Municipality Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Civil Works Others
Building Construction
Opening Date11 Mar 2025
Closing Soon17 Mar 2025
Tender Amount₹ 31,86,574
Costs
EMD
₹ 31,866Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
580452Tender No
MCT/E1/404/26/2024-25Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supply, laying, jointing & testing of the following sizes 3 M double Socket PVC/SWR pipe - 6 Kg/sq.cm - Prince/Sudhakar/Kisan/Supreme or any ISI Brand and including cost and conveyance, conveyance of all materisls etc., complete as per s.s. for finished item of work. 100mm dia Pvc pipe
180
334
60125.4
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supply of premium make CPVC Pipes of 22.20mm OD Pipe- SDR 13.5
120
202
24267.6
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supply of premium make CPVC Pipes of 28.60mm OD Pipe- SDR 13.5
150
266
40048.5
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supplying and fixing of stainless steel (grade 304) railing as per approved drawing with top rail of 40mm dia medium class pipe at top and 25mm medium class horizontal pipes in the middle and providing 40mm dia medium class veritcal posts fixed with base plate at 1.50m C/C including drilling holes with mneumatic compressor for fixing railing, buffing, polishing all members of the railing thouroughly lacquer finishing to present seamless finish including cost and conveyance of all materials electrodes welding charges cost of all consumables labour charges overheads & contractors profit etc., complete for finished item of work
300
789
236931
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supplying & fixing 4" (101.60mm) Nahani Trap with jali 1st quality ISI marked fixing with white cement as per site requirements with standard practice for nominal dia 100 mm (4") including cost of cutting & making grooves in the walls and floors etc. as directed by Engineer-in-charge including cost & conveyance, of all materials to work site, all labour charges for fixing etc., complete as per s.s for finished item of work
12
287
3449.4
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supply, Transportation and fixing of 22W, +/ 10% , >/ 2300 lumens, 1200mm length LED light housing made with alluminium anodised body, wide operating voltage with PF=0.9, Surge protection: > 2KV, THD<10%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department as per IS, minimum CRI=80 etc., complete with 5 years warranty with BIS Certification with BIS Certification. LUMINAIRE MAKE: Phillips / OSRAM / GE Venture / Wipro / Crompton / Bajaj / Havells / Jaquar / IB LED / Panasonic / Halonix / HPL / Syska / Eveready / Surya / Keselec/ FIEM. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.
70
698
48911.1
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supplying & Fixing Indian make Flat Back Wash HandBasin 1st quality conforming to IS:2556-Part-4:1972 withwaste fittings like rubber plug, chain, 32 mm nominal sizeC.P. Fitting with parallel pipe thread conforming toIS:2963-1979 and fitted with 15 mm nominal boreChromium Plated Pillar Tap of 1st quality Indian make400 grams complete with standard CI brackets includingwooden block: 660 x 460 mm - Single C.P. Pillar cock, including cutting and making grooves in the walls/floors wherever required including cost & conveyance, of all materials to work site, all labour charges for all operations etc., complete. as per special specification and as directed by the engineer-in-chief for finished item of work.
6
4625
27751.62
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supplying & fixing approved make Orissa Pan white glazed W.C 1st quality ISI marked conforming to IS:2556-Part-3-2004 with "P" or "S" trap: 580 mm x 440 mm
3
2507
7522.44
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tank
2000
11
22720
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;supply of 48" (1200mm) Sweep decorative Ceiling Fan 1 Star Rated with all accessories etc., complete. Makes : Crompton / Havells / Orient
32
2272
72713.6
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supply and fixing door shutter with frame made out of PVC section and panels conforming to IS:10151-1982 having panel sizes of 100 mm x 30 mm with self extruded grooves at 40 mm x 50 mm grooves on front face and the infill panel dimension is 610 mm x 20 mm seamless hallow multi chambered PVC single panel for finished item of work.
10.08
2876
28997.44
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supply and Fixing of single leaf shutter, Door Size 0.90x2.10 mtrs with salwood Frame of sections size 75mm x 100mm with Flush Door Shutter Solid Bond Wood block board type with commercial ply on both faces of 35mm thick including cost of fixtures such as MS Powder coated Tower Bolts 250mm long 2 Nos, MS Powder coated Handles 150mm long 2 Nos, 300mm long MS Powder coated Aldrops 1No, 125mm long M.S.Powder Coated butt hinges 6Nos, 300 mm long MS Powder coated Flat latch 1No, Door stopper 2 Nos, MS Hold fasts 4Nos 230mm long cost and convenyance of all materials to site all Labour charges such as Fixing of Door Frame and shutter Fixing in position , with Hardware fixtures etc., complete for finsihed item of work.
19.13
5355
102460.09
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supplying and fixing of Unplasticised Poly Vinyl Chloride(UPVC)2Track?2Panel Sliding Doors duly manufactured using UPVC reinforced profiles(Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of 60 mm x 45 mm x 2.20 mm with reinforcement of 1.2 mm thickness, super sash with overall size of 39 mm x 75 mm x 2.20 mm with for sliding door shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.5 mm prefabricated & welded Ground floor
5.76
6888
39677.64
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars Vertically at 125mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting gate with one coat of red oxide primer including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work. window grills
1311
131
172868.46
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supplying and fixing of MS Gate using 45 x 45 x 6mm MS equal angle alround and 2 Nos 35x35x5mm Equal angles horizontal supports at 0.50m c/c, 2.00mm MS sheet at bottom 0.30m height and 12mm MS square bars Vertically at 125mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting gate with one coat of red oxide primer including cost and conveyance of all materials,Locking arrangment, Ornamental pieces etc ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work. entrance gate
150
131
19779
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;BLD-CSTN-10-25-(148) : Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work
337.59
644
217667.9
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, fine sand (screened), water, etc., to site, including operational, incidental charges and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) third floor
106.92
713
76294.9
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;looring with vitrified tiles of 1st quality, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including seigniorage charges, etc., complete for finished item of work, but including the cost of conveyance of all materials.
122.76
1150
141191.19
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Painting with weather proof Plastic Emulsion grade-1 paint to exterior faces if new walls with 3 coats of approved make and shade and colour including self prime coat including cost of all materials like Plastic Emulsion paint grade-1 ,cost of brushes, etc all operational,incidental and labour charges such as prepaing the walls applying 3 coats of Plastic Emulsion paint , scaffolding charges ,lift charges etc., complete for finished item of work,(3 coats) for all floors ( APSS No 910,911) -exterior third floor
213.84
257
55053.11
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;"Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, fine sand (screened), water, etc., to site, including operational, incidental charges on materials and all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves etc. as directed by Engineer-in-charge, complete for finished item of work (APSS No. 901 & 904) " third floor
213.84
771
165020.33
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Reinforced Brick Masonary walls of 11.5cm in CM(1:4) using fine sand and II class bricks having a crushing strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and excluding seignorage charges and including conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for finished item of work as per SS 509
79.2
1381
109442.52
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Brick masonry work for 230 mm thick walls in super structure,with cement mortar (1:6) prop (cement:sand) using Common burnt clay bricks of class as per Table-1 of IS:1077-1992 Modular or traditional size 23x11x7 cm including cost and conveyance of all materials like cement, sand, bricks, water etc., to site , including all incidental and operational, labour charges like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing etc., complete for finished item of work third floor
49.18
10289
506046.44
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Providing High Yield Strength Deformed (HYSD) Fe 500 Steel bars from primary produers like TATA, SAIL,VSP,JSW & Shyam Steel etc .as per IS 1786-1979 of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126) Third Floor
3926.34
82
324983.16
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supply and placing of Reinforced cement concrete M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, centering, shuttering, pumping, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work.(APSS No. 402) Note: 1) The quatities for cement , coarse aggregrates and fine aggregrates are for estimating purpose only. The exact quantities will be as per mix design. 2) For estimate purpose Cement Content is taken as 380Kg/Cum. As per mix design, if the cement content is found to be less than 380 kgs per cum of concrete, the difference in cost shall be deducted. ..third floor slab
17.23
13926
239891
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supply and placing of Reinforced cement concrete M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, centering, shuttering, pumping, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work.(APSS No. 402) Note: 1) The quatities for cement , coarse aggregrates and fine aggregrates are for estimating purpose only. The exact quantities will be as per mix design. 2) For estimate purpose Cement Content is taken as 380Kg/Cum. As per mix design, if the cement content is found to be less than 380 kgs per cum of concrete, the difference in cost shall be deducted. ..third floor roof beams
12.64
15781
199411.88
... More
BALANCE AND FINISHING WORKS TO SECOUND FLOOR AND TERRACE;Supply and placing of Reinforced cement concrete M25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite/trap/dolerite metal free from dust obtained by machine crushing and blasting (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, centering, shuttering, pumping, laying concrete, vibrating,curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work.(APSS No. 402) Note: 1) The quatities for cement , coarse aggregrates and fine aggregrates are for estimating purpose only. The exact quantities will be as per mix design. 2) For estimate purpose Cement Content is taken as 380Kg/Cum. As per mix design, if the cement content is found to be less than 380 kgs per cum of concrete, the difference in cost shall be deducted. ..third floor coloumns
5.83
16792
97934.15
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%