Nuclear Fuel Complex Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Nuclear Fuel Complex - NFC Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date23 Nov 2023
Closing Date20 Dec 2023
Tender Amount₹ 22,60,000 
Notes
Download

Costs

Summary

Demolition Of Existing Old Sheds In Auto Section , General Services Plant At Nfc, Hyderabad. Tender Notice No.c/1321/2023

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling steel work of trusses in single sections of channels, angles Tees and flat including dismembering and stacking within 50 metres lead.

17000

-

-

... More
Credit for buyback of structural steel including loading, transportation out of NFC as per directions of EIC. Note: the dismantled structural steel members will be property of contractor and shall be taken out after clearance of EIC.

17000

-

-

... More
Dismantling aluminium/ Gypsum partitions, doors & windows including frame, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge.

1482

-

-

... More
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.

58

-

-

... More
Demolishing brick work in cement mortar manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.

425

-

-

... More
Demolishing cement concrete with flooring and skirting tiles manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.

162

-

-

... More
Demolishing/ removal of stone rubble masonry/soling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :

198

-

-

... More
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:

1070

-

-

... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared etc. complete as specified and directed.

1070

-

-

... More
Earth work in excavation in all soils by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.

49.79

-

-

... More
Lead charges upto 1KM or part thereof for additional lead over the initial lead of 50 m by mechanical transport, including loading, unloading, stacking, the disposable soil, rock , other unserviceable materials etc., Note: Measurement of lead charges will be based on truck measurement with a deduction of voids @20% and 50% for rock

-

-

-

... More
a) for soil and fine materials

300

-

-

... More
b) for rock, RR masoary , debris etc

746

-

-

... More
Removal of light fitting along with their down rods and other accessories carefully without causing any damage. The removed material should be shifted to an identified location about 500m away.

120

-

-

... More
Removal of ceiling fans / exhaust fans along with their down rods and other accessories carefully without causing any damage. The removed material should be shifted to an identified location about 500m away.

40

-

-

... More
Credit for buyback of dismantled window/ exhaust opening frames in existing condition with window shutter board upto size of 6 Sqm made of MS/wooden/aluminium/glass etc including loading, transportation out of NFC as per directions of EIC. Note: the contractor can make site visit to access the condition of windows before quoting the rate. Dismantled window frame and shutter will be property of contractor and shall be taken out after clearance of EIC.

40

-

-

... More
Credit for buyback of dismantled door frames in existing condition along with door shutter board upto size of 4 Sqm made of MS/wooden/aluminium/WPC/glass etc in existing condition including loading, transportation out of NFC as per directions of EIC. Note: the contractor can make site visit to access the condition of windows before quoting the rate. The dismantled door frame and shutter will be property of contractor and shall be taken out after clearance of EIC.

38

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.