Osmania University Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Osmania University Tender

Works
Civil And Construction
Building Construction
Opening Date28 Feb 2025
Closing Soon17 Mar 2025
Tender Amount₹ 7,41,870 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Renovation of Bathrooms Ground Floor and First Floor;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3prop;½?thick both insideand outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification etc., complete for finished item of work.

2

8688

17376

... More
Renovation of Bathrooms Ground Floor and First Floor;Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with watering and tamping etc., complete for finished item of work.

12

513

6156

... More
Renovation of Bathrooms Ground Floor and First Floor;Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0")) depth and refilling with watering and tamping etc., complete for finished item of work.

45

763

34335

... More
Renovation of Bathrooms Ground Floor and First Floor;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg etc., complete for finished item of work.

5

4610

23050

... More
Renovation of Bathrooms Ground Floor and First Floor;Painting 2 coats with Ready mixed Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound ) content less than 50 grams/ Lit. ( Asian / Berger / Nerolac / Indocem ) to Old Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges including etc., complete for finished item of work.

2

122

244.2

... More
Renovation of Bathrooms Ground Floor and First Floor;Painting 2 coats with Ready mixed Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound ) content less than 50 grams/ Lit. ( Asian / Berger / Nerolac / Indocem ) to Old Wood Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges including etc., complete for finished item of work.

7

136

956.2

... More
Renovation of Bathrooms Ground Floor and First Floor;S&F of 15 mm brass body premium variety Chromium Plated finish two-way bib tap with flange of not less than 500 grams weight with quarter turn spindle internal/ external threaded connection conforming to IS 8931 and with 10 years warranty etc., complete for finished item of work.

8

1207

9656

... More
Renovation of Bathrooms Ground Floor and First Floor;S&F of 15 mm brass body premium variety Chromium Plated finish bib tap angular shape with wall flange of not less than 500 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931 and with 10 years warranty etc., complete for finished item of work.

16

1315

21040

... More
Renovation of Bathrooms Ground Floor and First Floor;Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm etc., complete for finished item of work including labour charges & material charges.

4

564

2256

... More
Renovation of Bathrooms Ground Floor and First Floor;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:29631979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cockincluding wooden blocks,1 No of 30mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges, for finished item of work.

8

2337

18696

... More
Renovation of Bathrooms Ground Floor and First Floor;S&F premium make CPVC Pipes of 22.20mm OD Pipe - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge etc., complete for finished item of work ashirvad flow guard plus

23

313

7199

... More
Renovation of Bathrooms Ground Floor and First Floor;S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge etc., complete for finished item of work

36

410

14760

... More
Renovation of Bathrooms Ground Floor and First Floor;Painting to Old walls with 2 coats Acrylic based Oil Bound washable Distemper ( Asian / Berger / Nerolac / Saicoat / Indocem ) over a base coat of water based cement primer of interior Grade -1 (Asian / Berger / Nerolac / Saicoat / Indocem) as approved by Engineer-In-Charge, MAKING 3 COATS in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges and etc., complete for finished item of work for internal walls.

65

147

9594

... More
Renovation of Bathrooms Ground Floor and First Floor;First Floor

60

1038

62304

... More
Renovation of Bathrooms Ground Floor and First Floor;Providing dadooing to walls with glazed full body porcelain wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge set over base coat of CM (1:5) prop, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. Ground Floor

60

1029

61764

... More
Renovation of Bathrooms Ground Floor and First Floor;First Floor

18

628

11311.2

... More
Renovation of Bathrooms Ground Floor and First Floor;Flooring with Non-skid full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of for finished item of work. Ground Floor

18

609

10971

... More
Renovation of Bathrooms Ground Floor and First Floor;Supplying and fixing of 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings etc., complete for finished item of work.

10

171

1710

... More
Renovation of Bathrooms Ground Floor and First Floor;Supplying and fixing of 3" (75 mm nominal size ) Nahany Trap with Jali -UPVC/SWR Pipe fittings etc., complete for finished item of work

12

122

1464

... More
Renovation of Bathrooms Ground Floor and First Floor;b) For 110mm dia per

75

370

27787.5

... More
Renovation of Bathrooms Ground Floor and First Floor;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, complete for finished item of work at all floor levels. a) For 75mm dia

36

250

9010.8

... More
Renovation of Bathrooms Ground Floor and First Floor;First Floor

10

628

6284

... More
Renovation of Bathrooms Ground Floor and First Floor;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., complete for finished item of work GF.

8

594

4758.24

... More
Renovation of Bathrooms Ground Floor and First Floor;First Floor

11

591

6503.97

... More
Renovation of Bathrooms Ground Floor and First Floor;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., complete for finished item of work. For Walls Plastering GF.

11

557

6134.15

... More
Renovation of Bathrooms Ground Floor and First Floor;First Floor

0.1

5934

593.49

... More
Renovation of Bathrooms Ground Floor and First Floor;Plain Cement Concrete (1:3:6) Nominal mix (Cement: Fine Aggregate (unscreen sand) : Coarse Aggregate (Metal) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal of 20mm, 13.20/12.50mm,10mm and 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, sales & other taxes on all materials and labour charges for mixing, laying concrete in position, curing etc., complete for finished item of work - BED BLOCK GF

0.1

5853

585.3

... More
Renovation of Bathrooms Ground Floor and First Floor;Supply and fixing doors as per drawings with WPC door frame of section 100mm x65mm of Aerofit make ISI of 28/30 mm thick single shutter WPC (wood polymer composite)shutter, comprisity of 70% virgin polymore 15% wood powder (fiber) and the remainging 15 additives comprising of virgin PVC Polymner of K value 58 to 60 calsium carbonate and naturals fibres and non toxic adhesive of KAKA Make the door shutters and frame shall be water resistant, fire resistant and termite resistant with tesile strengh not less than 170kg sq/cm and the door shutters and frame surface finished delo paint etc., including supply and fixing 6 no's, MS Z hold fast-150mm long of 40x40x5mm, 3 no's stain less steel, butt hinges 125mm long, and required full body threaded star screws 1 no alluminium aldrop 250mm long , 2no's alluminium tower bolts 200mm long, 2 no's alluminium handles 150mm long, including cost and convayance all materials to site, labour charges for fixing the frame in position, fixtures , fixing the shutter to the frame etc., complete for finished item of work for all floors.

16

6059

96948

... More
Renovation of Bathrooms Ground Floor and First Floor;First Floor

1

6506

6506.69

... More
Renovation of Bathrooms Ground Floor and First Floor;Plain Cement Concrete (1:2:4) (M20) Grade Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing & lift charges etc., for finished item of work.

1.5

6424

9637.24

... More
Renovation of Bathrooms Ground Floor and First Floor;Providing and applying Acrylic Based Adhesive bonding coats with BRUSH BOND RFX of FOSROCK make applying two coats with brushes to cover the surface uniformly before placing the screde concrete as per the manufactures specifcation, including sales and other taxes including cost and conveyance of all materials, labour charges, incidental and operational chrages, transporation charges and etc., complete for finished item of work.

36

298

10742.4

... More
Renovation of Bathrooms Ground Floor and First Floor;Dismantling doors, Windows & clear storey windows, ventilators etc., (wood or Steel) shutters including chowkhats, architraves, holdfasts and other attachments including etc., complete & stacking them within 100 mt lead

10

276

2762

... More
Renovation of Bathrooms Ground Floor and First Floor;Dismantling, clearing away debries carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges , etc., complete Terrazo flooring / Glazed tiles for finished item of work.

124

152

18922.4



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.