Osmania University Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
510448Bid Award Id
ViewTender No
2134/1/EE/UBD/2024, Dated:13.03.2024Tender Authority
Osmania University ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Shifting of power supply of ECE Department;Earth work excavation of Trench (0.3m x 0.9m) in hard ground soil, laying of U.G cables from 70 sqmm to 400 Sq,mm on sand cushion of 2.0m depth covering the cable with bricks and back filling of Trench duly providing route indicator embedded in C.C including cost and conveyance of materials and labour charges etc., complete.
45
346
15570
Shifting of power supply of ECE Department;Providing independent earthing for Important equipment with 40mm dia 'B' class 2.5m long G.I pipe and 19mm dia 'B' class G.I pipe of 0.3mtr. long connected with reducer providing G.I funnel with mesh enclosed in C.C/ brick masonry chamber of 450m x 450m x 400mm with R.C.C. Slab cover duly providing staggered holes filling with 20Kg Salt and 40Kg Charcoal or 40Kg bentonite powder from the bottom of the pipe giving earth connection from electrode through G.I strip of 40 x 6mm x 200mm length with all accessories and labour charges complete, as per IS specifications 732/1982 (Part II).
2
4863
9726
Shifting of power supply of ECE Department;Providing end termination of LT cable in existing panel board / pole / transformer LT termination box duly encapsulatig all the single core leads of the cable one end with heat shrinkable sleeves and shrinking with LPG gas burner including all material and labour charges etc., complete.
5
1000
5000
Shifting of power supply of ECE Department;Supply and fixing of heavy duty long barrel copper lugs confirming to I.S specifications suitable for 70 sq.mm cable etc complete with nuts, bolts and washers with connections. Makes: DMI / Jainson / Dowels or equivalent make as approved by the department.
1
120
120
Shifting of power supply of ECE Department;Supply and fixing of heavy duty long barrel copper lugs confirming to I.S specifications suitable for 95 sq.mm cable etc complete with nuts, bolts and washers with connections. Makes: DMI / Jainson / Dowels or equivalent make as approved by the department.
2
145
290
Shifting of power supply of ECE Department;Supply and fixing of heavy duty long barrel copper lugs confirming to I.S specifications suitable for 185 sq.mm cable etc complete with nuts, bolts and washers with connections. Makes: DMI / Jainson / Dowels or equivalent make as approved by the department.
6
325
1950
Shifting of power supply of ECE Department;Supply and fixing of heavy duty long barrel copper lugs confirming to I.S specifications suitable for 150 sq.mm cable etc complete with nuts, bolts and washers with connections. Makes: DMI / Jainson / Dowels or equivalent make as approved by the department.
3
240
720
Shifting of power supply of ECE Department;Providing termination of LT cable on LT Pole/Panel board including all labour charges etc., complete.
6
750
4500
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements