Municipality Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
461442Bid Award Id
ViewTender No
E1/MCM/SUB CENTRE/W.NO 10/15THFCG/23Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
CONSTRUCTION OF SUB CENTRE;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 402).
12.5
4430
55383
... More
CONSTRUCTION OF SUB CENTRE;Supply and placed of the M-20 Design Mix concrete coorespoding to IS 456 usinng WEIGH Bather with 20mm size graded machine crushed hard granite
-
-
-
... More
CONSTRUCTION OF SUB CENTRE;FOOTINGS ::
5.85
10134
59287.53
... More
CONSTRUCTION OF SUB CENTRE;PEDASTALS ::
1.46
10796
15763.28
... More
CONSTRUCTION OF SUB CENTRE;PLINTH BEAM ::
4.32
13007
56192.36
... More
CONSTRUCTION OF SUB CENTRE;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage charges, for finished item of work for Foundations
6.12
13569
83043.93
... More
CONSTRUCTION OF SUB CENTRE;Plain Cement Concrete corresponding to M7.5 grade as per IS 456 equivalent to (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Blasted Granite (IS383, 1970) metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete but excluding seigniorage charges, for finished item of work for Foundations
-
-
-
... More
CONSTRUCTION OF SUB CENTRE;ROOF SLAB 125MM THICK ::
11.49
11876
136461.9
... More
CONSTRUCTION OF SUB CENTRE;ROOF BEAM ::
4.21
12415
52268.62
... More
CONSTRUCTION OF SUB CENTRE;LINTEL ::
0.67
13552
9080.45
... More
CONSTRUCTION OF SUB CENTRE;Supply and placing of the VRCC M20 Nominal mix Concrete corresponding to Table 9 of IS 456 using with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as , machine mixing, laying concrete, curing, including contractor profit and over head charges etc.,complete but excluding cost of steel and its fabrication charges for finished item of work with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding GST and seignorage charges for finished item of work. for Sunshades 75 mm thick at fixed end 50 mm thick at free end
9
924
8324.91
... More
CONSTRUCTION OF SUB CENTRE;Providing brick work of 230 mm thick in CM Prop using common burtn clay Briks as per table
38.82
7912
307166.74
... More
CONSTRUCTION OF SUB CENTRE;Plastering to brick masonary wall with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding GST and seignorage charges, etc., complete for for finished item of work. (APSS 901,903 & 904) (CSSR) for Internal Walls.
286.08
499
143014.25
... More
CONSTRUCTION OF SUB CENTRE;Plastering to brick masonary wall with 20mm thick double coat in CM (1:6) 16 mm thick base coat and CM (1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit,
158.76
519
82452.01
... More
CONSTRUCTION OF SUB CENTRE;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, including the cost and conveyance of all materials.
63.65
1239
78864.26
... More
CONSTRUCTION OF SUB CENTRE;Floooring with ceramic non sked tiles of not less thatn 7.3mm thick 1st quality laid over floor bed / VRCC slab set over 12.0mm thic CM 1:8 prop base coat and near grey cement slurry
6.67
925
6169.88
... More
CONSTRUCTION OF SUB CENTRE;Providing dadoong to walls with 5 to 7mm ceramic wall tiels 1st
-
-
-
... More
CONSTRUCTION OF SUB CENTRE;Supplyand fixing of salwood Door single shutter fully panneled door of size 1.20x2.10 mts with frame of sal wood scantling of size 100x 75 and botton reper of size 75x38mm and shutter of side rails
1
14508
14508.53
... More
CONSTRUCTION OF SUB CENTRE;Supply and fixing of salwood Door single shutter fully panelled door of size 0.90x2.10 mts with frame of sal
2
13969
27938.92
... More
CONSTRUCTION OF SUB CENTRE;Supply and fixing of salwood Door single shutter fully panelled door of size 0.75x2.10 mts with frame of sal
1
9588
9588.03
... More
CONSTRUCTION OF SUB CENTRE;Providing and fixing of casement/ open able windows made of pre painted steel as par IS513 of 0.58 mm thick galvanized as per IS 277 finish painted with a polyester paint and section for outer frame of 48x50 mm centre multion of 48x500mm
2.88
8266
23807.89
... More
CONSTRUCTION OF SUB CENTRE;Providing High Yield strength Deformed (HYSD) Steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC Works, including labour charges for stagtenin, cutting bending to required sized
3.22
88490
284938.38
... More
CONSTRUCTION OF SUB CENTRE;Providing impervious coat to exposed RCC slab surface to required slopes with CM 1:3 prop using screened sand 20mm thick average mixed with integral cement water proofing liquied confirminig to IS 2645-2003 manufactured by reputed manufactures as approved by Enginer-in chargea
91.9
566
52016.32
... More
CONSTRUCTION OF SUB CENTRE;Filling with carted gravel by manual means in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., and overheads & contractors profit complete for fnished item of work. (APSS NO. 309 & 310)
40.56
230
9343.34
... More
CONSTRUCTION OF SUB CENTRE;Supply and Laying of 25mm outer dia heavy (2.20mm thickness) grade with IS:9537 part 3 regid PVC pipe of makes Sudhakar / Maco Plast / Modi. make concealed in Roof Slabs with all required PVC / Metallic Deep Boxes including masonary work and labour charges etc., complete including masonary work, including cost and conveyance of all material, all labour charges, and contractor profit etc., complete but excluding VAT.
80
101
8147.2
... More
CONSTRUCTION OF SUB CENTRE;Supply and laying of 25mm dia 1.8mm thick P.V.C.pipe ISI mark of Sudhakar / Maco Plast / Modi make concealed in wall with PVC / Metallic junction boxes and all required accessories including masonary work for light, fan and separate plug point with supply and fixing of suitable size Metallic deep box including all labour charges etc., complete including masonary work, including cost and conveyance of all material, all labour charges, and contractor profit etc., complete but excluding VAT.
120
113
13590