Nuclear Fuel Complex Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Nuclear Fuel Complex - NFC Tender

Works
Electrical Goods and Equipments
Electrical and Electronics
Eprocure
Opening Date30 Jul 2022
Closing Date26 Aug 2022
Tender Amount₹ 1,38,68,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Condensing Units - Air Cooled type Condensing untis equipped with High Energy Efficient Imported Scroll Compressors , Galvanized steel Construction finished in polyester powder coat etc This unit is equipped with Microprocessor based controller having unique features to ensure that system operates at optimum efficiency levels. These units will be inter connected with AHU at item Sl. No. ( 1 ). Capacity: 11 TR. These units shall be supplied with all required accessories such as appropriate sized service Valves, drier filter with both side valves, liquid receiver, in- built thermal/ temperature protection etc. 3 Nos.X 11 TR Condensing units shall be connected to each AHU

-

-

-

... More
Supply

9

-

-

... More
Erection

9

-

-

... More
Testing and commissioning of above condensing units including Nitrogen pressure testing, Vaccumising and Eco-friendly Refrigerant gas charging.

-

-

-

... More
Supply

9

-

-

... More
Erection

9

-

-

... More
Refrigerant Copper piping : High pressure copper refrigerant piping consisting of suction & liquid line piping and fittting with 19 mm thick closed cell elastomeric XLPE insulation and covered with suitable thick/mill glass cloth and finished with polyshield coating with atleast two coats of resin and hardner .The piping shall be carried with soldered/ brazed socket fittings. Refrigerant Hard Copper piping i.e. Liquid line & Suction line with necesary elbows, fittings, service valves, drier filter/catch all filter ( with both side valves ) , thermostatic expansion valves (for each condensing unit) , nitrile rubber insulation , clamping, supporting structure ( GI perforated tray & cover) with grouting , from AHU to 11 TR Condensing Units ( Sizes of Hard Copper pipings is as per OEM recommnedations)

-

-

-

... More
Supply

90

-

-

... More
Erection

90

-

-

... More
Ducting : Design , supply , installation , testing and commissioning of Factory Fabricated GI Ducting complete with high tech supports ( Turning / catch shall be installed for appropriate locations ) . Ducting should be as per SMACNA std. The scope includes required scafolding required for erection of GI ducting etc.

-

-

-

... More
Supply: GI ducting 22 Gauge

600

-

-

... More
Erection: GI ducting 22 Gauge

600

-

-

... More
Supply: GI ducting 24 Gauge

300

-

-

... More
Erection: GI ducting 24 Gauge

300

-

-

... More
Supply: GI ducting 18 Gauge

100

-

-

... More
Erection: GI ducting 18 Gauge

100

-

-

... More
Aluminium SA grills: Aluminium Supply AIR Grills /4-way Diffusers powder coated of minimum thickness 0.8 mm along with all necessary hardware with Volume Control Damper (VCD) .

-

-

-

... More
Supply

25

-

-

... More
Erection

25

-

-

... More
Aluminium RA grills : Aluminium return air Grills/diffusers powder coated of minimum thickness .8 mm along with all necessary hardware without Volume Control Damper (VCD)

-

-

-

... More
Supply

30

-

-

... More
Erection

30

-

-

... More
Damper : Supply and fixing of volume control dampers with chrome plated spindles, self lubricated bushes, full enclosure for blade linkages, operating handle equiped with position indicator. 18g GI for frame,20g for Blades

-

-

-

... More
Supply

15

-

-

... More
Erection

15

-

-

... More
Fire Damper : Fusible link type fire dampers with 90 min fire rating with limit switch

-

-

-

... More
Supply

10

-

-

... More
Erection

10

-

-

... More
THERMAL INSULATION OF DUCTS ( EXPOSED ): Supply and Application of External Thermal Insulation of Supply Air and return air ducting coming out side. Material of construction shall be cross linked polyolefin/polyethylene foam material with closed cell structure and with factory applied reinforced aluminium foil. The density of the same shall be within 25 Kg/m3.The material should have a thermal conductivity not exceeding 0.032 W/mK. The insulation material shall be shall be stuck to the cleaned duct surface by factory pre-fixed cold adhesive. The finishing will be carried out with fixing 200 gsm glass cloth with the help of adhesive Fevicol lag coating (AF 5590) . Finally it will be painted with synthetic enamel paint. The material and installation methodology should be in accordance with the specifications. Insulation shall be of 25 mm thick

-

-

-

... More
Supply

300

-

-

... More
Erection

300

-

-

... More
THERMAL INSULATION OF DUCTS (UN EXPOSED) : Supply and Application of External Thermal Insulation of Supply Air ducting. Material of construction shall be cross linked polyolefin/ polyethelene foam material with closed cell structure and with factory applied reinforced aluminium foil. The density of the same shall be within 25 Kg/m3.The material should have a thermal conductivity not exceeding 0.032 W/mK. The insulation material shall be shall be stuck to the cleaned duct surface by factory pre-fixed cold adhesive. The material and installation methodology should be in accordance with the specifications. Thickness of insulation:25mm thick - Class " O "

-

-

-

... More
Supply

900

-

-

... More
Erection

900

-

-

... More
ACOUSTIC INSULATION OF DUCTS : Supply and Application of Acoustic insulation for the initial portion of supply air ducting. Material of construction shall be fibre-free elastomeric nitrile rubber foam with open cell structure . The density of the same shall be within 140-180 Kg/m3. The material should have a thermal conductivity not exceeding 0.050 W/mK. The maximum surface temperature the material should withstand is 105° C and minimum temperature should be -20°C. The material should conform to Class 1 rating for surface spread of Flame as per BS 476 Part 7. The insulation material shall be shall be stuck to the cleaned duct surface by factory pre-fixed cold adhesive. The material and installation methodology should be in accordance with the specifications. Thickness of insulation:25mm.

-

-

-

... More
Supply

350

-

-

... More
Erection

350

-

-

... More
Providing of sound attenuators at appropriate locations . It will of square/rectangular flanged type 18G GI sheet casing complete with 22 G splitters consisting of 48 Kg/Cum density Minaral wool tissue facing with 26 G aluminum perforated sheet.

-

-

-

... More
Supply

10

-

-

... More
Erection

10

-

-

... More
Thermal Insulation for metal (Zinc-Aluminum Colour Coated Roofing Sheets) roofing : Thermal insulation with 25 mm thick EPS of minimum density 16 kg/cum , using suitable adhesive,etc. The maximum surface temperature of the material should withstand is 105° C and minimum temperature should be -20°C.

-

-

-

... More
Supply

900

-

-

... More
Erection

900

-

-

... More
Wire mesh and cowl for fresh air

-

-

-

... More
Supply

10

-

-

... More
Erection

10

-

-

... More
CPVC drain piping with required clamps,fittings, insulation and supports 40 mm dia

-

-

-

... More
Supply

60

-

-

... More
Erection

60

-

-

... More
CONTROL CUM DISTRIBUTION MCC PANEL: Supply, Erection, Testing and Commissioning of MV control cum distribution panel ( for AHU's, condensing units, reheaters ) of Indoor, free standing floor mounting type, 3 ph/415 V 4, wire dust and vermin proof by construction of 14 SWG CRCA sheets, treated with 7 tank process, painted with epoxy powder coating, compartmentalized, modular type with IP 42 Protection. Incomer: 1No - MCCB with ROHM arrangement, 1 Set of Current transformer, 1 No - Digital Multi data Meter with dual reading arrangement for volt, Amps, PF & Energy ,1 Set - LED type RYB indication lamps with control fuses , rated capacity Four Pole control MCB with neutral link. Outgoing - 1 ( 3 nos of A H U ) : 3 ph star-delta starter (fuse less protection) suitable MCCB, power contactor, bi-relay, timer, under voltage trip, overvoltage trip, single phase prevention, phase reversal unbalanced load trip relays, on/off push button, indicator lamps, auto manual operation . Outgoing - 2 ( 9 nos of condensing units-11 TR Cap.): Multiple feeders for Condensing units with rated/suitable TPNMCCB, suitable TPN Aluminium Bus Bar ( TPN+E Electrolyte grade) and associated accessories as required. The MCC panel shall have 2 spare cubicle one for the AHU and the other for condensing units. Include potential free contacts as and when required. MCC Panel suitable for 3 Nos X 33 TR AHU - 13200 CFM- 125 MM ST.PR, 9 nos. 11.0 TR DX air-cooled condensing units and ERV. a. __ TPN SDFU incomer – 1 No b. __ HP star delta starter with MCCB for condensing units - 9 Nos c. __ HP star delta starter with MCCB for blowers - 3 Nos. d.---- LED type RYB indication lamps on line side of Incomer with MCB – 1set e.----Trivector meter with Ethernet & RS485 connectivity of secure/Enercon make on the outgoing side of Incomer with MCB protection – 1Set Electrical control panel comprising starters for AHUs and control of condensing units . Including stategic control system with digital temp display.

-

-

-

... More
Supply

1

-

-

... More
Erection

1

-

-

... More
Electrical Cabling ( Power cabling):Supply, Installation, Testing & Commissioning of BIS Certified FRLS , PVC insulated Armoured Copper Power Cables of suitable ratings/sizes between the distribution board, outdoor units,heaters, AHU Units including lugs,crimping and terminations identifying labels duly clamped with Terminations.

-

-

-

... More
Supply

300

-

-

... More
Erection

300

-

-

... More
Electrical cabling (control Cabling): Supply, Installation and Testing of BIS certified PVC insulated Armoured FRLS copper control cable of suitable rating/size interconnecting the indoor and outdoor units.

-

-

-

... More
Supply

300

-

-

... More
Erection

300

-

-

... More
GI Cable Tray with cover - different sizes as per site requiremet

-

-

-

... More
Supply

200

-

-

... More
Erection

200

-

-

... More
GI Earthing: 25x3 mm GI flat laid in open fashion with necessary clamps , screws and interlinks etc for earthing of drives

-

-

-

... More
Supply

50

-

-

... More
Erection

50

-

-

... More
STRUCTURAL FABRICATED STEEL WORK: Supply, Fabrication , Cutting, Welding , Erection at site and painting of M. S. Angle structural steel work for required truss, AHU/ODU /Supporting structurer/etec. & as per site requirements, etc. based on the approved drawings. The work should be carried out as per good manufacturing and installation practices in concurrence with approved drawings. The structural steel materials should confirm to IS : 2062 (latest version) as per drawings. All welding electrodes to confirm to relevant IS codes. Fabrication and erection of the structural steel works shall be as per IS: 800 and welding work as per IS:816 and IS: 822. Finally all steel work to be painted with one coat of zinc chromate primer and two coats of Metal primer paint.

-

-

-

... More
Supply

3000

-

-

... More
Erection

3000

-

-

... More
Civil Works (RCC)

-

-

-

... More
Supply

20

-

-

... More
Erection

20

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.