Osmania University Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Osmania University Tender

Works
Civil And Construction
Building Construction
Opening Date20 Nov 2023
Closing Date28 Nov 2023
Tender Amount₹ 2,73,398 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg including cost and conveyance all materials & labour charges etc., complete for finished item of work.

1

4273

4273

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Supplying, laying, jointing and testing 101.6 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1:5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0") depth and refilling with watering and tamping.

10

475

4750

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Painting 2 coats with Ready mixed Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound ) content less than 50 grams/ Lit. ( Asian / Berger / Nerolac / Indocem ) to Old Wood Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work.

80

122

9784

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Painting with 2 coats with Acrylic Emulsion paint weather proof water-based, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ Lit.(Asian / Berger / Nerolac) to Exterior Faces of Walls with approved make / shade and colour including cost and conveyance of materials like Acrylic Exterior paint to site including cost of brushes, scaffolding charges, lift charges and labour charges such as preparing the wall and applying two coats of Acrylic Exterior emulsion etc., complete for finished item of work..

230

111

25530

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Painting to Old walls with 2 coats Acrylic based Oil Bound washable Distemper ( Asian / Berger / Nerolac / Saicoat / Indocem ) as approved by Engineer-In-Charge to give an even shade after thourughly brushing the old surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work - Internal walls.

290

102

29812

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;White washing two coats with Suryacem to Walls / Ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., complete for finished item of work

80

43

3464

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Labour charges for wrought and put up including fixing in position for Teak wood Flush type door shutter including frame etc., complete for finished item of work.

4.8

1057

5073.6

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Removing the existing damaged mesh from the windows duly removing the nails and supply and fixing new Stainless Steel Mosquito proof mesh of 20 guage to the existing old frame of windows including supply and fixing of 2" x 1/2" teak wood beading including cost and conveyance of all materails, labour charges, screws / nails including transporation etc., complete for finished item of work

18

1137

20475.36

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Providing 110 mm Dia ISI marked PVC down water take pipes with socket 4kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, PVC Shoes PVC clamps and all other accessories and fixing in position including Cutting holes in Brick masonry & repairs including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site including etc., complete for finished item of work. (APSS No. 1328)

20

310

6217

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;S&F of 15 mm brass angle stop valve of quarter turn spindle type of not less than 400 grams weight with internal threaded conforming to IS 8931- etc complete for finished item of work.

3

619

1857

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;S&F of 15 mm brass body Premium variety Chromium plated finish pillar cock with aerator of not less than 500 grams weight quarter turn spindle conforming to IS 8931 and with a warranty 10 years etc complete for finished item of work.

1

840

840

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931 etc complete for finished item of work.

3

609

1827

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Supply of 15mm PPR Ball Valve conforming to DIN Standards etc complete for finished item of work.

1

186

186

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Supply of 25mm PPR Ball Valve conforming to DIN Standards including labour charges and material charges etc., complete for finished item of work.

1

246

246

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;S&F premium make CPVC Pipes of 15.90mm OD Pipe- SDR 11 including labour charges and material charges etc., complete for finished item of work.

15

159

2385

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;S&F premium make CPVC Pipes of 28.60mm OD Pipe- SDR 11 including labour charges and material charges etc., complete for finished item of work.

20

231

4620

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks.

500

8

4000

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;RCM facia (50mm Finished thick) for Drop walls, Fins with Rabbit Wire Mesh & nominal reinforcement in CM(1:3) prop. of 25mm thick and 12 mm thick plastering in CM (1:5) & (1:3) prop. for 1st and 2nd coats respectively with dubara sponge finishing to all exposed faces, as directred by Engineer-In-Charge , including cost and conveyance of all materials to site, seigniorage charges, sales & othertaxes on all materials, operationals & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc., including Overheads & Contractors Profit etc., complete for finished item of work but excluding cost of steel and its fabrication charges for finished item of work (APSS NO. 403 & 903) (BLD-CSTN-8-11) & Amendement in SoR 2014-15)

1

2768

2768.72

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Providing impervious coat to exposed RCC Roof Slab surface with CM(1:3) prop, 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., complete for finished item of work.

190

588

111777

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Cleaning the W.C with acid and Vim powder etc., complete for finished item of work.

2

53

106

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Dismantling the Old cement mortar plaster as directed by the departmental officer and througing away debries etc. complete for finished item of work.

55

6

330

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) prop and top coat of 4mm thick in CM (1:4) prop with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., complete for finished item of work. Enternal walls Ground floor

20

551

11020

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) prop and top coat of 4mm thick in CM(1:4) prop with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., complete for finished item of work. Internal walls Ground floor

20

551

11020

... More
Providing repairs and maintenance to the Staff Quarter No.L/48;Ornamental Plastering to Ceiling with 12mm thick in two coats with base coat of 8mm thick in CM (1:5) prop and top coat of 4mm thick in CM (1:3) prop with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including , sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., complete for finished item of work.

15

531

7971



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.