetic resin factory made conforming to IS 2202-1991 (Part-I) both sides commercial ply with internal lipping on all sides including cost and conveyance to site of door frame, flush shutter, including suply and fixing 6 Nos MS Z hold fasts of size 230mm x 40mm x 5mm including 4 Nos MS powder coated Butt Hinges of 125mm long, including supplying and fixing 1.20mm thick PVC Sheet to full height of the Shutter inside including labour charges for fixing the frame in position, fixing the shutter to the frame etc., complete for finished item of work. (The vertical frame of door shall be embedded in flooring for depth of not less than 10mm) complete for finished item of work.
4.2
3755
15773.73
... More
Renovation of Ladies Toilets in Cellar;Ornamental Plastering to Ceiling with 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including , sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., complete for finished item of work.
20
531
10628
... More
Renovation of Ladies Toilets in Cellar;Plastering 25mm thick in two coats with base coat of 21mm thick in CM (1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including , sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., complete for finished item of work.
45
708
31891.5
... More
Renovation of Ladies Toilets in Cellar;Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap,supplying and fixing best quality Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 of 10 litres capacity single flush PVC low level cistern Parryware or equivalent with internal components and CP short bend and fixed using required size of nails and screws, 15mm PVC connections with brass union nuts CP coated and Brass body CP finish stop cock of not less than 300 grams weight with quarter turn spindle including cost and conveyance of all materials to site, etc., complete for finished item of work for all floors.
1
5075
5075
... More
Renovation of Ladies Toilets in Cellar;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams complete with standard CI brackets including wooden block: 660 x 460 mm - Single C.P. Pillar cock including wooden blocks,1 No of 30mm dia. PVC flexible waste pipe 914.4mm length of 1st quality S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 Supplying & Fixing 15 mm nominal size PVC connection with brass union nut C.P coated including cost and conveyance of all materials to site, labour charges, for finished item of work.
2
4428
8856
... More
Renovation of Ladies Toilets in Cellar;Supplying & fixing CI floor / Nahany traps 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice for nominal dia 75 mm (3") and grating size 165 mm dia of weight not less than 5.5 Kgs.
3
599
1797
... More
Renovation of Ladies Toilets in Cellar;Supplying & fixing CI floor traps 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice for nominal dia 75 mm (3") and grating size 165 mm dia of weight not less than 5.5 Kgs.
1
599
599
... More
Renovation of Ladies Toilets in Cellar;Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved make with cement caulked joints and fixing as per site requirements including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of M.S. clamps if necessary with required numbers of Bombay nails etc., complete for 3" dia (75 mm nominal size) Single Socket.
4
843
3372
... More
Renovation of Ladies Toilets in Cellar;S&F Stainless steel 4" dia round Grating with frame for nahany or floor trap cover with or without hole etc., complete for finished item of work.
4
65
260
... More
Renovation of Ladies Toilets in Cellar;S& F 15 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete.
15
206
3090
... More
Renovation of Ladies Toilets in Cellar;S& F 25 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete.
15
301
4515
... More
Renovation of Ladies Toilets in Cellar;S& F 40 mm Nominal Bore GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete.
15
472
7080
... More
Renovation of Ladies Toilets in Cellar;S& F GI union 25 mm nominal size Ist Quality etc., complete for finished item of work.
3
83
249
... More
Renovation of Ladies Toilets in Cellar;S& F GI union 40 mm nominal size Ist Quality etc., complete for finished item of work.
3
123
369
... More
Renovation of Ladies Toilets in Cellar;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 25 mm NB Size etc., complete for finished item of work.
1
1254
1254
... More
Renovation of Ladies Toilets in Cellar;S & F Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 40 mm NB Size etc., complete for finished item of work.
1
2572
2572
... More
Renovation of Ladies Toilets in Cellar;Plain Cement Concrete (1:3:6) Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal of 20mm, 13.20/12.50mm,10mm and 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including , sales & other taxes on all materials and labour charges for mixing, laying concrete in position, curing etc., including for Bed Blocks finished item of work.
0.1
6064
606.4
... More
Renovation of Ladies Toilets in Cellar;RCC M- 20 Nominal mix (Cement:fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size gradedmachine crushed hard granite metal (coarseaggregate) from approved quarry includingcost and conveyance of all materials likecement, fine aggregate (sand) coarseaggregate, water etc., to site and including, sales & other taxes onall materials including all operational,incidental and labour charges such asmachine mixing, laying concrete, curingetc.,complete but including cost of steel andits fabrication charges for finished item ofwork, but including centering, shuttering including cost and conveyance of all matearils and labour charges etc., complete for finished item of work.
0.1
12004
1200.47
... More
Renovation of Ladies Toilets in Cellar;Supplying, fitting and placing thermo Mechanically Treated (TMT) Fe- 500 / 500D / 550 D Steel as per IS 1786-1979 manufactured by Primary producers like TATA, SAIL, VSP, JSW, Jindal and Shyam Steel as approved by Ministry of steel guidelines) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars to site, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying on all materials etc. ,and cost of etc., complete for finished item of work.
30
76
2283.9
... More
Renovation of Ladies Toilets in Cellar;Painting to New walls with 2 coats Acrylic based Oil Bound washable Distemper ( Asian / Berger / Nerolac / Saicoat / Indocem ) over a base coat of water based cement primer of interior Grade -1 (Asian / Berger / Nerolac / Saicoat / Indocem) as approved by Engineer-In-Charge, MAKING 3 COATS in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges and etc., complete for finished item of work as per for internal walls.
75
131
9877.5
... More
Renovation of Ladies Toilets in Cellar;Flooring with Non-skid full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (including cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost for finished item of work.
20
590
11800
... More
Renovation of Ladies Toilets in Cellar;Providing Dadooing to walls with Digital / polished glazed full body porcelain wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs (Decorated Coloured Background) as approved by Engineer-in-Charge set over base coat of CM (1:5) prop, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge.
45
1012
45553.5
... More
Renovation of Ladies Toilets in Cellar;Painting to New Wood Work and Flush Shutters, over a primary coat ( Asian / Berger / Nerolac / Saicoat / Indocem) and painting 2 coats of Ready mixed Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound ) content less than 50 grams/ Lit. (Asian/ Berger/ Nerolac/ Indocem) over a Wood primer coat MAKING 3 COATS of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper for neat finish coats for neat finish including sales & other taxes on cost of all materials including etc., complete
20
190
3800
... More
Renovation of Ladies Toilets in Cellar;Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm etc., complete for finished item of work.
2
522
1044
... More
Renovation of Ladies Toilets in Cellar;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded conenction conforming to IS 8931 etc., complete for finished item of work.
3
609
1827
... More
Renovation of Ladies Toilets in Cellar;S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931 etc., complete for finished item of work.etc., complete for finished item of work.
4
619
2476
... More
Renovation of Ladies Toilets in Cellar;Removing of Water Closet's (WC's) as directed by the Departmental officers etc., complete for finished item of work.
3
140
420
... More
Renovation of Ladies Toilets in Cellar;Removing of Flush tank as directed by the Departmental officers etc., including labour charges etc., complete for finished item of work.
3
125
375
... More
Renovation of Ladies Toilets in Cellar;Dismantling of glazed tiles including removal old base coat of plastering till to exposed of Brick Masonry as directed by the Departmental officers including labour charges etc., complete for finshed item of work for all floors.
40
98
3920
... More
Renovation of Ladies Toilets in Cellar;Removing of GI Pipe of 25mm dia as directed by the Departmental officers etc., complete for finished item of work.
10
63
635
... More
Renovation of Ladies Toilets in Cellar;Removing of GI Pipe of 15mm dia as directed by the Departmental officers etc., complete for finished item of work.
15
38
577.5
... More
Renovation of Ladies Toilets in Cellar;Plastering in Single coats of 20mm thick in CM (1:4) Prop including cost and conveyance of all materials like cement, sand, water etc., to site, including , sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., complete for finished item of work.
50
332
16605
... More
Renovation of Ladies Toilets in Cellar;Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved make with cement caulked joints and fixing as per site requirements including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of Bombay nails etc., complete for 4" dia (101.6mm) Single Socket.
20
1107
22140
... More
Renovation of Ladies Toilets in Cellar;Supplying and fixing 100 mm dia Single Branch Plain "T" - CI (Spun) fittings including all labour charges etc., complete for finished item of work.
6
725
4350
... More
Renovation of Ladies Toilets in Cellar;Supplying and fixing 100 mm dia Single Branch Door "T" - CI (Spun) fittings including all labour charges etc., complete for finished item of work.
3
842
2526
... More
Renovation of Ladies Toilets in Cellar;Supplying & fixing CI Plain bends Ist quality ISI marked conforming to IS:1729-1979 with cement caulked joints and fixing as per site requirements with standard practice for 4" dia (101.6 mm) etc., complete for finished item of work.
3
417
1251
... More
Renovation of Ladies Toilets in Cellar;Supplying and fixing 2" dia PVC pipe including all labour charges and materails charges etc., complete for finished item of work
5
150
750
... More
Renovation of Ladies Toilets in Cellar;Removing and refixing the door frame and shutters in position to the plumb duly repearing including fixing 6 No's of Hold fasts of 9" x 2" x 1/4" in Plain Cement Concrete, Supplying and fixing M.S. powder coated hinges 3 No's of 4" long to each shutter including the door and strengthening the door etc., including cost and conveyance of all materails and labour charges etc., complete for finished item of work.
4
1476
5905.92
... More
Renovation of Ladies Toilets in Cellar;Supplying and fixing 580mm x 440mm long Orissa Pan White Glazed Water Closet 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick - ISI mark and providing masonry seat, 10 litres capacity Single Flush PVC Low Level Cistern Parryware or equivalent with internal components fixed on 2 Nos. of teak wood blocks of size 76.20mm x 101.60mm using required size of nails, screws as approved by Engineer-in-charge, CP long bend, 15mm PVC connection with brass union nut CP coated, 31.75mm brass plumber union, Brass body CP finish Stop cock Tap of not less than 300 grams weight with quarter turn spindle, P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges, etc., complete for finished item of work.
2
4298
8596
... More
Renovation of Ladies Toilets in Cellar;S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook etc., complete for finished item of work.
1
3266
3266
... More
Renovation of Ladies Toilets in Cellar;Supply & fixing 30 mm nominal sizedia PVC flexible waste pipe of 914.4 mm length of Ist quality etc., complete for finished item of work.
4
29
116
... More
Renovation of Ladies Toilets in Cellar;Supplying and fixing Aluminium Flat Latches: 250 mm long including all labour charges and materails charges etc., complete for finished item of work.
3
111
333
... More
Renovation of Ladies Toilets in Cellar;Supplying and fixing Aluminium Door Handles (IS:208) 125 mm Long including all labour charges and materails charges etc., complete for finished item of work.
6
78
468
... More
Renovation of Ladies Toilets in Cellar;Supplying and fixing Aluminium Aldrop (IS:2681) 250 mm longincluding all labour charges and materails charges etc., complete for finished item of work.
2
202
404
... More
Renovation of Ladies Toilets in Cellar;Supplying and fixing Aluminium Tower Bolt-10 mm Bolt (IS:204) 150 mm Long including all labour charges and materails charges etc., complete for finished item of work.
3
115
345
... More
Renovation of Ladies Toilets in Cellar;Carting of unuseful debris 150.00 mts from toilet to out side building by manual means and carting by mechanical means 2 kms from building to inside campus including labour charges, machinery, loading, unloading charges etc,
40
261
10466.4
... More
Renovation of Ladies Toilets in Cellar;Construction of Brick masonry for Panel walls 230mm thick in superstructure with CM (1:8) prop: (Cement : Sand) using Second Class Bricks of size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including , sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work.
3
7199
21598.2
... More
Renovation of Ladies Toilets in Cellar;Application of Grey Lappam Putty to Wooden Doors in 2 or more coats to get the even shade after thourughly sand papering & brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges, including etc., for finished item of work
20
135
2718