Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Building Construction
Opening Date19 Dec 2023
Closing Date27 Dec 2023
Tender Amount₹ 4,05,993 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Balija community hall;BLD-CSTN-8-9-(84) : Plastering 20mm thick two coats with base coat of 16mm thick in C.M. (1:6) and top coat of 4mm thick in C.M. (1:3) with dubara sponge finishing including cost & conveyance of all materials like cement, Sand , Water, etc., to site, all operational, labour charges for mixing mortar, finishing, scaffolding, lift charges, curing , including cutting grooves where ever necessary etc., complete for finished item of work of uneven surfaces of walls. (External walls)

108

558

60324.48

... More
Construction of Balija community hall;BLD-CSTN-5-17-(55): Brick Masonry work in CM (1:6) prop with Flyash Cement solid blocks of size 290 x 200 x 140 mm for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges, scaffolding and curing etc., cpomplete with a compresive strength not lessthan 50 kg/sqm for walls for Superstructure Walls.

8.1

6907

55954.4

... More
Construction of Balija community hall;BLD-CSTN-6-6-(61) : Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work .

14.58

5597

81615.92

... More
Construction of Balija community hall;BLD-CSTN-6-13-(68) : Construction of RR Masonary in Cement Mortor ( 1:8 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, labour charges for cutting Stones to required size and shape, mixing of Cement Mortor ,Construction, Scaffolding Charges curing etc., complete for finished item of Work .

21.6

4681

101112.19

... More
Construction of Balija community hall;BLD-CSTN-4-1-(34): Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors.( APSS No.126).

63.18

89

5644.5

... More
Construction of Balija community hall;RCC Columns - BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and FOOTINGS.b) Columns

0.54

12878

6954.17

... More
Construction of Balija community hall;Footings - BLD-CSTN-3-14-(31) - A : Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site . sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, vibrating, curing, centering and suttering charges etc.,complete but excluding seignorage charges, cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content as per IS code for PLINTH, PEDESTALS and a)FOOTINGS.

0.86

11213

9643.27

... More
Construction of Balija community hall;BLD-CSTN-3-7-(24) Using Concrete mixture all works up to Plinth Level: Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.

2.99

5019

15009.02

... More
Construction of Balija community hall;BLD-CSTN-2-1 (9): Earth work excavation in Ordinary Soil by Manual Means-Upto 3 m depth for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work including seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308).

20.52

473

9712.53



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.