Nuclear Fuel Complex Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Nuclear Fuel Complex - NFC Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date4 Apr 2022
Closing Date23 Apr 2022
Tender Amount₹ 3,59,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material upto a lead of 2.00 km for Beyond 30 cm girth upto and including 60 cm girth.

50

-

-

... More
Cutting carefully tree branches of different sizes leaning over the pathway or building at all heights, cutting the branches into pieces for easy trasportation, conveying and stacking at a place as shown upto a lead of 2.00 km including all tools, tackeles etc complete as directed by Engineer-in-Charge.

120

-

-

... More
Lead Charges including loading, unloading and stacking the disposable excavated rock and or debris by mechanical trasport for lead up to 2 KM.

200

-

-

... More
II. CONCRETE WORK

-

-

-

... More
Cement concrete 1:3:6 using Pazzolona Portland Cement conforming to IS 1489 (M/s. ACC, Ultra Tech, Raasi, Birla, Coramandal, M/s. Andhra Cement Ltd., KCP), river sand and graded stone aggregates of 6 mm maximum size at and at all depths below plinth level including consolidation, finishing, curing, etc., complete but excluding formwork as per specifications and as directed by Engineer -in- charge.

700

-

-

... More
III. FORMWORK

-

-

-

... More
Providing, centring and shuttering using steel shuttering plates wooden planks including strutting and propping etc. and removal of the same for in situ reinforced concrete and in plain concrete work as required including chamfers, splays, keys, wedges,nails,bracings,brackets and applying one coat of shuttering oil on all shuttering surfaces coming in contact with concrete for Mud mat Foundations, footings,bases, columns, flooring, bed blocks. etc.,complete as directed by Engineer -in- Charge.

200

-

-

... More
IV. BRICK MASONRY

-

-

-

... More
Brick work using clay flyash bricks (non modular) brick of class designation 7.5 as specified for foundation, strom water drains, bunds, walls etc., using cement mortar 1:4 ratio at all height and depths simultaneous pointing with same mortar below and above ground level and ranking out joints above ground level, curing etc. complete as per specification and as directed. Note: Manufactured sand shall be used conforming to relevant IS code.

60

-

-

... More
V. PAVEMENT (FOOT PATHWAY)

-

-

-

... More
Providing and laying factory made chamfered edge not less than 60 mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern. Cement Concrete paver blocks of Classic, Dura crete/Euro or approved equivalent make in footpath, drive ways, parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. Note: Manufactured sand shall be used conforming to relevant IS code.

16800

-

-

... More
Painting the surface of the Cement concrete Kerb stones and dividing strips with 3 (three) coats of suitable road marking paint of superior make as per relevant IS code of Asian/Berger/ Nerolac make or approved equivalent of required shade in suitable strips/bands over a coat of cement primer or suitable primer as recommended by the manufacturer of specified make above , cleaning the surface of all dirt, scales, oil, grease and other foreign material etc. and lining out complete, providing necessary barricades, caution boards, removing the barricades and caution boards after painting, clearing the roads for traffic etc., complete as directed.

7900

-

-

... More
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3, including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm),including making drainage opening wherever required complete etc. as per directionof Engineer-in-charge (length of finished kerb edging shall be measured for payment).(Precast C.C. kerb stone shall be approved by Engineer-in-charge).

600

-

-

... More
Providing and laying non-pressure NP2 class (light duty) 150 mm dia. R.C.C. pipe with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints, making necessary mouth for entry of rain water into pipe etc. complete and as directed.

800

-

-

... More
Providing and fixing to the inlet mouth of rain water pipe with Cast Iron grating 150mm diameter or 150 mm Square weighing not less than 440 grams including makinng good with the cement mortar as required complete as per specifications and as directed by Enginner- In- Charge.

500

-

-

... More
VI. FINISHING

-

-

-

... More
Cement plastering 15 mm thick for walls in cement mortar 1:4 ratio fininshed smooth at all height above plinth level over brick walls or concrete surface including making necessary grooves in between junctions or brick masonary and RCC and also other places wherever required over brick walls or concrete surface preparation of surface, steel/tubular scaffolding curing etc., complete as directed. Note: River sand shall be used conforming to relevant IS code.

500

-

-

... More
VII.DEMOLISHING & DISMANTLING WORKS

-

-

-

... More
Demolishing Plain cement concrete manually/ by mechanical means including disposal of material within 2 Kms lead, cleaning etc., complete and as directed by Engineer - in - charge.

30

-

-

... More
Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 2 kms, stacking serviceable and unserviceable material separately including cutting reinforcement bars complete and as directed by Engineer -in- charge.

10

-

-

... More
Demolishing brick work manually/ by mechanical means existing Brick masonry in cement motor with plastering on both sides very carefully at depths/heights above/below plinth level including erection of suitable scaffolding, stacking of serviceable material and disposal of unserviceable material within the lead of 2 Kms etc., complete as specified and directed.

15

-

-

... More
Dismantling Stone slab flooring of all kinds laid in cement mortar etc. including removal of bedding mortar,including stacking of serviceable material and disposal of unserviceable material within 2 Kms lead etc., complete as specified and directed.

200

-

-

... More
Dry stone pitching 22.5 cm thick including supply of stones and preparing surface, pointing as required complete as specified and directed.

200

-

-

... More
Cutting road and making good the same including supply of extra quantities of materials i.e. Coarse and fine aggregate, moorum screening, red bajri, labour required, disposal of unserviceable material within 2 Kms lead etc., complete as specified and directed for bituminous and Cement Concrete road portions.

35

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.