For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 40,592Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
586361Tender No
E1/Tender/599/2024-25/21Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Compound wall;Jungle Jim L X W X H : 6.0Ft X 6.0 Ft. X 8.50 Ft, : All pipes are MS Class-B any ISI Make ( as directed by the Engineer- in- charge)
1
52700
52700
... More
Compound wall;(Globe) L X W X H : 12.0Ft X 12.0 Ft. X 6.0 Ft, : All pipes are MS Class-B any ISI Make ( as directed by the Engineer- in- charge)
1
69000
69000
... More
Compound wall;Double Swing 2 Seater (Seats FRP along with Pigment Paints) L X W X H : 10.5 Ft X 6.0 Ft. X 10.0 Ft,: All pipes are MS Class-B any ISI Make ( as directed by the Engineer- in- charge)
2
25500
51000
... More
Compound wall;Merry go round 6 seater along with Pigment Paints L X W X H : 5.0Ft X 5.0 Ft. X 5.0 Ft,: All pipes are MS Class-B any ISI Make ( as directed by the Engineer- in- charge)
1
30200
30200
... More
Compound wall;Spring Horse: L X W X H : 2.0Ft X 2.0 Ft. X 2.0 Ft, : All pipes are MS Class-B any ISI Make ( as directed by the Engineer- in- charge)
1
20500
20500
... More
Compound wall;BLD-CSTN-2-8 (16) : Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) "Development of Amberpeta tank Bund in madhira Municipality under TUFIDC Assistance" ENC(PH) R.No. 129/2021-2022, Dated: 12-10-2021
270
1180
318845.7
... More
Compound wall;laying of turfed Synthetic Royal Grass Artificial
150
1650
247500
... More
Compound wall;Tummy Twister 2 Persons, The Material used in this Products are Mild Steel and Stain Less Steel ( as directed by the Engineer- in- charge)
1
44000
44000
... More
Compound wall;Vertical Shoulder Wheel 2 persons, The Material used in this Products are Mild Steel and Stain Less Steel ( as directed by the Engineer- in- charge)
1
33500
33500
... More
Compound wall;Tai Chi Spinners 2 persons, The Material used in this Products are Mild Steel and Stain Less Steel ( as directed by the Engineer- in- charge)
1
40500
40500
... More
Compound wall;Leg Press 2 persons , The Material used in this Products are Mild Steel and Stain Less Steel ( as directed by the Engineer- in- charge)
1
63500
63500
... More
Compound wall;Chest press /Pull down Challenger , The Material used in this Products are Mild Steel and Stain Less Steel ( as directed by the Engineer- in- charge)
1
85500
85500
... More
Compound wall;Air Swing 2 persons, The Material used in this Products are Mild Steel and Stain Less Steel ( as directed by the Engineer- in- charge)
1
44500
44500
... More
Compound wall;Air Walker 2 persons, The Material used in this Products are Mild Steel and Stain Less Steel ( as directed by the Engineer- in- charge)
1
58000
58000
... More
Compound wall;BLD-CSTN-3-12-(29) Using Concrete mixture up to Plinth Level : Plain Cement concrete (M 15) Nominal Mix 1:2.5:5 (Cement : fine aggregate: coarse aggregate ) using 20mm graded metal of Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.
22.5
6287
141458.62
... More
Compound wall;RBR-FNDN-4 I(i) : Providing P.C.C grade M 10 concrete in open foundations using 20 mm Graded HBG hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH for foundation and under flooring bed.
15
5740
86107.2
... More
Compound wall;RBR-FNDN-1: Earth work excavation in Ordinary Soil by Manual Means Upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH.
15
285
4280.4
... More
Compound wall;The Cast Iron ornamental Gazebo of size 10? X 10? feet. The Main fabricated in 80mm X 40mm .The 75mm X25mm Welded to main frame with four sides slopes . The 25mm X25m sq MS pipes welded to four sides for fixing the clay Manglore tiles. The bottom of main frame the cast iron Ornamental Arches will be fixed to four vertical poles on Top. The 8? feet height MS 3 ½? round MS pipe with cast Iron ornamental design Heavy Base fixed to bottom of poles. Including erection with enamel paint.
2
325000
650000
... More
Compound wall;BLD-CSTN-9-7-(105) :Flooring with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black slabs set over base coat of cement mortar (1:8), 20 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tilesetc., complete, labour charges for dressing of tilesetc., complete for finished item of work,including the cost and conveyance of all materials.
64.4
5266
339190.29
... More
Compound wall;BLD-CSTN-4-1-(34) ; Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work in all floors.( APSS No.126
324
77
25045.2
... More
Compound wall;BLD-CSTN-2-8 (16) : Filling with gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
21.7
515
11178.32
... More
Compound wall;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 225 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.
13.34
7231
96461.54
... More
Compound wall;For Columns
1.94
15332
29745.96
... More
Compound wall;For Footing
3.46
11511
39829.03
... More
Compound wall;BLD-CSTN-3-5 (22) : Plain Cement concrete M10 using 20mm size graded Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work. under flooring bed
7.93
5740
45522.01
... More
Compound wall;RBR-FNDN-1: Earth work excavation in Ordinary Soil by Manual Means Upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH
7.84
285
2237.22
... More
Compound wall;Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade II making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912.
778.5
273
212771.83
... More
Compound wall;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, seigniorage charges, all operational, including charges, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)
778.5
594
462569.13
... More
Compound wall;BLD-CSTN-5-4-(42): Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., to site cost of Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work
10.35
8372
86653.62
... More
Compound wall;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work.( APSS No.126).
133.27
77
10301.77
... More
Compound wall;For Slab
1.25
11337
14171.5
... More
Compound wall;For Columns
0.7
15332
10733.08
... More
Compound wall;For Plinth Beam
0.28
14756
4131.71
... More
Compound wall;For Footing
1.2
11511
13813.54
... More
Compound wall;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, including labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .
10.13
5611
56819
... More
Compound wall;RBR-FNDN-1: B i: Earthwork excavation in ordinary soil by mechanical means up to 3 mts depth for structures as per drawing and technical specifications Clause 305.1 including disposal upto a lead of 50 m, dressing of sides and bottom as per Technical Specification 305 MORD / 304 MORTH.
13.5
128
1731.1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%