For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Osmania University Tender

Works
Civil And Construction
Pipe Line Project
Opening Date5 Jun 2024
Closing Date13 Jun 2024
Tender Amount₹ 7,91,073 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing SWG Pipe line from Principal Office;Making drainage connection from a drainage line in to an existing inspection chamber/ manhole including making a hole in to the chambers, placing necessary pipes in the connection and making good the junction in and out of the chambers including cost of necessary cement, sand and aggregate etc.,

3

150

450

... More
Providing SWG Pipe line from Principal Office;Plastering in Single coats of 12mm thick in CM (1:4) Prop including cost and conveyance of all materials like cement, sand, water etc., to site, including, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., complete for finished item of work - For Internal walls.

120

214

25740

... More
Providing SWG Pipe line from Principal Office;Masonry work in CM (1:8) prop (Cement : Screened sand) with Flyash Cement Solid Blocks of size 290mm x 225mm x 140mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs , .Gypsum of 5kgs and stone dust including cost and conveyance of all materials,labour charges, scaffolding and curing etc., complete with a compressive strength not less than 50 kg/sq.cm for walls.

21

6620

139031.34

... More
Providing SWG Pipe line from Principal Office;Plain Cement Concrete (1:5:10) (Cement: Fine Aggregate (unscreen sand) : Coarse Aggregate (Metal) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work.

18

4802

86437.8

... More
Providing SWG Pipe line from Principal Office;Carting the debries with a lead of 10KM by mechanical Means including loading & unloading and all incidental and operational charges, labour charges etc., compete for finished item of work.

230

238

54855

... More
Providing SWG Pipe line from Principal Office;Coursed Rubble stone masonry 2nd sort in CM (1:8) prop: (Cement: Sand) using Hard Granite Stones carted from approved quarry including cost and conveyance of all materials like cement, sand, water, stones etc., from approved quarry, to site and including, sales & other taxes on all materials including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing including etc., complete for finished item of work in basement.

0.5

5427

2713.8

... More
Providing SWG Pipe line from Principal Office;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3 prop ;½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames includingexcavating pits up to a depth of 2440 mm (8'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification

4

20419

81676

... More
Providing SWG Pipe line from Principal Office;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar1:3prop;½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames includingexcavating pits up to a depth of 1524 mm (5'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification

4

12510

50040

... More
Providing SWG Pipe line from Principal Office;Constructing 904.0 mm (3?0?) dia solid block masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using fly-ash blocks of 225 mm thick from approved source having a minimum crushing strength of 10 N/sq.mm including plastering with cement mortar 1:3prop;½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (excluding rock) and laying cement concrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., on all materials and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work as per Standard specification.

3

7826

23478

... More
Providing SWG Pipe line from Principal Office;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges etc., complete Stone masonry in cement mortar.

28

510

14280

... More
Providing SWG Pipe line from Principal Office;Earth work excavation for (Sumps, Ramp, Tanks, pipe line and Open Excavation) and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and complete for finished item of work excluding dewatering charges as per SS 20B in Ordinary Soil-Mannual Means including refilling useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cms thick consolidating each deposit layer with watering and ramming including cost and conveyance of water to work site and all operaitonal, incidental, labour charges, hire charges of T&P etc., complete for finished item of work for (249.7 +50.5)

65

300

19513

... More
Providing SWG Pipe line from Principal Office;Supplying, laying, jointing and testing 152.4 mm SWG SP-1pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in CM 1.5:1 prop. including excavation oftrenches and socket pits in any soil (except rock requiring blasting) up to 1524 mm(5'0") depth and refilling with watering and tamping to the required slope including cost and conveyanance of all materials to site and all labour charges etc., complete for finished item of work.

121

917

110957

... More
Providing SWG Pipe line from Principal Office;Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with air tight cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0")) depth and refilling with watering and tamping to the required slope including cost and conveyanance of all materials to site and all labour charges etc., complete for finished item of work.

50

707

35350



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.