Nuclear Fuel Complex Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Nuclear Fuel Complex - NFC Tender

Works
Electrical Goods and Equipments
Electrical and Electronics
Eprocure
Opening Date14 Jun 2022
Closing Date11 Jul 2022
Tender Amount₹ 1,00,98,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
11 TR Capacity - Air Cooled condensing units

-

-

-

... More
SUPPLY

8

-

-

... More
ERECTION

8

-

-

... More
Refrigerant Hard Copper piping i.e. Liquid line & Suction line with necessary elbows, fittings, service valves, drier filter/catch all filter , thermostatic expansion valves with isolation valves, nitrile rubber insulation , clamping, supporting structure ( GI perforated tray) with grouting ,  from AHU to 11 TR Condensing Units ( Sizes of Hard Copper pipings & insulation are as per OEM recommendations )- Entire copper tubing shall be insulated as per detailed specs.

-

-

-

... More
SUPPLY

160

-

-

... More
ERECTION

160

-

-

... More
N2 Pressure Testing, Vaccum & refrigerant charging i.e. R-407C/R-410A  for item  no 1 & 2

8

-

-

... More
Ducting of GI ducting of 20 guage, along with suitable  supporting MS angle structure along with flanges , gaskets, sealant complete as per detailed specifications

-

-

-

... More
SUPPLY

300

-

-

... More
ERECTION

300

-

-

... More
Ducting of GI ducting of 22 guage, along with suitable  supporting MS angle structure along with flanges , gaskets, sealant complete as per detailed specifications

-

-

-

... More
SUPPLY

250

-

-

... More
ERECTION

250

-

-

... More
Ducting of GI ducting of 24 guage, along with suitable  supporting MS angle structure along with flanges , gaskets, sealant complete as per detailed specifications

-

-

-

... More
SUPPLY

250

-

-

... More
ERECTION

250

-

-

... More
ACOUSTIC INSULATION OF DUCTS : Supply and Application of Acoustic insulation for the initial portion of supply air ducting. Material of construction shall be fibre-free elastomeric nitrile rubber foam with open cell structure . The density of the same shall be within 140-180 Kg/m3. The material should have a thermal conductivity not exceeding 0.050 W/mK. The maximum surface temperature the material should withstand is 105° C and minimum temperature should be -20°C. The material should conform to Class 1 rating for surface spread of Flame as per BS 476 Part 7. The insulation material shall be shall be stuck to the cleaned duct surface by factory pre-fixed cold adhesive. The material and installation methodology should be in accordance with the specifications. Thickness of insulation:25mm.

-

-

-

... More
SUPPLY

300

-

-

... More
ERECTION

300

-

-

... More
THERMAL INSULATION OF DUCTS (INDOOR) :  Supply and Application of External Thermal Insulation of Supply Air ducting. Material of construction shall be cross linked polyolefin/ polyethelene foam material with closed cell structure and with factory applied reinforced aluminium foil. The density of the same shall be within 25 Kg/m3.The material should have a thermal conductivity not exceeding 0.032 W/mK. The insulation material shall be shall be stuck to the cleaned duct surface by factory pre-fixed cold adhesive. The material and installation methodology should be in accordance with the specifications. Thickness of insulation:25mm.

-

-

-

... More
SUPPLY

400

-

-

... More
ERECTION

400

-

-

... More
THERMAL INSULATION OF DUCTS (OUTDOOR ):  Supply and Application of External Thermal Insulation of Supply Air and return air ducting coming out side. Material of construction shall be cross linked polyolefin/polyethylene foam material with closed cell structure and with factory applied reinforced aluminium foil. The density of the same shall be within 25 Kg/m3.The material should have a thermal conductivity not  exceeding 0.032 W/mK. The insulation material shall be shall be stuck to the cleaned duct surface by factory pre-fixed cold adhesive. The finishing will be carried out with fixing 200 gsm glass cloth with the help of adhesive Fevicol lag coating (AF 5590) . Finally it will be painted with synthetic enamel paint. The material and installation methodology should be in accordance with the specifications. Insulation shall be of 25 mm thick with 200 GSM glass cloth finishing.

-

-

-

... More
SUPPLY

400

-

-

... More
ERECTION

400

-

-

... More
Remote Control units to operate each AHU &  Condensing units with communication cable from MCC to AHU /Control unit. 

-

-

-

... More
SUPPLY

2

-

-

... More
ERECTION

2

-

-

... More
POWER CABLING S :  Power supply cable ( Armoured , PVC insulated & FRLS) from MCC Panel  to AHU & Condensing Units  with  GI wire for earthing. ( Power supply cable sizes shall be as per OEM recommendations for AHU's & Condensing units) .

-

-

-

... More
SUPPLY

200

-

-

... More
ERECTION

200

-

-

... More
CONTROL CABLING :  Control cable  of BIS certified PVC insulated Armoured FRLS copper control cable OF suitable rating/size interconnecting the  AHU / Condensing units/MCC /  Remote controller, etc. as per site requirements.

-

-

-

... More
SUPPLY

200

-

-

... More
ERECTION

200

-

-

... More
GI Earth strip of 3mm thick one inch flat

-

-

-

... More
SUPPLY

100

-

-

... More
ERECTION

100

-

-

... More
CONTROL CUM DISTRIBUTION MCC PANEL: Supply, Erection, Testing and Commissioning of MV control cum distribution panel ( for AHU's, condensing units, reheaters ) of Indoor, free standing floor mounting type, 3 ph/415 V 4, wire dust and vermin proof by construction of 14 SWG CRCA sheets, treated with 7 tank process, painted with epoxy powder coating, compartmentalized, modular type with IP 42 Protection. Incomer: 1No - MCCB with ROHM arrangement, 1 Set of Current transformer, 1 No - Digital Multi data Meter with dual reading arrangement for volt, Amps, PF & Energy ,1 Set - LED type RYB indication lamps with control fuses , rated capacity Four Pole control MCB with neutral link. Outgoing - 1 ( 2 nos of A H U) : 3 ph star-delta starter (fuse less protection) suitable MCCB, power contactor, bi-relay, timer, under voltage trip, overvoltage trip, single phase prevention, phase reversal unbalanced load trip relays, on/off push button, indicator lamps, auto manual operation . Outgoing - 2 ( 8 nos of condensing units-11 TRCap.): Multiple feeders for Condensing units with rated/suitable TPNMCCB, suitable TPN Aluminium Bus Bar ( TPN+E Electrolyte grade) and associated accessories as required. The MCC panel shall have 2 spare cubicle one for the AHU and the other for condensing units. Include potential free contacts as and when required. MCC Panel suitable for 2 Nos 44 TR AHU-17600 CFM-100 MM ST.PR, 8 nos. 11.0 TR DX air-cooled condensing units and ERV. a. __ TPN SDFU incomer – 1 No b. b. __ HP star delta starter with MCCB for condensing units - 8 Nos c. __ HP star delta starter with MCCB for blowers - 2 Nos. d. --LED type RYB indication lamps on line side of Incomer with MCB – 1set e. ---Trivector meter with Ethernet & RS485 connectivity of secure/Enercon make on the outgoing side of Incomer with MCB protection – 1Set

-

-

-

... More
SUPPLY

1

-

-

... More
ERECTION

1

-

-

... More
Aluminium SA grills : Supply & Installation of Aluminium powder coated ( of minimum thickness of 0.8mm )Four Way Diffuser with Valume Control  dampers for Supply Air 

-

-

-

... More
SUPPLY

8

-

-

... More
ERECTION

8

-

-

... More
Aluminium RA grills : Supply & Installation of Aluminium powder coated ( of minimum thickness of 0.8mm )

-

-

-

... More
SUPPLY

8

-

-

... More
ERECTION

8

-

-

... More
DAMPERS:  Supply, installation, testing and commissioning of Factory fabricated low leakage volume control/duct dampers of  Aerofoil-blade Aluminium dampers

-

-

-

... More
SUPPLY

7

-

-

... More
ERECTION

7

-

-

... More
Fir dampers :  Fusible link type Galvanised Sheet fire dampers of atleast 90 minutes of fire rating with limit switch

-

-

-

... More
SUPPLY

3

-

-

... More
ERECTION

3

-

-

... More
WIRE MESH : Supply & erection of suitable wire mesh and cowl for fresh air

-

-

-

... More
SUPPLY

5

-

-

... More
ERECTION

5

-

-

... More
STRUCTURAL FABRICATED STEEL WORK: Supply, Fabrication , Cutting, Welding , Erection at site and painting of M. S. Angle structural steel work for required truss,  AHU/ODU /Supporting structure/etc. & as per site requirements, etc. based on the approved drawings. The work should be carried out as per good manufacturing and installation practices in concurrence with approved drawings. The structural steel materials should confirm to IS : 2062 (latest version) as per drawings. All welding electrodes to confirm to relevant IS codes. Fabrication and erection of the structural steel works shall be as per IS: 800 and welding work as per IS:816 and IS: 822. Finally all steel work to be painted with one coat of zinc chromate primer and two coats of synthetic enamel paint.

-

-

-

... More
SUPPLY

5000

-

-

... More
ERECTION

5000

-

-

... More
GI Cable Tray perforated ladder type

-

-

-

... More
SUPPLY

100

-

-

... More
ERECTION

100

-

-

... More
CPVC drain Pipe : Hard PVC drain piping insulated out of class O closed cell elastomeric nitrile rubber material with U trap. Etc.

-

-

-

... More
SUPPLY

60

-

-

... More
ERECTION

60

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.