Osmania University Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Osmania University Tender

Works
Civil And Construction
Building Construction
Opening Date24 Aug 2023
Closing Date31 Aug 2023
Tender Amount₹ 7,36,165 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Renovation of Gents Toilet First Floor (Room No.147);ii) Kadapa slabs or shahabad stone slabs on sand bed - b) First Floor middle facing (Room No. 147).

45

9

405

... More
Renovation of Gents Toilet First Floor (Room No.147);iii) Old lime mortar plaster b) First Floor middle facing (Room No. 147)

150

6

900

... More
Renovation of Gents Toilet First Floor (Room No.147);Dismantling doors, Windows & clear storey windows, ventilators etc., (wood or Steel) shutters including chowkhats, architraves, holdfasts and other attachments etc., complete & stacking them within 100 mt lead up to 3.33 Sqm. b) First Floor middle facing (Room No. 147) (All the items shall be handed over to the department)

6

331

1991.4

... More
Renovation of Gents Toilet First Floor (Room No.147);Removing of Flush tank as directed by the Departmental officers etc., including labour charges etc., complete for finished item of work. b) First Floor middle facing (Room No. 147) - (All the items shall be handed over to the department).

8

125

1000

... More
Renovation of Gents Toilet First Floor (Room No.147);Removing Urinal Partitions of size 2'-0" x 4'-0" as directed by the Departmental officers etc., including labour charges etc., complete for finished item of work - b) First Floor middle facing (Room No. 147)

3.5

9

31.5

... More
Renovation of Gents Toilet First Floor (Room No.147);Removing of CI pipe of 3" & 4" dia as directed by the Departmental officers etc., complete for finished item of work. b) First Floor middle facing (Room No. 147).

20

45

900

... More
Renovation of Gents Toilet First Floor (Room No.147);Removing of GI Pipe of 15mm dia as directed by the Departmental officers etc., complete for finished item of work. b) First Floor middle facing (Room No. 147)

12

77

924

... More
Renovation of Gents Toilet First Floor (Room No.147);Removing of GI Pipe of 25mm dia as directed by the Departmental officers etc., complete for finished item of work. b) First Floor middle facing (Room No. 147).

25

88

2200

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying & fixing CI floor / Nahany traps 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice for nominal dia 75 mm (3") and grating size 165 mm dia of weight not less than 5.5 Kgs b) First Floor middle facing (Room No. 147)

6

599

3594

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying & fixing CI floor traps 1st quality ISI marked with C.P. Grating fixing with white cement as per site requirements with standard practice for nominal dia 100 mm (4") and grating size 100 mm dia of weight not less than 6 Kgs - b) First Floor middle facing (Room No. 147)

2

732

1464

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved make with cement caulked joints and fixing as per site requirements including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of Bombay nails etc., complete for 3" dia (75 mm nominal size) Double Socket b) First Floor middle facing (Room No. 147).

5

921

4605

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying & fixing CI Plug (Door) bends Ist quality ISI marked conforming to IS:1729-1979 with cement caulked joints and fixing as per site requirements with standard practice for 3" dia (75 mm nominal size) b) First Floor middle facing (Room No. 147)

2

407

814

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying & fixing CI Plain bends Ist quality ISI marked conforming to IS:1729-1979 with cement caulked joints and fixing as per site requirements with standard practice for 3" dia (75 mm nominal size) b) First Floor middle facing (Room No. 147)

6

328

1968

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and fixing of C.I. soil pipes ISI marked conforming to IS:1729-1979 of approved make with cement caulked joints and fixing as per site requirements including painting black with Japan paint and fixing with necessary wooden blocks fixed in the masonry walls in cement mortar (1½:1) including fixing of M.S. clamps if necessary with required no. of Bombay nails etc., complete for 4" dia (101.6mm) Double Socket. b) First Floor middle facing (Room No. 147).

15

1229

18435

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and Fixing of 101.6 mm (4") CI soil Double junction with plug : conforming to IS:1729-1979 with cement caulked joints and fixing. b) First Floor middle facing (Room No. 147).

2

948

1896

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying & fixing CI Plain bends Ist quality ISI marked conforming to IS:1729-1979 with cement caulked joints and fixing as per site requirements with standard practice for 4" dia (101.6 mm). b) First Floor middle facing (Room No. 147).

4

417

1668

... More
Renovation of Gents Toilet First Floor (Room No.147);S&F premium make CPVC Pipes of 15.90mm OD Pipe - SDR 11. b) First Floor middle facing (Room No. 147).

15

159

2385

... More
Renovation of Gents Toilet First Floor (Room No.147);S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 11. b) First Floor middle facing (Room No. 147).

35

231

8085

... More
Renovation of Gents Toilet First Floor (Room No.147);Plain Cement Concrete (1:2:4) (M20) Grade Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing etc., & lift charges, for finished item of work for Fist floor. b) First Floor middle facing (Room No. 147)

3.5

7265

25427.5

... More
Renovation of Gents Toilet First Floor (Room No.147);Brick masonry for Panel walls 230mm thick in superstructure with CM (1:8) prop: (Cement : Sand) using Second Class Bricks of size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., complete for finished item of work. b) First Floor middle facing (Room No. 147) for second floor.

3

7199

21598.2

... More
Renovation of Gents Toilet First Floor (Room No.147);Plastering in Single coats of 20mm thick in CM (1:6) Prop including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge and Overheads & Contractors Profit etc., complete for finished item of work. (SS 901,903 & 904).(SS 901,903 & 904) (BLD-CSTN-8-8) First Floor Tile base coat. b) First Floor middle facing (Room No. 147)

280

303

85008

... More
Renovation of Gents Toilet First Floor (Room No.147);Ornamental Plastering to Ceiling with 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., complete for finished item of work. b) First Floor middle facing (Room No. 147)

40

531

21256

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and fixing of 16mm to 20 mm thick Polished Granite Slab Partition for Urinal of size 4' 0" x 2' 0" including full rounding the edges, fixing in position, polishing, cutting and machinery charges, labour charges, including cost and conveyance of all materials and labour charges, complete for finished item of work for all floors. b) First Floor middle facing (Room No. 147)

3

4559

13677.45

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and fixing approved make wash down European Water Closet of 1st quality conforming to IS:2556-Part-22004 of white glazed with 'S' trap including Supplying and Fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996. b) First Floor middle facing (Room No. 147).

4

3115

12460

... More
Renovation of Gents Toilet First Floor (Room No.147);Supply & fixing of PVC low level system with internal components & short bend: 10 Litres capacity Single Flush. b) First Floor middle facing (Room No. 147).

4

1613

6452

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and fixing of 101.60mm x 609.60mm white glazed porcelain channels 1st quality fixed in brick masonry to the required slopes , white cement pointing including cost and conveyance of all materials and labour charges , complete for finished item of work for all floors. b) First Floor middle facing (Room No. 147).

13

838

10898.29

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and fixing CI Grating of 150mm wide over a porcelian channel (under channel) inclduing cost and conveyance of all materials and labour charges etc., complete for finished item of work. b) First Floor middle facing (Room No. 147)

5

1466

7333.25

... More
Renovation of Gents Toilet First Floor (Room No.147);S&F of Chromium plated finish brass body quarter turn Bibcock cum Health Faucet with 1m long tube and wall hook with 10 years warranty. b) First Floor middle facing (Room No. 147).

3

3266

9798

... More
Renovation of Gents Toilet First Floor (Room No.147);Supply & fixing 30 mm nominal sizedia PVC flexible waste pipe of 914.4 mm length of Ist quality. b) First Floor middle facing (Room No. 147).

12

29

348

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying & Fixing 15 mm nominal size PVC connection with brass union nut C.P coated. b) First Floor middle facing (Room No. 147).

16

114

1824

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and fixing 580mm x 440mm long Orissa Pan White Glazed Water Closet 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick - ISI mark and providing masonry seat, 10 litres capacity Single Flush PVC Low Level Cistern Parryware or equivalent with internal components fixed on 2 Nos. of teak wood blocks of size 76.20mm x 101.60mm using required size of nails, screws as approved by Engineer-in-charge, CP long bend, 15mm PVC connection with brass union nut CP coated, 31.75mm brass plumber union, Brass body CP finish Bib Tap of not less than 300 grams weight with quarter turn spindle, P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges, etc., complete for finished item of work. b) First Floor middle facing (Room No. 147)

2

4298

8596

... More
Renovation of Gents Toilet First Floor (Room No.147);S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931. b) First Floor middle facing (Room No. 147).

16

619

9904

... More
Renovation of Gents Toilet First Floor (Room No.147);S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded conenction conforming to IS 8931. b) First Floor middle facing (Room No. 147).

4

609

2436

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and fixing CP Urinal inlet pipe up to 450 mm long cost and conveyance of all materailsf and labour charges etc., complete for finished item of work. b) First Floor middle facing (Room No. 147)

6

300

1800

... More
Renovation of Gents Toilet First Floor (Room No.147);Flooring with Non-skid full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete for finished item of work. b) First Floor middle facing (Room No. 147)

40

590

23600

... More
Renovation of Gents Toilet First Floor (Room No.147);Providing and applying Acrylic Based Adhesive bonding coats with BRUSH BOND RFX of FOSROCK make applying two coats with brushes to cover the surface uniformly before placing the screde concrete as per the manufactures specifcation, including sales and other taxes including cost and conveyance of all materials, labour charges, incidental and operational chrages, transporation charges and including etc., complete for finished item of work. b) First Floor middle facing (Room No. 147)

60

256

15384

... More
Renovation of Gents Toilet First Floor (Room No.147);Painting to New walls with 2 coats Acrylic based Oil Bound washable Distemper ( Asian / Berger / Nerolac / Saicoat / Indocem ) over a base coat of water based cement primer of interior Grade -1 (Asian / Berger / Nerolac / Saicoat / Indocem) as approved by Engineer-In-Charge, MAKING 3 COATS in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work as per for internal walls. b) First Floor middle facing (Room No. 147)

200

131

26340

... More
Renovation of Gents Toilet First Floor (Room No.147);Painting to New Wood Work and Flush Shutters, over a primary coat ( Asian / Berger / Nerolac / Saicoat / Indocem) and painting 2 coats of Ready mixed Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound ) content less than 50 grams/ Lit. (Asian/ Berger/ Nerolac/ Indocem) over a Wood primer coat MAKING 3 COATS of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper for neat finish coats for neat finish including sales & other taxes on cost of all materials etc., complete in all floors. b) First Floor middle facing (Room No. 147)

55

190

10450

... More
Renovation of Gents Toilet First Floor (Room No.147);Application of Grey Lappam Putty to Wooden Doors in 2 or more coats to get the even shade after thourughly sand papering & brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., for finished item of work. b) First Floor middle facing (Room No. 147)

25

135

3397.5

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and Fixing Aluminium Aldrop (IS:2681) 300 mm long including all labour charges and materials charges etc., complete for finished item of work - b) First Floor middle facing (Room No. 147).

2

221

442

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and Fixing Aluminium Aldrop (IS:2681) 250 mm long including all labour charges and materials charges etc., complete for finished item of work - b) First Floor middle facing (Room No. 147).

6

202

1212

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying ad Fixing Aluminium Tower Bolt-10 mm Bolt (IS:204) 300 mm Long including all labour charges and materials charges etc., complete for finished item of work. b) First Floor middle facing (Room No. 147).

6

115

690

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and fixing Aluminium Door Handles (IS:208) 150 mm Long including all labour charges and materials charges etc., complete for finished item of work b) First Floor middle facing (Room No. 147).

12

92

1104

... More
Renovation of Gents Toilet First Floor (Room No.147);Reinforced Brick Masonry for Partition walls (11.0 CM Thick) in CM (1:4) prop. (Cement : Sand) using second class bricks of size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sq.cm and placing 2 nos of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges such as labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., but excluding cost of steel and its fabrication charges complete for finished item of work. b) First Floor middle facing (Room No. 147)

35

893

31265.5

... More
Renovation of Gents Toilet First Floor (Room No.147);Reinforced Cement Concrete M 20 (1: 1 1/2 : 3) prop. Nominal Mix ( Concrete mixer) using 12mm size (SS5) hard granite machine crushed graded metal (Coarse aggregate) ( consisting of nominal size metal 60% of 13.20/12.50mm , 20% of 10mm and 20% of 6mm ) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering, shuttering, machine mixing, laying concrete, vibrating,lift charges, curing including etc., complete for finished item of work but excluding the cost of steel and its fabrication charges for Sill Slabs, Platforms & Shelves - 50mm thick platforms. b) First Floor middle facing (Room No. 147)

3.5

445

1557.5

... More
Renovation of Gents Toilet First Floor (Room No.147);Flooring with 16 to 18 mm thick high polished granite stone slabs black colour as approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:8), 12mm thick over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, dresssing , polishing charges and seigniorage charges and all other taxes on all materials, cost of base coat and overheads & contractors profit complete for finished item of Work for Platforms b) First Floor middle facing (Room No. 147)

4.5

3527

15871.5

... More
Renovation of Gents Toilet First Floor (Room No.147);Half Rounding the edges of Marble/ Granite stone slabs of all thicknesses including polishing the same. b) First Floor middle facing (Room No. 147).

10

407

4070

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying & fixing Oval Shape Basin White (520x410mm) parry or equivalent (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 complete with standard CI brackets including wooden blocks,1 No.15mm PVC connection with brass union nuts CP coated, 1 No 30 mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cutting granite in oval shape cost and conveyance of all materials to site, labour charges, for finished item of work. b) First Floor middle facing (Room No. 147)

6

3151

18906

... More
Renovation of Gents Toilet First Floor (Room No.147);S&F of 15 mm brass body premium variety Chromium Plated finish bib tap with wall flange of not less than 500 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931 and with 10 years warranty. b) First Floor middle facing (Room No. 147).

6

865

5190

... More
Renovation of Gents Toilet First Floor (Room No.147);Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational charges , sales and other taxes on all materials etc., complete for finished item of work in all floors. b) First Floor middle facing (Room No. 147)

60

76

4568.4

... More
Renovation of Gents Toilet First Floor (Room No.147);Removing 25 mm nominal size GI pipe. b) First Floor middle facing (Room No. 147).

40

127

5080

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and fixing of SWR PVC pipes (Prince/Sudhakar) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, complete for finished item of work at all floor levels. - For 75mm dia. b) First Floor middle facing (Room No. 147)

5

228

1140

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and fixing White Glazed Flat Back Half stall Urinal of "MAGNUM" 1st quality confirming to IS with standard CP Spreader of 95 x 95 x 57mm fixed with screws brackets etc., including all materails charges, labour charges, transporation to site, incidental and operational charges etc., complete for finished item of work. b) First Floor middle facing (Room No. 147)

6

6600

39600

... More
Renovation of Gents Toilet First Floor (Room No.147);Providing Dadooing to walls with Digital / polished glazed full body porcelain wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs (Decorated Coloured Background) as approved by Engineer-in-Charge set over base coat of CM (1:5) prop, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. b) First Floor middle facing (Room No. 147)

175

1012

177152.5

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and fixing 100 mm dia Single Branch Plain "T" - CI (Spun) fittings including all labour charges etc., complete for finished item of work. b) First Floor middle facing (Room No. 147).

4

725

2900

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and fixing 75 mm dia Single Branch Plain "T" - CI (Spun) fittings including all labour charges etc., complete for finished item of work. b) First Floor middle facing (Room No. 147).

4

538

2152

... More
Renovation of Gents Toilet First Floor (Room No.147);Supply & applying Melamine Polish Glossy/ Matt finish to the wood works duly cleaning the surface and applying emery paper, Sand the wood with 180 No., emery paper and then with 320 No., emery paper, clean & wipe off loose dust, applying suitable knifing paste filler / wood filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper, apply two component wood sealer, air dry for 24 hrs, Sand with 320 No emery paper, applying one coat of approved spraying thinner (for spraying)/ applying one coat of approved brushing thinner or general purpose thinner (for brushing) and apply (either with spray or brush) two coats of approved brand melamine including cost & labour charges, emery papers, cost of thinner & melamine polish of approved brands such as Jenson & Nicholson, Asian Paints, Berger Paints or equivalent etc., complete for finished item of work. b) First Floor middle facing (Room No. 147)

11

1200

13207.7

... More
Renovation of Gents Toilet First Floor (Room No.147);Plain Cement Concrete (1:3:6) Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal of 20mm, 13.20/12.50mm,10mm and 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and labour charges for mixing, laying concrete in position, curing etc., for Bed Blocks & Steps finished item of work. (APSS No. 402) (BLD-CSTN-3-2/19) & Amendment in SoR 2014-15) First Floor. b) First Floor middle facing (Room No. 147)

0.6

6064

3638.4

... More
Renovation of Gents Toilet First Floor (Room No.147);Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm. b) First Floor middle facing (Room No. 147).

6

522

3132

... More
Renovation of Gents Toilet First Floor (Room No.147);Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , etc., complete Old lime Concrete Bed below the flooring - (BLD-CSTN-14-8/295)

2.5

836

2092.25

... More
Renovation of Gents Toilet First Floor (Room No.147);Providing impervious coat to exposed RCC Roof Slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including seigniorage charges, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., complete for finished item of work. (APSS No. 901 & 903) ( BLD-CSTN-10-25) & Amendement in SoR 2014-15) - Second Floor

30

588

17649

... More
Renovation of Gents Toilet First Floor (Room No.147);S&F Stainless steel 4" dia round Grating with frame for nahany or floor trap cover with or without hole including labour charges etc complete for finished item of work.

6

65

390

... More
Renovation of Gents Toilet First Floor (Room No.147);S&F of 15 mm brass body CP finish self closing tap push type conforming to IS 1711 labour charges etc complete for finished item of work.

3

275

825

... More
Renovation of Gents Toilet First Floor (Room No.147);S & F Bronze Gate/ Globe valve as per IS - 778 Class - I, Indian make heavy type - 25 mm NB Size labour charges etc complete for finished item of work.

1

1254

1254

... More
Renovation of Gents Toilet First Floor (Room No.147);Providing and laying Cinder Concrete in Cement, Cinder Mix (1:15) Prop. using 12.5mm nominal size cinder laid in layers and compacted as directyed for filling sunken floors including cost and conveyance of all materials , water to work site , seigniorage charges and all operational , incidental , labour charges , such as mixing cement & cinder etc., complete for finished item of work. (APSS. No. 402) (BLD-CSTN-17-10) - Second Floor

2

3318

6636.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.