Osmania University Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 1,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
515138Bid Award Id
ViewTender No
2912/EE/UBD/2024, Dt:18.05.2024Tender Authority
Osmania University ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing repair and maintenance for CHW III;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge including etc., complete for finished item of work. For Ceiling Plastering.
26
549
14279.2
Providing repair and maintenance for CHW III;Supplying and fixing 15mm of PVC Taps including labour charges etc., complete for finished item of work.
12
88
1056
Providing repair and maintenance for CHW III;S&F premium make CPVC Pipes of 22.20mm OD Pipe- SDR 13.5 etc., complete for finished item of work.
20
164
3280
Providing repair and maintenance for CHW III;Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-2- 2004 of white glazed with 'P' trap etc., complete for finished item of work.
1
11075
11075
Providing repair and maintenance for CHW III;Supplying & fixing approved make Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3- 2004 with "P" or "S" trap: 580 mm x 440 mm etc., complete for finished item of work.
3
2018
6054
Providing repair and maintenance for CHW III;Flooring with Non-skid full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of finished item of work.
43
607
26109.6
Providing repair and maintenance for CHW III;Plain Cement Concrete (1:2:4) (M20) Grade Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing & lift charges including etc., for finished item of work.
2.5
7410
18526.35
Providing repair and maintenance for CHW III;Providing impervious coat to exposed RCC Roof Slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab including etc., complete for finished item of work.
9
617
5561.1
Providing repair and maintenance for CHW III;Providing and laying Cinder Concrete in Cement, Cinder Mix (1:15) Prop. (Cement : Cinder) using 12.5mm nominal size cinder laid in layers and compacted as directed by Engineer-in-charge for filling in sunken floors including cost and conveyance of all materials , water to work site , seigniorage charges and all operational , incidental , labour charges , such as mixing cement & cinder etc., including etc., complete for finished item of work.
2
3197
6394.8
Providing repair and maintenance for CHW III;Supplying and fixing of 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings etc., complete for finished item of work.
5
174
870
Providing repair and maintenance for CHW III;For 75mm dia
15
228
3420
Providing repair and maintenance for CHW III;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, complete for finished item of work at all floor levels. b) For 110 mm dia
16
339
5436.8
Providing repair and maintenance for CHW III;Applying SBR Roof Bond for Bonding with old concrete and new concrete and bonding coat with paint of SBR Roof Bond Coat Chemical with one part of Cement and apply the Chemical with Brush including cost and conveyance of all materials etc., complete for finished item of work.
48
95
4591.2
Providing repair and maintenance for CHW III;Dismantling the Old cement mortar plaster and clearing debries from the site as per Engineer-incharge etc., complete for finished item of work.
46
7
322
Providing repair and maintenance for CHW III;Dismantling the Cinder Concrete or Cement Concrete in Toilets and clearing debries from the site as per Engineer-incharge etc., complete for finished item of work.
3
1673
5021.4
Providing repair and maintenance for CHW III;Dismantling the old tiles in Toilets and clearing debries from the site as per Engineer-incharge etc., complete for finished item of work.
43
98
4214
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements