Municipality Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Municipality Tender

Works
Civil And Construction
Drainage Work
Pipe Line Project
Opening Date18 Jan 2025
Closing Date24 Jan 2025
Tender Amount₹ 6,66,093 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC pipes;Supply and placing separation membrane of impermeable plastic sheeting 125 micron thick under pavement slab including cost and conveyance etc. complete - 1 sq.m.

300

21

6474

... More
RCC pipes;Providing Vibrated Cement Concrete (1:4:8) mix using 40mm size HBG crushed stone aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100 (5th Revision) and as directed by the Engineer-in-Charge for base coarse below CC Pavement.

24

4938

118528

... More
RCC pipes;RBR- FNDN-2 Collection , supply and filling of HBG Stone chipes 2.36mm and below spall from approved quarry to work site and stocking at work site to dept guage for premeasurements including cost and conveyance of all materials and labour charges etc., complete as per standard specification clause 305.39 MORD & 304 MORTH

15

1318

19780

... More
RCC pipes;Earthwork in excavation for structures as per drawing and technical specifications including setting out construction of shoring and bracing removal of stumps and other deleterious material and disposal up to a lead of 50m, dressing of sides and bottom and back filling in trenches with excavated suitable material asper technical specification.

60

297

17834

... More
RCC pipes;Constructing 457.2 mm x 457.2 mm(1'6" x 1' 6") brick in cm 1.6 prop masonry inspection chambers upto 914.4 mm (3'0") fitted with high weight 457.2 mm x 457.2 mm (1'6" x 1'6") C.I. frame and cover of 20 kg etc. complete.

7

5237

36664

... More
RCC pipes;Lowring the RCC S/S pipes carefully into the ready made trenches Laying them ture to alignment and gradient, jointing with rubber rings and testing including filling with water with water lead up to 500 meters including cost of reberrings

60

191

11475

... More
RCC pipes;Manufactures supply and delivery of RCC Spun/vibrated cost (reinforced) socket and spigot pipes conforming TO B.I. S458/2003. EX-Factory (Rate per meter of Effetive Length) Excluding Transportati Taxes, Duties, etc complete. NP3 300mm dia

60

1643

98595

... More
RCC pipes;RBR- FNDN-2 Collection , supply and filling of HBG Stone chipes 2.36mm and below spall from approved quarry to work site and stocking at work site to dept guage for premeasurements including cost and conveyance of all materials and labour charges etc., complete as per standard specification clause 305.39 MORD & 304 MORTH

5.4

1318

7121

... More
RCC pipes;Earthwork in excavation for structures as per drawing and technical specifications including setting out construction of shoring and bracing removal of stumps and other deleterious material and disposal up to a lead of 50m, dressing of sides and bottom and back filling in trenches with excavated suitable material asper technical specification.

32.4

475

15409

... More
RCC pipes;Collection, supply and Spreading of good hard gravel stocking at site for premeasurement and sectioning to chamber, watering, rolling with HRR irrespective of thickess in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental charges, labour charges, hire charges of T&P etc., complete for finished item of work.

18

565

10184



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.