Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Road Construction
Opening Date12 Jul 2024
Closing Date20 Jul 2024
Tender Amount₹ 7,85,026 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Laying of cc road;BLD-CSTN-9-21-(119) :Providing cladding with High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work, Note: (b) For dadooing or cladding items, data for relevant Skirting Items may be adopted adding the cutting charges of the stones/ tiles as the case may be)

1.13

3858

4360.5

... More
Laying of cc road;Construction of Specification Stone Masonry Pedestal with earth work excavation, PCC bed, RR Masonry, Brick Work, Plastering, White washing and polished shabad flooring suitable for fixing granite stone of size 2.5' x 5' including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges, etc., complete for finished item of work.

1

9413

9413.12

... More
Laying of cc road;Repairs/Raising of existing manhole of 0.9 dia upto 0.45mt depth with Moulded / 2nd class traditional bricks in CM (1:4) including Internal plastering 20mm thick in CM (1:3) and External Plastering 20mm thick CM (1:3) and top benching in CC (1:2.5:5) including cost and conveyance of all materials and labour, Seigonarage charges, Curing ana all taxes etc., complete

22

1672

36790.82

... More
Laying of cc road;Saw Cut Joints Freshly laid Concrete pavement including all materials and labour charges(Grooves 2-3mm) TBSC-T.1-15

140

97

13679.4

... More
Laying of cc road;Amendment 2021-22 BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

33.6

469

15765.12

... More
Laying of cc road;Amendment 2021-22 BLD-CSTN-2-8 (16) : Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

32.4

469

15202.08

... More
Laying of cc road;Vaccum Drying of freshly laid cement concrete floor using 100 % air tight suction mat of suitable size length,vaccum pump maintain vaccum pressure @ 0.7 o 0.8 atmosphere as per the standard procedure, floating with power floating mechanical travelling finishing with sound edges and concerns including hire and operational charges machinery ,labour ,fuel etc.,complete for finished item of work as directed by the engineer - in- charge of the work.

540

75

40500

... More
Laying of cc road;Supply and placing of Ready Mix Concrete M 30 as per IS-4926:2003 of following grades with minimum cement content as per IS-456:2000 and Standard mix design as per IS-10262:1982, with coarse aggregate of nominal size 20mm and fine aggregate of Zone II as per the mix design approved by the Department from Standard suppliers including cost and conveyance, vertical pumping and Horizontal pumping on all materials, etc., works for basic cost including leveling, grading, spreading, curing for 21 days, centring, vibrating, compacting, finishing etc., as required including, material taxes, pumping, transportation, approved admixture etc., complete.(RMC-M30) Note:The quantities for cement, coarse aggregates and fine aggregates are for estimating purpose only. The exact quantities will be as per mix design.

81

5636

456534.63

... More
Laying of cc road;RBR- SBBS-11B Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

85.05

2112

179674.08

... More
Laying of cc road;RBR-EECD-8(c) : Earthwork excavation for road way in soil by mechanical means including cutting and pushing the earth to side of embankment upto a lead of 100 metres including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections etc., complete for finished item of work for trench cutting as per MOR&H specification No.301 and as directed by the Engineer-in-Charge- (Hydraulic Excavator)

85.05

76

6481.66



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.