Municipality Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Drainage Work
Opening Date27 Mar 2025
Closing Date2 Apr 2025
Tender Amount₹ 26,14,905
Costs
EMD
₹ 26,149Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
585374Tender No
E2/2780-91/2024Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
RCC Pipeline;Carting of surplus earth including loading, unloading and conveyance upto 3kms including labour charges RBR-FNDN-2
60.6
157
9528.74
... More
RCC Pipeline;Plain Cement concrete (1:3:6) using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, Centering and laying concrete in under bed and side walls, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4 Side wall
27.6
7018
193707.56
... More
RCC Pipeline;Plain Cement concrete (1:3:6) using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, Centering and laying concrete in under bed and side walls, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4 For base Slab
7.58
5006
37947.53
... More
RCC Pipeline;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) under bed using veyance of all materials like cement, sacrushed granite from approved to site, including seigniorage chate in aggregate 40mm size machine crushed granite from approved quarry including cost and con charges. sales & other taxes on all materials and including all charges for machine mixing, laying conceplete under bed, ramming in 15 cm layers finiscinding all thee to the required level curing etc., complete for finished item of work. (APSS No. 402)-BLD-CSTN-3-5
10.1
4410
44543.32
... More
RCC Pipeline;Earthwork in excavation for roadway in soil and drains as per trawing and technical specifications Clause 305.1 including setting out, removal of stumps and other jelas per drawing and dispenal upto a lead of 50 m, etc complete for where depth is less than 1.50 times the width (RBR-FNDN-1)
75.75
285
21616.02
... More
RCC Pipeline;Laying Plain Cement concrete (1:2:4) using 20 mm graded metal with crushed as per SS-3 mechanically mixed and placed and compacted by vibration and including curing for 21 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications etc. for CC pavement. RBR-FNDN-4
22.5
5498
123706.8
... More
RCC Pipeline;Constructing 914.4 mm x 457.2 mm (3'0"x1'6") brick in CM 1:6 prop Masonry Inspection chamber up to 914.4 mm (30") and fitted with light weight 457.2 mm x 457.2 mm (3'0"x1'6") CI frame and cover of 20
35
8707
304768.1
... More
RCC Pipeline;Supply, delivery, lowering of 300 mm dia. RCC NP2 Class S/S pipes carefully into the ready made trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985, etc. complete - 1 Rmt.450mm dia
140
1625
227621.8
... More
RCC Pipeline;Supply, delivery, lowering of 300 mm dia. RCC NP2 Class S/S pipes carefully into the ready made trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985, etc. complete - 1 Rmt.300mm dia
210
1062
223068.3
... More
RCC Pipeline;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) under bed using veyance of all materials like cement, sacrushed granite from approved to site, including seigniorage chate in aggregate 40mm size machine crushed granite from approved quarry including cost and con charges. sales & other taxes on all materials and including all charges for machine mixing, laying conceplete under bed, ramming in 15 cm layers finiscinding all thee to the required level curing etc., complete for finished item of work. (APSS No. 402)-BLD-CSTN-3-5
21
4410
92614.83
... More
RCC Pipeline;Carting of surplus earth including laoding unloading and conveyance upto 3kms including all labour charges RBR-FNDN-2
126
157
19812.24
... More
RCC Pipeline;Earthwork in excavation for roadway in soil and drains as per trawing and technical specifications Clause 305.1 including setting out, removal of stumps and other jelas per drawing and dispenal upto a lead of 50 m, etc complete for where depth is less than 1.50 times the width (RBR-FNDN-1)
157.5
285
44944.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements