Osmania University Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 6,015Document Cost
Refer DocumentsTender Fee
₹ 2,500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
575530Tender No
128/5/EE/UBD/2025, Dt:12.02.2025Tender Authority
Osmania University ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, complete for finished item of work at all floor levels. For 75mm dia
18
250
4505.4
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Supplying and fixing TV shape mirror with plastic frame size 609.6 mm x 457 .2 mm etc., complete for finished item of work.
4
564
2256
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;S&F of 15 mm Stainless steel flexible hose 1.0 m long for hand shower / health faucet with brass nuts etc., complete for finished item of work.
1
281
281
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;S&F of 15 mm brass body premium variety Chromium Plated finish two-way bib tap with flange of not less than 500 grams weight with quarter turn spindle internal/ external threaded connection conforming to IS 8931 and with 10 years warranty.
6
1207
7242
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;S&F of 15 mm brass body CP finish self-closing tap push type conforming to IS 1711 etc., complete for finished item of work.
6
298
1788
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;S&F of 15 mm brass body Premium variety Chromium plated finish pillar cock with aerator of not less than 500 grams weight quarter turn spindle conforming to IS 8931 and with a warranty of 10 years .
6
907
5442
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;S&F of 15 mm brass body premium variety Chromium Plated finish bib tap with wall flange of not less than 500 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931 and with 10 years warranty.
16
934
14944
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Painting 2 coats with Ready mixed Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound ) content less than 50 grams/ Lit. ( Asian / Berger / Nerolac / Indocem ) to Old Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges including etc., complete for finished item of work.
5
122
610.5
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Painting to New walls with 2 coats Acrylic based Oil Bound washable Distemper ( Asian / Berger / Nerolac / Saicoat / Indocem ) over a base coat of water based cement primer of interior Grade -1 (Asian / Berger / Nerolac / Saicoat / Indocem) as approved by Engineer-In-Charge, MAKING 3 COATS in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges and etc., complete for finished item of work for internal walls.
120
147
17712
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:29631979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cockincluding wooden blocks,1 No of 30mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges, for finished item of work.
4
2337
9348
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Supplying and fixing white glazed Flat Back Half Stall Urinals of size 590 mm x 375 mm x 390 mm with integral flushing rim fixed with screws complete Indian make (HSW/Parry/Neycer) conforming to IS:2556-1995 as approved by Engineer-in-charge, including supply and fixing 12.7mm PVC connection with brass plumber union nuts CP coated, 12.70mm push cock 1st quality of approved make , 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, labour charges etc., complete for finished item of work for all floors.
6
4402
26412
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;First Floor
30
1038
31152
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Providing dadooing to walls with glazed full body porcelain wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders as approved by Engineer-in-Charge set over base coat of CM (1:5) prop, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. Ground Floor
30
1029
30882
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;First Floor
20
628
12568
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Flooring with Non-skid full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and cost of for finished item of work. Ground Floor
20
609
12190
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;S&F premium make CPVC Pipes of 22.20mm OD Pipe - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge
11
313
3443
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;S&F premium make CPVC Pipes of 28.60mm OD Pipe - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent cement etc., and labour charges complete including cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge
36
410
14760
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Supplying and fixing of 3" (75 mm nominal size ) Nahany Trap with Jali -UPVC/SWR Pipe fittings etc., complete for finished item of work.
8
122
976
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Supplying and fixing of 4" (101.6 mm ) multi floor trap with Jali- UPVC/SWR Pipe fittings etc., complete for finished item of work.
4
171
684
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern Parryware or equivalent with internal components and CP short bend and fixed using required size of nails and screws, 15mm PVC connections with brass union nuts CP coated and Brass body CP finish Bib Tap of not less than 300 grams weight with quarter turn spindle including cost and conveyance of all materials to site, etc., complete for finished item of work for all floors.
1
5481
5481
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Supplying and fixing 580mm x 440mm long Orissa Pan White Glazed Water Closet 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick - ISI mark and providing masonry seat, 10 litres capacity Single Flush PVC Low Level Cistern Parryware or equivalent with internal components fixed on 2 Nos. of teak wood blocks of size 76.20mm x 101.60mm using required size of nails, screws as approved by Engineer-in-charge, CP long bend, 15mm PVC connection with brass union nut CP coated, 31.75mm brass plumber union, Brass body CP finish Bib Tap of not less than 300 grams weight with quarter turn spindle, P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges, etc., complete for finished item of work.
9
4664
41976
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Supplying and fixing of 101.60mm x 609.60mm white glazed porcelain channels 1st quality fixed in brick masonry to the required slopes , white cement pointing including cost and conveyance of all materials and labour charges , complete for finished item of work for all floors.
4
905
3620
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Supplying and fixing of 16mm to 20 mm thick Polished Granite Slab Partition for Urinal of size 4' 0" x 2' 0" including full rounding the edges, fixing in position, polishing, cutting and machinery charges, labour charges, including cost and conveyance of all materials and labour charges, complete for finished item of work for all floors.
6
3948
23691.6
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;b) For 110mm dia per 6 RM
20
370
7410
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, complete for finished item of work at all floor levels. a) For 75mm dia per 6 RM
20
250
5006
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;First Floor
12
628
7540.8
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., complete for finished item of work.
12
594
7137.36
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;First Floor
15
591
8869.05
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., complete for finished item of work. For Walls Plastering.
15
557
8364.75
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;First Floor
0.5
5934
2967.43
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Plain Cement Concrete (1:3:6) Nominal mix (Cement: Fine Aggregate (unscreen sand) : Coarse Aggregate (Metal) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal of 20mm, 13.20/12.50mm,10mm and 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, sales & other taxes on all materials and labour charges for mixing, laying concrete in position, curing etc., complete for finished item of work - BED BLOCK
0.5
5853
2926.5
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Supply and fixing doors as per drawings with WPC door frame of section 100mm x65mm of Aerofit make ISI of 28/30 mm thick single shutter WPC (wood polymer composite)shutter, comprisity of 70% virgin polymore 15% wood powder (fiber) and the remainging 15 additives comprising of virgin PVC Polymner of K value 58 to 60 calsium carbonate and naturals fibres and non toxic adhesive of KAKA Make the door shutters and frame shall be water resistant, fire resistant and termite resistant with tesile strengh not less than 170kg sq/cm and the door shutters and frame surface finished delo paint etc., including supply and fixing 6 no's, MS Z hold fast-150mm long of 40x40x5mm, 3 no's stain less steel, butt hinges 125mm long, and required full body threaded star screws 1 no alluminium aldrop 250mm long , 2no's alluminium tower bolts 200mm long, 2 no's alluminium handles 150mm long, including cost and convayance all materials to site, labour charges for fixing the frame in position, fixtures , fixing the shutter to the frame etc., complete for finished item of work for all floors.
20
6059
121185
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;First Floor
3
3451
10355.4
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Providing and laying Cinder Concrete in Cement, Cinder Mix (1:15) Prop. (Cement : Cinder) using 12.5mm nominal size cinder laid in layers and compacted as directed by Engineer-in-charge for filling in sunken floors including cost and conveyance of all materials , water to work site , and all operational , incidental , labour charges , such as mixing cement & cinder etc., includingetc., complete for finished item of work.
3
3317
9951.3
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;First Floor
1.5
6506
9760.03
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Plain Cement Concrete (1:2:4) (M20) Grade Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing & lift charges etc., for finished item of work.
1.5
6424
9637.24
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;First Floor
18
675
12166.2
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Providing impervious coat to exposed RCC Roof Slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab including etc., complete for finished item of work.
18
642
11570.4
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Providing and applying Acrylic Based Adhesive bonding coats with BRUSH BOND RFX of FOSROCK make applying two coats with brushes to cover the surface uniformly before placing the screde concrete as per the manufactures specifcation, including sales and other taxes including cost and conveyance of all materials, labour charges, incidental and operational chrages, transporation charges and etc., complete for finished item of work.
60
298
17904
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Dismantling doors, Windows & clear storey windows, ventilators etc., (wood or Steel) shutters including chowkhats, architraves, holdfasts and other attachments including etc., complete & stacking them within 100 mt lead
20
276
5524
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;First Floor
0.5
8239
4119.65
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Brick masonry for Panel walls 230mm thick in superstructure with CM (1:8) prop: (Cement : Screened Sand) using Second Class Clay Bricks of size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work. Ground Floor
0.5
8089
4044.58
... More
Renovation of Gents Toilet Ground Floor and First Floor at Hi Tech Boys;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges , etc., complete Terrazo flooring / Glazed tiles /
172
152
26247.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%