Nizamabad District Cooperative Central Bank Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Nizamabad District Cooperative Central Bank Limited Tender

Works
Civil And Construction
Building Construction
Opening Date18 Oct 2024
Closing Date21 Oct 2024
Tender Amount₹ 24,74,298 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Civil Work;Supply and Fixing of MS Grills of size 1.50 x 1.20 with 35mm x 35mm x 3mm thick equal L angles and 16mm square rods @ 100mm c/c fixing in position ,complete for finsihed item of work

2

4056

8113

... More
Civil Work;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding doors with mesh shutter ? (2- glass shutters and 1-mesh shutter)- 95 - Series duly manufactured using UPVC reinforced profiles (Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (108 mm x 45 mm)/(95.50 mm x 60 mm) x 2.20 mm for outer frames, (75 mm x 39 mm)/(66 mm x 42 mm) x 2.20 mm for sliding door shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be co-extruded with Grey colour soft PVC. Mesh shutter shall be made of (48 mm x 30 mm))/(50 mm x 26.5 mm) x 2.0 mm uPVC profile section and fitted with Vinyl Coated Fibre mesh and rollers/pulley duly fixed with TPV Gaskets weathering seal resistant Door shall be provided with standard hardware & multi point locking system of Patio/Roto espagulate and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work.

6.48

8564

55497

... More
Civil Work;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm dia nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special spn: 1108

17.39

5217

90727

... More
Civil Work;Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat molded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Paneling of 5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-incharge, manufacturer?s specification & drawing for finished item of work .

1.5

2604

3906

... More
Civil Work;Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x 47mm with a wall thickness of 5mm, made out of extruded 10 mm rigid PVC foam sheet, mitre cut at two corners and joined with 2nos. of 150mm long brackets of 15x15mm M.S. square tube. The two vertical door profiles are to be reinforced with 19x19mm M.S. Square tube of 19 gauge. The door frame shall be fixed to the wall using 65/100mm long M.S. Screws through the frame by using PVC fasteners. A minimum of 4nos. of screws to be provided for each vertical member & minimum 2nos. for horizontal member etc. complete as per manufacturers specification and direction of Engineer-in-Charge for finished item of work

4.75

357

1700

... More
Civil Work;Providing and applying synthetic plaster putty or plaster of paris putty or lime punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even and smooth after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, applying emery paper, Sand the surface, clean & wipe off loose dust, applying knifing paste filler by putty knife / muslin pad, air dry for 2 - 3 hrs, sand with 180 and 320 No., emery paper for the surface preparation including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work for Internal wallsProviding Putty to internal walls

266.72

251

66995

... More
Civil Work;Providing skirting to internal walls to 10 cm height with vitrified tiles 8mm thick , regular finish and normal colour, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc.,and overheads & contractors profit complete for finished item of work.(APSS No.701 &707)

6.26

864

5411

... More
Civil Work;Flooring with Supply of Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 800 x 800 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

97.37

1146

111610

... More
Civil Work;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes except GST on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904)

561.15

434

243752

... More
Civil Work;Reinforced cement mortar Facia 5 cm thick in CM (1:3) for drop walls, Fins & staircase railing with rabbit wire mesh & nominal reinforcement as directed by Engineer-in-charge with dubara spong finishing including cost & conveyence of all materials to site, including seigniorage charges, sales and other taxes on all materials and all operational, incidental charges such as labour charges, like mixing cement mortar, scaffolding charges, lift charges, curing, for making 50 mm thick RCM Paradah walls (RCM Drop walls) including tying Rabbit (chicken) wire mesh to the existing mild steel / HYSD Steel reinforcement applying mortar lumps, finishing, plastering to both faces, sponge finishing etc complete for finished item of work but excluding cost of steel and its fabrication charges in All Floors

2.17

1770

3843

... More
Civil Work;Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement : Screened sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, including sales & other taxes except GST on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504).

37.8

7601

287342

... More
Civil Work;Providing impervious coat to exposed RCC roof slab surfaces to required slopes with CM (1:3) prop.20mm thick mixed with water proofing compound at 1 Kg per one bag of cement, laid over roof slab when it is green, including cost and conveyance of all materials and labour charges etc complete for finished item of work. (APSS No. 901 & 903).(BLD-CSTN-8-25)

145.26

558

81192

... More
Civil Work;Filling with gravel in trenches, sides of foundations and basement with initial lead including cost and Cost and Conveyance of labour charges etc., complete for finished item of work. (APSS NO. 309 & 310)

254.52

245

62580

... More
Civil Work;Providing High Yield Strength Deformed (HYSD) /Thermo mechanically Treated (TMT)/Mild steel (MS) steel bars (Fe 415/Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including soverhead charges & Contractors profit but exlcuding GST and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126)

5.59

78667

439577

... More
Civil Work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth). For Sunshades

1.08

641

693

... More
Civil Work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth). For Lintels

0.19

13456

2557

... More
Civil Work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth). For Roof Slab 125mm thick

151.56

1491

226035

... More
Civil Work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth). For Roof Beams

6.4

12492

79950

... More
Civil Work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth). For RCC Strong Room Wall 200 mm thick

62.38

5161

321963

... More
Civil Work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth) For Columns

5.15

13481

69432

... More
Civil Work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth). For Plinth Beams

4.51

12992

58594

... More
Civil Work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth).For Pedestals

2.59

10682

27667

... More
Civil Work;Supply and placing of the VRCC M20 Design mix Concrete corresponding to Table 9 of IS 456 using Concrete Mixer with 20mm size graded machine crushed HG metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. For FOUNDATIONS, PLINTH, PEDESTALS (Below Plinth).For Footings

6.68

9986

66710

... More
Civil Work;Plain Cement concrete (1:5:10) using 40 mm metal with Concrete mixture. All work upto plinth level including c/c of all material and labour charges ertc complete for finished item of work.

17.45

4301

75059

... More
Civil Work;Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level.All work upto plinth level including c/c of all material and labour charges ertc complete for finished item of work..

2.7

4496

12140

... More
Civil Work;Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 3m in Loamy & Clayey Soils like BC Soils, Red Earth & Ordinary Gravelly Soils ( SS 20-B) including all operational incidental labour charges etc., complete for finished item of work including seignerage charges etc., complete for Foundation of Building.(APSS No. 308)

45.32

439

19919



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.