Osmania University Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Osmania University Tender
Civil And Construction
Building Construction
Opening Date28 Feb 2025
Closing Soon15 Mar 2025
Tender Amount₹ 5,77,922
Costs
EMD
₹ 5,779Document Cost
Refer DocumentsTender Fee
₹ 2,500
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
578256Tender No
185/3/EE/UBD/2025, Dt:25.02.2025Tender Authority
Osmania University ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Renovation of Toilet Blocks in First Floor;Supply & Fixing of 15 mm brass body Premium variety Chromium plated finish long neck pillar cock with aerator of not less than 500 gramsweight quarter turn spindle conforming to IS 8931 and with a warranty of 10 years etc., complete for finished item of work
4
1207
4828
... More
Renovation of Toilet Blocks in First Floor;Supply & Fixing of 15 mm brass body premium variety Chromium Plated finish bib tap angular shape with wall flange of not less than 500 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931 and with 10 years warranty etc., complete for finished item of work. First and Second Floor
7
1315
9205
... More
Renovation of Toilet Blocks in First Floor;Supply and fixing 3" (75 mm nominal size ) Nahany Trap with Jali - UPVC/SWR Pipe fittings etc., complete for finished item of work
4
122
488
... More
Renovation of Toilet Blocks in First Floor;Supply and fixing 4" (101.6 mm ) multi floor trap with Jali-UPVC/SWR Pipe fittings including cost and conveyance of all materilas etc., complete for finished item of work
8
171
1368
... More
Renovation of Toilet Blocks in First Floor;Painting to Old walls with 2 coats Acrylic based Oil Bound washable Distemper ( Asian / Berger / Nerolac / Saicoat / Indocem ) as approved by Engineer-In-Charge to give an even shade after thourughly brushing the old surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work Internal walls in all floors
180
115
20754
... More
Renovation of Toilet Blocks in First Floor;Providing and applying Altek Luppam or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by Luppy knife air dry for 2 - 3 hrs, sand papering with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work for Internal walls
185
245
45362
... More
Renovation of Toilet Blocks in First Floor;Supplying and fixing white glazed Flat Back Half Stall Urinals of size 590 mm x 375 mm x 390 mm with integral flushing rim fixed with screws complete Indian make (Hindware/Parrywave/Neycer) conforming to IS:2556-1995 as approved by Engineer-in-charge, including supply and fixing 12.7mm PVC connection with brass plumber union nuts CP coated, 12.70mm push cock 1st quality of approved make , 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, labour charges etc., complete for finished item of work for all floors.
2
4402
8804
... More
Renovation of Toilet Blocks in First Floor;Supplying & Fixing Indian make Flat Back Wash Hand Basin 1st quality conforming to IS:2556-Part-4:1972 of (Hindware/Neycer/Parrywave make) with waste fittings like rubber plug, chain, 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:29631979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/ Senior/ Nice/ Esso or equivalent complete with standard CI brackets including wooden block: 550 x 400 mm - Single C.P. Pillar cockincluding wooden blocks,1 No of 30mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges, for finished item of work
4
2337
9348
... More
Renovation of Toilet Blocks in First Floor;Second Floor
10
1047
10475
... More
Renovation of Toilet Blocks in First Floor;Providing dadooing to walls with glazed full body porcelain wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs with borders (Johnson/Kazaria make) as approved by Engineer-in-Charge set over base coat of CM (1:5) prop, 12mm thick and neat grey cement slurry of honey like consistency, spread at the rate of 3.3kgs per sqm and jointed with white cement or coloured cement to match the shade of the tiles, including cost and conveyance of all materials like cement, sand, water, tiles, coloured cement, etc., to site, all labour charges for mixing of cement mortar, laying glazed tiles to level, curing etc., complete for finished item of work as directed by Engineer-in-charge. First Floor
50
1038
51920
... More
Renovation of Toilet Blocks in First Floor;Supplying and fixing of 101.60mm x 609.60mm white glazed porcelain channels 1st quality fixed in brick masonry to the required slopes , white cement pointing including cost and conveyance of all materials and labour charges , completefor finished item of work for all floors.
1.5
905
1357.5
... More
Renovation of Toilet Blocks in First Floor;Supplying and fixing of 16mm to 20 mm thick Polished Granite Slab Partition for Urinal of size 4' 0" x 2' 0" including full rounding the edges, fixing in position, polishing, cutting and machinery charges, labour charges, including cost and conveyance of all materials and labour charges, complete for finished item of work for all floors.
1
5062
5062.35
... More
Renovation of Toilet Blocks in First Floor;Second Floor
15
647
9709.5
... More
Renovation of Toilet Blocks in First Floor;Flooring with Non-skid full body Ceramic floor tiles of size 300 x 300 mm and thickness between 7-8mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs (Johnson/Kazaria make) as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick including neat cement slurry of honey like consistancy spread at the rate of 3.3kg per sqm and filling the joints with white cement mixed with pigment of matching shade to match the shade of tiles over a bed of C.C. or R.C.C. slab, including cost and conveyance of all materials like cement, sand, water, ceramic tiles, white cement etc., to site (excluding cost of C.C. bed), cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer-in-charge curing etc., complete and finished item of work First Floor
15
628
9426
... More
Renovation of Toilet Blocks in First Floor;Supply & Fixing premium make CPVC Pipes of 22.20mm OD Pipe - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent ement etc., and labour charges complete ncluding cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge etc., complete for finished item of work ashirvad flow guard plus make.
21
313
6573
... More
Renovation of Toilet Blocks in First Floor;Supply & Fixing premium make CPVC Pipes of 28.60mm OD Pipe - SDR 11 including the cost of pipe, required number of connectors such as elbows, tees, couplers, connectors, solvent ement etc., and labour charges complete ncluding cost and conveyance of all materials to site, all operational, incidental , labour charges, etc. complete for finished item of work as directed by Engineer-in-charge etc., complete for finished item of work ashirvad flow guard plus make.
33
410
13530
... More
Renovation of Toilet Blocks in First Floor;Supplying and fixing 580mm x 440mm long Orissa Pan White Glazed Water Closet 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with - ISI mark and providing brick masonry seat, 10 litres capacity Single Flush PVC Low Level Cistern Parryware or equivalent with internal components fixed on 2 Nos. of teak wood blocks of size 76.20mm x 101.60mm using required size of nails, screws as approved by Engineer-in-charge, CP long bend, 15mm PVC connection with brass union nut CP coated, 31.75mm brass plumber union, Brass body CP finish Bib Tap of not less than 300 grams weight with quarter turn spindle, P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges, etc., complete for finished item of work.
3
4664
13992
... More
Renovation of Toilet Blocks in First Floor;Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of Hindware / Neycer or Parryware make white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern Parryware or equivalent with internal components and CP short bend and fixed using required size of nails and screws, 15mm PVC connections with brass union nuts CP coated and Brass body CP finish Bib Tap of not less than 300 grams weight with quarter turn spindle including cost and conveyance of all materials to site, etc., complete for finished item of work for all floors.
2
5481
10962
... More
Renovation of Toilet Blocks in First Floor;b) For 110mm dia
55
370
20377.5
... More
Renovation of Toilet Blocks in First Floor;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, complete for finished item of work at all floor levels a) For 75mm dia
55
250
13766.5
... More
Renovation of Toilet Blocks in First Floor;Second Floor
37
662
24495.11
... More
Renovation of Toilet Blocks in First Floor;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, lift charges, curing, including cutting grooves as directed by Engineer-in-charge complete for finished item of work. First FLoor
34
628
21365.6
... More
Renovation of Toilet Blocks in First Floor;Second Floor
37
374
13847.25
... More
Renovation of Toilet Blocks in First Floor;Plastering in Single coats of 20mm thick in CM (1:3) Prop including cost and conveyance of all materials like cement, sand, water etc., to site, including , sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, lift charges, curing, including cutting grooves as directed by Engineer - in - charge complete for finished item of work First Floor
34
360
12240
... More
Renovation of Toilet Blocks in First Floor;Second Floor
37
263
9738.4
... More
Renovation of Toilet Blocks in First Floor;Plastering in Single coats of 16mm thick in CM (1:4) Prop including cost and conveyance of all materials like cement, sand, water etc., to site, including, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, lift charges, curing, including cutting grooves as directed by Engineer - in - charge., complete for finished item of work First Floor
34
254
8646.2
... More
Renovation of Toilet Blocks in First Floor;Second Floor
17
625
10625
... More
Renovation of Toilet Blocks in First Floor;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including , sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., complete for finished item of work. ) For Walls Plastering First Floor
14
591
8274
... More
Renovation of Toilet Blocks in First Floor;Second Floor
2
6589
13178
... More
Renovation of Toilet Blocks in First Floor;Plain Cement Concrete (1:2:4) (M20) Grade Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including , sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing & lift charges etc., for finished item of work First Floor
2
6507
13014
... More
Renovation of Toilet Blocks in First Floor;Second Floor
20
709
14180
... More
Renovation of Toilet Blocks in First Floor;Providing impervious coat to exposed RCC Roof Slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including, sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., complete for finished item of work.
20
675
13518
... More
Renovation of Toilet Blocks in First Floor;Providing and applying Acrylic Based Adhesive bonding coats with BRUSH BOND RFX of FOSROCK make applying two coats with brushes to cover the surface uniformly before placing the screde concrete as per the manufactures specifcation, including sales and other taxes including cost and conveyance of all materials, labour charges, incidental and operational chrages, transporation charges etc., complete for finished item of work.
30
298
8952
... More
Renovation of Toilet Blocks in First Floor;Second Floor
0.2
6017
1203.4
... More
Renovation of Toilet Blocks in First Floor;Plain Cement Concrete (1:3:6) Nominal mix (Cement: Fine Aggregate (unscreen sand) : Coarse Aggregate (Metal) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal of 20mm, 13.20/12.50mm,10mm and 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including, sales & other taxes on all materials and labour charges for mixing, laying concrete in position, curing etc., complete for finished item of work ) - BED BLOCK First Floor
0.2
5935
1187
... More
Renovation of Toilet Blocks in First Floor;Supply and fixing doors as per drawings with WPC door frame of section 100mm x65mm of Aerofit make ISI of 28/30 mm thick single shutter WPC (wood polymer composite)shutter, comprisity of 70% virgin polymore 15% wood powder (fiber) and the remainging 15 additives comprising of virgin PVC Polymner of K value 58 to 60 calsium carbonate and naturals fibres and non toxic adhesive of KAKA Make the door shutters and frame shall be water resistant, fire resistant and termite resistant with tesile strengh not less than 170kg sq/cm and the door shutters and frame surface finished delo paint etc., including supply and fixing 6 no's, MS Z hold fast-150mm long of 40x40x5mm, 3 no's MS power coated, butt hinges 125mm long, and required full body threaded star screws 1 no alluminium aldrop 250mm long , 2no's alluminium tower bolts 200mm long, 2 no's alluminium handles 150mm long, including cost and convayance all materials to site, labour charges for fixing the frame in position, fixtures , fixing the shutter to the frame etc., complete for finished item of work for all floors.
15
6059
90888.75
... More
Renovation of Toilet Blocks in First Floor;Second Floor
0.5
8389
4194.5
... More
Renovation of Toilet Blocks in First Floor;Brick masonry for Panel walls 230mm thick in superstructure with CM (1:8) prop: (Cement : Screened Sand) using Second Class Clay Bricks of size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, constructing masonry, lift charges, curing etc., complete for finished item of work. First Floor
0.5
8239
4119.5
... More
Renovation of Toilet Blocks in First Floor;Dismantling old cement motor clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges etc., complete for finished item of work.
172
8
1376
... More
Renovation of Toilet Blocks in First Floor;Dismantling doors, Windows & clear storey windows, ventilators etc., (wood or Steel) shutters including chowkhats, architraves, holdfasts and other attachments etc., complete & stacking them within 100 mt lead First Floor & Second Floor
9
276
2485.8
... More
Renovation of Toilet Blocks in First Floor;Dismantling, clearing away debries carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges , etc., complete Terrazo flooring / Glazed tiles / Ceramic tiles First Floor / Second Floor
135
152
20601
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%