For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 3,722Document Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
574962Tender No
190/EE/UBD/2025, Dt:10.02.2025Tender Authority
Osmania University ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing repais on terrace over room;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., complete for finished item of work.
40
695
27826
... More
Providing repais on terrace over room;Providing impervious coat to exposed RCC Roof Slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., complete for finished item of work. Third Floor
250
742
185525
... More
Providing repais on terrace over room;Applying SBR Roof Bond Fosroc (Dr.Fixit Pidicreate URP301 latex) for Bonding with old concreate and new concrete and bonding coat with paint of SBR Roof Bond coat chemical in two coates with one part of cement and apply the chemical with brush including cost and conveyance of all materials and labour charges etc., complete finished item of work.
235
111
26108.5
... More
Providing repais on terrace over room;Plain Cement Concrete (1:2:4) (M20) Grade Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including, sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing & lift charges etc., for finished item of work . Third Floor
12
8259
99112.8
... More
Providing repais on terrace over room;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges etc., complete Brick Masonry
0.5
312
156.05
... More
Providing repais on terrace over room;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges etc., complete Unreinforced cement concrete up to 15cm thickness.
1.8
1861
3351.06
... More
Providing repais on terrace over room;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges etc., complete for finished item of work cement flooring over terrace.
235
8
1880