Municipality Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Municipality Tender
Civil And Construction
Civil Works Others
Opening Date24 Dec 2024
Closing Date16 Jan 2025
Tender Amount₹ 20,24,833
Costs
EMD
₹ 20,248Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
564459Tender No
E1/34/36/2024-25Tender Authority
Municipality ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Development of 9B park in Bandari Layout ward no 27;Cordia Sebestena (25"x25")
20
2500
50000
... More
Development of 9B park in Bandari Layout ward no 27;Colophyllum Inophyllum (25"x25")
32
2500
80000
... More
Development of 9B park in Bandari Layout ward no 27;Cannas Indica (8x12)
8
70
560
... More
Development of 9B park in Bandari Layout ward no 27;Bougainvillea (Bag Size "13x13")
8
100
800
... More
Development of 9B park in Bandari Layout ward no 27;Sampangi (25"x25")
8
2500
20000
... More
Development of 9B park in Bandari Layout ward no 27;Plumeria Alba(25"x25")
8
1500
12000
... More
Development of 9B park in Bandari Layout ward no 27;Laying of Sabastone loaring with grass
120
743
89210
... More
Development of 9B park in Bandari Layout ward no 27;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete
40
1228
49140
... More
Development of 9B park in Bandari Layout ward no 27;Preparation of flower bed and planting: Preparation of flower bed and planting: laying 6? layer of fine red soil, covered with a thin layer of sand, watering, including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers.
120
514
61706
... More
Development of 9B park in Bandari Layout ward no 27;Carpet grass laying and ramming
152
58
8831
... More
Development of 9B park in Bandari Layout ward no 27;Bed preparation:Dressing the surface to the desired shape, laying 6? layer of fine red soil,covered with a thin layer of sand, watering, rolling with hand roller (4? thickness after rolling), including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass.
152
333
50730
... More
Development of 9B park in Bandari Layout ward no 27;cost, transport and fixing of support sticks (Stick should be minimum 6ft Ht Above ground level after fixing and girth of 20 cm at Breast ht) and Loop tying to plants
152
28
4256
... More
Development of 9B park in Bandari Layout ward no 27;Internal transporation of Bag plants to planting site (14"x18" bag plants )
152
671
1020
... More
Development of 9B park in Bandari Layout ward no 27;Transportation of plants from nursery site to planting site upto a lead of 3 km including loading and unoading (21"x21" bag plants)
152
1399
2127
... More
Development of 9B park in Bandari Layout ward no 27;Cost and conveyance of well-decomposed Farmyard manure to planting site 60 cm cube (0.50 cft/pit)
152
2558
3889
... More
Development of 9B park in Bandari Layout ward no 27;Application of red soil anf FYM including internal distribution - 60cm cube pits
152
881
1340
... More
Development of 9B park in Bandari Layout ward no 27;Digging of pits 0.60 mt X 0.60 mt X 0.60 mt (25% allowance on labour component muncipal corporation limits.
152
4829
7341
... More
Development of 9B park in Bandari Layout ward no 27;Supply Delivery and Installation of Multi Activity Play System L-20', W-15', H-12'
1
475000
475000
... More
Development of 9B park in Bandari Layout ward no 27;BLD-CSTN-12-12-(197): Painting with Synthetic Enamel paints - Two Coats - for New Wood Work, Old Wood Work & New Iron Work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).
18
138
2485
... More
Development of 9B park in Bandari Layout ward no 27;BLD-CSTN-12-4-(171): Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (All Colours) to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912.
880.5
190
167313
... More
Development of 9B park in Bandari Layout ward no 27;Fine aggregate Sand (Unscreened) for Filling and blindage (excluding Seignirage charges)
78.45
2878
225854
... More
Development of 9B park in Bandari Layout ward no 27;Observed data based on BLD-CSTN-2-9 (17) : Filling with Gravel/ excavated soils with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and rolling with 2 Tonns roller including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)
142.83
238
34114
... More
Development of 9B park in Bandari Layout ward no 27;Supply and fixing of precast cc blocks of 1.00m x 0.45 x 0.115/0.150m size for kerbing made with rubberized moulds of M-20 grade hard granite machine crushed metal including cost and conveyance of all material like of precast kerbing blocks of 600mm length true to its alignment over foundation with M10 proportion of 100 mm thick as specified by the department to form divider/ median including pointing with cement mortar ( 1:3 ) prop. Cost and conveyance of all materials like cement, sand and water etc,. To site including curing and labour charges for mixing etc, complete.
690
581
401525
... More
Development of 9B park in Bandari Layout ward no 27;BLD-CSTN-3-7-Using Concrete mixture: Plain Cement concrete nominal mix (1:4:8) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , seigniorage charges on all materials, labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed.
20.7
5175
107133
... More
Development of 9B park in Bandari Layout ward no 27;RBR-FNDN-1 -Manual means : Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by Manual means,
62.1
297
18459
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements