Nuclear Fuel Complex Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Nuclear Fuel Complex - NFC Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date27 Apr 2024
Closing Date14 May 2024
Tender Amount₹ 42,14,312
Costs
EMD
₹ 84,286Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Ac Provision For Zfp Rma Assembly Facility
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NFC_805070_1Bid Award Id
ViewTender No
E664/2024Tender Authority
Nuclear Fuel Complex ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Cooling tower water pipe line for INLET in GI - Size : 2 " for 11 TR Package AC - including flanges, elbows, couplings, nipples , welding, etc. as required. Ball valve - 1/2 " size - 2 nos., Butter fly valves for Inlet - 4 nos.; digital pressure guages ( range 0-16Kg/Cm2) - 2 nos. , digital flow meters( range up to 200 lpm) -02 nos. for measuring cooling water in the Inlet. Entire GI piping shall be done painting with red oxide & double coat metal metal primer painting ( preferably - green colour) & as required as per site conditions.
-
-
-
... More
Supply
30
-
-
... More
Erection
30
-
-
... More
Supply & Laying of Cooling tower water pipe line for OUTLET in GI - Size : 2.5 " for 11 TR Package AC - including flanges, elbows, couplings, nipples, welding, etc. as required. Ball valve - 1/2 " size - 2 nos., Butter fly valves for Inlet - 4 nos. Entire GI piping shall be done painting with red oxide & double coat metal metal primer painting ( preferably - green colour) & as required as per site conditions.
-
-
-
... More
Supply
130
-
-
... More
Erection
130
-
-
... More
GI ducting along with suitable supporting structure based on the approved drawings as per the site conditions
-
-
-
... More
Supply :GI ducting 22 Guage
170
-
-
... More
Erection : GI ducting 22 Guage
170
-
-
... More
Supply :GI ducting 24 Guage
60
-
-
... More
Erection : GI ducting 24 Guage
60
-
-
... More
ACOUSTIC INSULATION OF DUCTS : Supply and Application of Acoustic insulation for the initial portion of supply air ducting. Material of construction shall be fibre-free elastomeric nitrile rubber foam with open cell structure . The density of the same shall be within 140-180 Kg/m3. The material should have a thermal conductivity not exceeding 0.050 W/mK. The maximum surface temperature the material should withstand is 105° C and minimum temperature should be -20°C. The material should conform to Class 1 rating for surface spread of Flame as per BS 476 Part 7. The insulation material shall be shall be stuck to the cleaned duct surface by factory pre-fixed cold adhesive. The material and installation methodology should be in accordance with the specifications. Thickness of insulation:25mm.
-
-
-
... More
Supply
60
-
-
... More
Erection
60
-
-
... More
THERMAL INSULATION OF DUCTS (UN EXPOSED) : Supply and Application of External Thermal Insulation of Supply Air ducting. Material of construction shall be cross linked polyolefin/ polyethelene foam material with closed cell structure and with factory applied reinforced aluminium foil. The density of the same shall be within 25 Kg/m3.The material should have a thermal conductivity not exceeding 0.032 W/mK. The insulation material shall be shall be stuck to the cleaned duct surface by factory pre-fixed cold adhesive. The material and installation methodology should be in accordance with the specifications. Thickness of insulation:25mm.
-
-
-
... More
Supply
250
-
-
... More
Erection
250
-
-
... More
Supply and installation of Flexible canvas cloth
10
-
-
... More
POWER CABLING : Supply & Installation of Power supply cable - BIS certfied PVC insulated Armoured FRLS electrical - four core copper cable - 16 Sq.mm size including GI wire for earthing & clamping, etc.
-
-
-
... More
Supply
80
-
-
... More
Erection
80
-
-
... More
SA Grill : Supply & Installation of Aluminium powder coated ( of minimum thickness of 0.8 mm ) grill without Volume Control Damper (VCD) alongwith all necessary hardware complete in all respects.
-
-
-
... More
Supply
6
-
-
... More
Erection
6
-
-
... More
RA Grill : Supply & Installation of Aluminium powder coated ( of minimum thickness of 0.8 mm ) grill without Volume Control Damper (VCD) alongwith all necessary hardware complete in all respects as per the site conditions.
-
-
-
... More
Supply
8
-
-
... More
Erection
8
-
-
... More
DAMPERS: Supply, installation, testing and commissioning of Factory fabricated low leakage manually operated volume control duct dampers with Aerofoil-blades and MOC as 1.5mm thick powder coated Aluminium . Canvas cloth of suitable size with zip shall be connected to outlet of AC & Damper.
-
-
-
... More
Supply
6
-
-
... More
Erection
6
-
-
... More
STRUCTURAL FABRICATED STEEL WORK: Supply, Fabrication , Cutting, Welding , Erection at site and painting of M. S. Angle structural steel work for required truss, AHU/ODU /Supporting structurer/etec. & as per site requirements, etc. based on the approved drawings. The work should be carried out as per good manufacturing and installation practices in concurrence with approved drawings. The structural steel materials should confirm to IS : 2062 (latest version) as per drawings. All welding electrodes to confirm to relevant IS codes. Fabrication and erection of the structural steel works shall be as per IS: 800 and welding work as per IS:816 and IS: 822. Finally all steel work to be painted with one coat of zinc chromate primer and two coats of synthetic enamel paint.
-
-
-
... More
Supply
800
-
-
... More
Erection
800
-
-
... More
CPVC drain Pipe-32 mm : Hard CPVC drain piping insulated out of class O closed cell elastomeric nitrile rubber with U trap & necessary fittings/clampings, etc.
-
-
-
... More
Supply
30
-
-
... More
Erection
30
-
-
... More
Electrical panel (MCB DB) board for power supply to 08Nos.X 11 TR Package AC Units - One suitable size incommer- isolator of 200 Amps rating and 5 outgoing MCB's- of 32 Amps rating. Indication lamps for Incoming power supply source and Indication lamps for AC Units ON ; OFF & TRIP for each AC Unit. Digital Multi data Meter with dual reading arrangement for volt, Amps, PF & Energy for each Pacakge AC Unit.
-
-
-
... More
Supply
2
-
-
... More
Erection
2
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements