Osmania University Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Osmania University Tender

Works
Civil And Construction
Building Construction
Opening Date14 Feb 2024
Closing Date21 Feb 2024
Tender Amount₹ 1,04,518 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repairs to Room No.18 and corridor ventilator;Application of Grey Lappam Putty to Wooden Doors in 2 or more coats to get the even shade after throughly sand papering & brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges, including etc., for finished item of work

10

135

1359

... More
Repairs to Room No.18 and corridor ventilator;S&F of 15 mm brass body CP finish bib tap of not less than 300 grams weight with quarter turn spindle with either internal or external threaded connection conforming to IS 8931 etc., complete for finished item of work.

30

609

18270

... More
Repairs to Room No.18 and corridor ventilator;Supplying and fixing of 16mm to 20 mm thick Polished Granite Slab Partition for Urinal of size 4'-0" x 2'-0" including full rounding the edges, fixing in position, polishing, cutting and machinery charges, labour charges, including cost and conveyance of all materials and labour charges, complete for finished item of work for all floors.

0.73

3556

2596.03

... More
Repairs to Room No.18 and corridor ventilator;S&F of pre-cast RCC Grills of any design of 50 mm thick manufactured with M-30 grade of concrete using vibro-compaction process using joint less FRP moulds to achieve shuttering finish and adequately reinforced for long use and to prevent damage during handling, transportation & erection etc.

4

602

2408

... More
Repairs to Room No.18 and corridor ventilator;Providing 110 mm Dia ISI marked PVC down water take pipes with socket 4kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, PVC Shoes PVC clamps and all other accessories and fixing in position including Cutting holes in Brick masonry & repairs including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site including etc., complete for finished item of work.

8

310

2486.8

... More
Repairs to Room No.18 and corridor ventilator;Plain Cement Concrete (1:3:6) Nominal mix (Cement: Fine Aggregate (unscreen sand) : Coarse Aggregate (Metal) using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal of 20mm, 13.20/12.50mm,10mm and 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including , sales & other taxes on all materials and labour charges for mixing, laying concrete in position, curing including etc., complete for finished item of work. - BED BLOCK

0.5

6064

3032

... More
Repairs to Room No.18 and corridor ventilator;Supplying and Fixing Door single shutter solid bond wood work board type with commercial ply on both faces 30mm thick conforming to IS:2202 with stainless steel butt linges 125mm long 3 no's, stainless steel door handles 125mm long 2 no's stainless steel tower handles150mm long 2 no's, stainless steel aldrop 300mm long 1 no etc., complete for finished item of work.

1.4

2680

3752.84

... More
Repairs to Room No.18 and corridor ventilator;Supply and fixing window as per drawing with Medium Teak wood frame of section 100x65mm and teak wood shutter with teak wood styles of size 65x40mm for top, middle and vertical, 75x40mm for bottom sytle with 4mm thick pin headed glass at top 1/3rd portion and 2/3rd portion with 15mm thick teak wood planks fixed with ornamental teak wood beading of size 12x12mm window frame is also fixed with stainless steel 26 guage MP mesh with alluminium frame of size 40x18mm @ 1.55mm thick fixed in central groove with 'U' channel of Aluminium 7.60x7.60 @ 0.80mm thick with screws & nails including 2 nos aluminium, Tower bolts 100mm long, 1 no aluminium handle 100mm long for each aluminium shutter for each teak wood shutters 2 nos MS powder coated tower bolts, 100mm long, 150mm long MS powder coated handle 1 no and 2 nos MS powder coated butt iron hings 100mm long for aluminium MP mesh shutter 2 nos 75mm long aluminium butt hings including cost and conveyanance of all materials, labour charges incidental, operational, wrought fixed with 4 nos MS hold fasts of size 40x40x5mm including provide MS falts 7 nos of size 35x5mm unit full width of winodws as safty bards & supply fixing MS hook stoper 3 nos - 150mm etc., complete for finished item of work.

1.7

7565

12861.26

... More
Repairs to Room No.18 and corridor ventilator;Dismantling doors, Windows & clear storey windows, ventilators etc., (wood or Steel) shutters including chowkhats, architraves, holdfasts and other attachments including etc., complete & stacking them within 100 mt lead Not exceeding 3 sqm in area.

2

247

494.2

... More
Repairs to Room No.18 and corridor ventilator;First Floor

2

593

1187.8

... More
Repairs to Room No.18 and corridor ventilator;(II) External walls Ground floor -

50

551

27550

... More
Repairs to Room No.18 and corridor ventilator;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., complete for finished item of work. (I) Internal walls Ground floor.

10

551

5510

... More
Repairs to Room No.18 and corridor ventilator;Ornamental Plastering to Ceiling with 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., complete for finished item of work. (A) Ground Floor

12

531

6376.8

... More
Repairs to Room No.18 and corridor ventilator;Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Engineer-in-charge duly taking actual premeasurements before dismantling including all labour charges etc., complete Old Cement Mortor plaster.

70

7

490



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.