Nuclear Fuel Complex Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Nuclear Fuel Complex - NFC Tender
Electrical and Electronics
Eprocure
Opening Date9 Dec 2023
Closing Date21 Dec 2023
Tender Amount₹ 64,71,000
Costs
EMD
₹ 1,29,420Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Sitc Of Split And Tower Ac Units At Rennovated Hrd Halls
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_NFC_784370_1Bid Award Id
ViewTender No
E655/2023Tender Authority
Nuclear Fuel Complex ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
2.0 TR Capacity High Wall Mounted Split Type AC unit
(i) Nominal cooling capacity : 2.0 TR / 6000 K.Cal/Hr.
(ii) Power supply : Single phase , 230 volts, 50 Hz.
(iii) BEE Star Rating : 5 Star
(iv) Technology of AC : Inverter AC- Variable speed
(v) Indoor (IDU) & Outdoor Unit (ODU)Coil : Shall be of Copper tubing and Air Cooled condensing unit
(vi) Refrigerant : R-32 / Eco-Friendly
(vii) Refrigerant Ozone Depletion positional : Zero
(viii) Minimum length of copper tubing and suitable connecting electrical cable : 3 Meters.
(ix) Warrantee on Machine : Min. 1 year
(x) Warrantee on Compressor : Min. 10 Years.
(xi) Conformity to Indian Standard : IS 1391 (part-2) latest
(xii) Suitable Heavy duty bracket/stand for ODU
-
-
-
Supply
25
-
-
Erection
25
-
-
3 TR Capacity Floor Mounted Tower Type AC units
(i) Nominal cooling capacity : 3.0 TR / 9000 K.Cal/Hr.
(ii) Power supply : Three phase , 415 volts, 50 Hz.
(iii) Technology of AC : Inverter AC- Variable speed
(iv) Air Flow of IDU : Range from 490 - 830 CFM
(v) Indoor (IDU) & Outdoor Unit (ODU)Coil : Shallbe of Copper tubing and Air Cooled condensing unit
(vi) Refrigerant : R-32 / R-410A/ Eco-Friendly
(vii) Refrigerant Ozone Depletion positional : Zero
(viii) Noise level of IDU : Maximum upto 54 dB(A)
(ix) Refrigerant control : Electronic Expansion Valve
(x) No. of IDU (indoor unit): One
(xi) No. of ODU(outdoor unit) & Compressor type : One & High Energy Efficient
(xii) Cordless Remote controller
(xiii) Warrantee on Machine : Min. 1 year
(xiv) Warrantee on Compressor : Min. 10 Years.
-
-
-
Supply
4
-
-
Erection
4
-
-
4 TR Capacity Floor Mounted Tower Type AC units
(i) Nominal cooling capacity : 4.0 TR / 12000 K.Cal/Hr.
(ii) Power supply : Three phase , 415 volts, 50 Hz.
(iii) Technology of AC : Inverter AC- Variable speed
(iv) Air Flow of IDU : Range from 840 - 1350 CFM
(v) Indoor (IDU) & Outdoor Unit (ODU)Coil : Shallbe of Copper tubing and Air Cooled condensing unit
(vi) Refrigerant : R-32 / R-410A/ Eco-Friendly
(vii) Refrigerant Ozone Depletion positional : Zero
(viii) Noise level of IDU : Maximum upto 56 dB(A)
(ix) Refrigerant control : Electronic Expansion Valve
(x) No. of IDU (indoor unit): One
(xi) No. of ODU(outdoor unit) & Compressor type : One & High Energy Efficient
(xii) Cordless Remote controller
(xiii) Warrantee on Machine : Min. 1 year
(xiv) Warrantee on Compressor : Min. 10 Years.
-
-
-
Supply
8
-
-
Erection
8
-
-
Suitable size ( as per OEM recommendation) refefrigerant copper piping with nitrile rubber insulation foam
tube , power supply cable, control cable , white tape/masking tape , etc. as required as per site conditions for
Item No (1) & (2). Entire refrigerant copper piping , cable , etc. shall be laid / run in suitable hard PVC pipe
with necessary bends , couplings, fitting etc. as per site conditions.
-
-
-
Supply
80
-
-
Erection
80
-
-
Suitable size ( as per OEM recommendation) refefrigerant hard copper piping with nitrile rubber insulation
foam tube , power supply cable, control cable , white tape/masking tape , etc. as required as per site conditions
for Item No (3) & (4). Entire refrigerant copper piping , cable , etc. shall be laid / run in suitable hard PVC
pipe with necessary bends , couplings, fitting etc. as per site conditions..
-
-
-
Supply
80
-
-
Erection
80
-
-
Plywood Sheet of MR ( Moisture Resistant) Grade Confirming to IS : 303-1989 - Size 12 mm to 18 mm
thickness ( for Fixing of IDU of Split AC Units) with necessary nut & bolts, washers , etc in SS grade as per
the site conditions / requirement to fulfill asthetic installation of IDU of split ac.
-
-
-
Supply
15
-
-
Erection
15
-
-
Power Cabling : Power supply cable - BIS certfied XLPE insulated Armoured FRLS electrical - four core
copper cable - 4 Sq. mm & 6 Sq.mm size including GI wire for earthing & clamping, etc.
-
-
-
Supply
80
-
-
Erection
80
-
-
Control Cabling : Control cable - BIS certfied XLPE insulated FRLS electrical - five /four core copper cable -
1.5 Sq.mm size including GI wire for earthing & clamping, etc.for IDU to ODU.
-
-
-
Supply
80
-
-
Erection
80
-
-
STRUCTURAL FABRICATED STEEL WORK: Supply, Fabrication , Cutting, Welding , Erection at site and
painting of M. S. Angle structural steel work for required truss, AHU/ODU /Supporting structurer/etec. & as
per site requirements, etc. based on the approved drawings. The work should be carried out as per good
manufacturing and installation practices in concurrence with approved drawings. The structural steel materials
should confirm to IS : 2062 (latest version) as per drawings. All welding electrodes to confirm to relevant IS
codes. Fabrication and erection of the structural steel works shall be as per IS: 800 and welding work as per
IS:816 and IS: 822. Finally all steel work to be painted with one coat of zinc chromate primer and two coats of
synthetic enamel paint.
-
-
-
Supply
500
-
-
Erection
500
-
-
CPVC drain Pipe-32 mm : Hard CPVC drain piping insulated out of class O closed cell elastomeric nitrile
rubber with U trap & necessary fittings/clampings, etc.
-
-
-
Supply
50
-
-
Erection
50
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements