Osmania University Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
490749Bid Award Id
ViewTender No
1939/EE/UBD/2023, Dated:11.01.2024Tender Authority
Osmania University ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing Concertina Coil fencing over compound wall;Painting 2 coats with Ready mixed Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound ) content less than 50 grams/ Lit ( Asian / Berger / Nerolac / Indocem ) to New Iron including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work.
15
114
1719
Providing Concertina Coil fencing over compound wall;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., complete for finished item of work .
2
551
1102
Providing Concertina Coil fencing over compound wall;Supply and fixing concertina coils of 1'-6" using 2.5mm wire 8 Nos. reinforced barbed tape (RBT) wire coil 600mm dia with 90 GSM 2.5mm to 3mm dia wire with 10mm blade size as per approved design & drawing fixing to the existing MS angular frame and tied with GI wire straight at 8 holes in angular frame, coils at 3 contact places to cutting & jointing with binding wire to the required size and shape, transportation to the site incidental and operational charges etc., complete for finished item of work.
230
588
135309
Providing Concertina Coil fencing over compound wall;Plain Cement Concrete (1:2:4) (M20) Grade Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including, sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing & lift charges including etc., for finished item of work.
0.2
6243
1248.6
Providing Concertina Coil fencing over compound wall;Dismantling Old Brick masonry for Bed Blocks MS 'L' angles clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge etc., complete.
0.2
280
56.12
Providing Concertina Coil fencing over compound wall;Supplying,fabrication and fixing of size MS 'L' angles 40x40x5mm thickness and 'U' shape Brackets for fixing including cutting of required length and duly drilling holes and fixing with Nuts and bolts at 0.3 mc/c including one coat of Red oxide paint including cost and conveyance of all materilas, labour charges, incidental and operational charges transportation to site complete for finished item of work.
93
560
52145.1