For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Drainage Work
Opening Date27 Mar 2025
Closing Date2 Apr 2025
Tender Amount₹ 26,14,905 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC Pipeline;Carting of surplus earth including loading, unloading and conveyance upto 3kms including labour charges RBR-FNDN-2

60.6

157

9528.74

... More
RCC Pipeline;Plain Cement concrete (1:3:6) using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, Centering and laying concrete in under bed and side walls, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4 Side wall

27.6

7018

193707.56

... More
RCC Pipeline;Plain Cement concrete (1:3:6) using 20 mm HBG graded metal machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for machine mixing, Centering and laying concrete in under bed and side walls, compacted by vibration including curing for 14 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. RBR-FNDN-4 For base Slab

7.58

5006

37947.53

... More
RCC Pipeline;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) under bed using veyance of all materials like cement, sacrushed granite from approved to site, including seigniorage chate in aggregate 40mm size machine crushed granite from approved quarry including cost and con charges. sales & other taxes on all materials and including all charges for machine mixing, laying conceplete under bed, ramming in 15 cm layers finiscinding all thee to the required level curing etc., complete for finished item of work. (APSS No. 402)-BLD-CSTN-3-5

10.1

4410

44543.32

... More
RCC Pipeline;Earthwork in excavation for roadway in soil and drains as per trawing and technical specifications Clause 305.1 including setting out, removal of stumps and other jelas per drawing and dispenal upto a lead of 50 m, etc complete for where depth is less than 1.50 times the width (RBR-FNDN-1)

75.75

285

21616.02

... More
RCC Pipeline;Laying Plain Cement concrete (1:2:4) using 20 mm graded metal with crushed as per SS-3 mechanically mixed and placed and compacted by vibration and including curing for 21 days complete but excluding cost of steel and its fabrication charges for finished item of work as per drawings and technical specifications etc. for CC pavement. RBR-FNDN-4

22.5

5498

123706.8

... More
RCC Pipeline;Constructing 914.4 mm x 457.2 mm (3'0"x1'6") brick in CM 1:6 prop Masonry Inspection chamber up to 914.4 mm (30") and fitted with light weight 457.2 mm x 457.2 mm (3'0"x1'6") CI frame and cover of 20

35

8707

304768.1

... More
RCC Pipeline;Supply, delivery, lowering of 300 mm dia. RCC NP2 Class S/S pipes carefully into the ready made trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985, etc. complete - 1 Rmt.450mm dia

140

1625

227621.8

... More
RCC Pipeline;Supply, delivery, lowering of 300 mm dia. RCC NP2 Class S/S pipes carefully into the ready made trenches laying them true to alignment and gradient, jointing with rubber rings and testing including filling with water lead upto 500 meters including cost of rubber rings as per BIS No. 783/1985, etc. complete - 1 Rmt.300mm dia

210

1062

223068.3

... More
RCC Pipeline;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) under bed using veyance of all materials like cement, sacrushed granite from approved to site, including seigniorage chate in aggregate 40mm size machine crushed granite from approved quarry including cost and con charges. sales & other taxes on all materials and including all charges for machine mixing, laying conceplete under bed, ramming in 15 cm layers finiscinding all thee to the required level curing etc., complete for finished item of work. (APSS No. 402)-BLD-CSTN-3-5

21

4410

92614.83

... More
RCC Pipeline;Carting of surplus earth including laoding unloading and conveyance upto 3kms including all labour charges RBR-FNDN-2

126

157

19812.24

... More
RCC Pipeline;Earthwork in excavation for roadway in soil and drains as per trawing and technical specifications Clause 305.1 including setting out, removal of stumps and other jelas per drawing and dispenal upto a lead of 50 m, etc complete for where depth is less than 1.50 times the width (RBR-FNDN-1)

157.5

285

44944.2



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.